Modulus Company
- Based in
- San Francisco
- On San Francisco permits
- Jun 2010 to Jun 2025
- Last 24 months
- 1 permit filed
11 permits since 2000: 10 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 10, 2025 | Completed final sign-off Oct 2025 | 309 Steiner St | unit d: back of the property (rear building). remodel kitchen in kind. add new fixtures, add 6 can lights. remodel 2nd floor bathroom, new fixtures, 2 can lights, (e) locations.Details
unit d: back of the property (rear building). remodel kitchen in kind. add new fixtures, add 6 can lights. remodel 2nd floor bathroom, new fixtures, 2 can lights, (e) locations. | $40,000 |
| Apr 8, 2021 | Completed final sign-off Jan 2022 | 1909 Union St | revision to pa 202012301932. add ramp between two spaces. add door at rear.Details
revision to pa 202012301932. add ramp between two spaces. add door at rear. | $10,000 |
| Dec 30, 2020 | Completed final sign-off Jan 2022 | 1909 Union St | 1)expand existing epicurean trader store into adjacent cafe by providing new opening in between demising wall. 2)change facade of cafe to match epicurean trader facade. new paint, new trim, and awning.Details
1)expand existing epicurean trader store into adjacent cafe by providing new opening in between demising wall. 2)change facade of cafe to match epicurean trader facade. new paint, new trim, and awning. | $40,000 |
| Jun 5, 2018 | Never finaled issued Jun 2018, no final | 145 Bartlett St | regular repair and maintenamce of front stairs; wood treads and rustic wood siding to match existing; less than 50% repairDetails
regular repair and maintenamce of front stairs; wood treads and rustic wood siding to match existing; less than 50% repair | $600 |
| May 14, 2018 | Completed final sign-off Apr 2019 | 965 Elizabeth St | kitchen remodel. replace cabinets/fixtures and add 4 new can lightsDetails
kitchen remodel. replace cabinets/fixtures and add 4 new can lights | $15,000 |
| Aug 9, 2017 | Completed final sign-off Oct 2017 | 965 Elizabeth St | revision to 2017-0601-8183, move proposed closet largerDetails
revision to 2017-0601-8183, move proposed closet larger | $1,000 |
| Jun 1, 2017 | Completed final sign-off Oct 2017 | 965 Elizabeth St | 1st floor - legalize (e) bathroom and create bedroom, upgrades will consist of upgrade bathroom and electricalDetails
1st floor - legalize (e) bathroom and create bedroom, upgrades will consist of upgrade bathroom and electrical | $25,000 |
| Oct 5, 2015 | Completed final sign-off Nov 2015 | 178 Albion St | to comply with reprot of physical inspection application cc - 7808: provide proper guardrail protection at tthe rear stairs.Details
to comply with reprot of physical inspection application cc - 7808: provide proper guardrail protection at tthe rear stairs. | |
| May 6, 2014 | Completed final sign-off Apr 2015 | 151 Alice B Toklas Pl | unit #709: remove existing tile and fixutres and replace with new. add 2 new lights and pocket doors; compliance with ord 155-13 not requiredDetails
unit #709: remove existing tile and fixutres and replace with new. add 2 new lights and pocket doors; compliance with ord 155-13 not required | $10,000 |
| Jul 6, 2011 | Completed final sign-off Nov 2011 | 1635 Castro St | remodel 2nd. floor bath, change shower to tub. not moving or adding any walls, all work on the main level.Details
remodel 2nd. floor bath, change shower to tub. not moving or adding any walls, all work on the main level. | $15,000 |
| Jun 21, 2010 | Completed final sign-off Nov 2010 | 1635 Castro St | remodel existing bath, change tub to shower , add lightsDetails
remodel existing bath, change tub to shower , add lights | $15,000 |