Modern Insight Design & Build Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2008 to Oct 2009
- Last 24 months
- 0 permits filed
8 permits since 2000: 6 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 22, 2009 | Completed final sign-off Feb 2010 | 486 Sanchez St | replace (e) fixed windows w/ operable. repair door hardware per violation/complaint 200905952.Details
replace (e) fixed windows w/ operable. repair door hardware per violation/complaint 200905952. | $10,000 |
| Aug 28, 2009 | Never finaled issued Sep 2009, no final | 186 Lippard Av | rev. to pa# 2009.03.18.4394s1. remove existing slab and pour concrete footing. frame floor, walls, roof and ceiling.Details
rev. to pa# 2009.03.18.4394s1. remove existing slab and pour concrete footing. frame floor, walls, roof and ceiling. | $40,000 |
| Apr 24, 2009 | Completed final sign-off May 2009 | 711 Page St | remove existing guard rial at 3rd fl deck at rear of property bring guardrail up to code. install new redwood 4'x4' posts at 42' height and railing.Details
remove existing guard rial at 3rd fl deck at rear of property bring guardrail up to code. install new redwood 4'x4' posts at 42' height and railing. | $3,200 |
| Apr 9, 2009 | Completed final sign-off Jul 2009 | 377 Oak St | work @ upper unit only. in kitchen: demo (e) cabinets, appliances, 2 windows, lath / plaster, flooring, extend gas line 5'. add 7 receptacles, under cab lighting, recessed cans lights. 4 pendant light. install new sheetrock & insulation. new cabinetry & shelving. install 2 new insert windows at (e)Details
work @ upper unit only. in kitchen: demo (e) cabinets, appliances, 2 windows, lath / plaster, flooring, extend gas line 5'. add 7 receptacles, under cab lighting, recessed cans lights. 4 pendant light. install new sheetrock & insulation. new cabinetry & shelving. install 2 new insert windows at (e) | $45,000 |
| Mar 18, 2009 | Expired or cancelled expired Jan 2011 | 186 Lippard Av | single story addition @ rear of building to enlarge existing bedroom & add (n) bathroom and closets.Details
single story addition @ rear of building to enlarge existing bedroom & add (n) bathroom and closets. | $50,000 |
| Dec 22, 2008 | Completed final sign-off Feb 2009 | 55 Murray St | remove stucco & damaged framing at west wall of property between bath window & adjoining bedroom window. approx 65 sq. ft. replace damaged framing & repair stucco.Details
remove stucco & damaged framing at west wall of property between bath window & adjoining bedroom window. approx 65 sq. ft. replace damaged framing & repair stucco. | $3,000 |
| Dec 5, 2008 | Completed final sign-off Feb 2009 | 55 Murray St | bathroom remodel. demo to studs, replace bathtub, toilet, vanity, window with like kind. install tile & glass enclosure over tub. install new gfci & exhaust fan. remove all galvanized water lines & replace with copper. replace shower valve.Details
bathroom remodel. demo to studs, replace bathtub, toilet, vanity, window with like kind. install tile & glass enclosure over tub. install new gfci & exhaust fan. remove all galvanized water lines & replace with copper. replace shower valve. | $30,000 |
| Jul 28, 2008 | Completed final sign-off Dec 2008 | 48 Surrey St | bathroom&kitchen remodel-new cabinets,hood.replace clawfoot tub w/drop-in.remove&replace tile floor, interior walls,vanity,skylite,window,shelving.new plumbing connection&shower valve.move gas line for stove.window & skylite replace in kind(size &location). add exhaust fan in bathroom.Details
bathroom&kitchen remodel-new cabinets,hood.replace clawfoot tub w/drop-in.remove&replace tile floor, interior walls,vanity,skylite,window,shelving.new plumbing connection&shower valve.move gas line for stove.window & skylite replace in kind(size &location). add exhaust fan in bathroom. | $25,000 |