Midway Enterprises, Inc.
- Based in
- Lake Zurich
- On San Francisco permits
- Nov 2015 to Jul 2018
- Last 24 months
- 0 permits filed
14 permits since 2000: 7 completed, 7 never finaled.
Of the 7 never-finaled permits, 7 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 27, 2018 | Never finaled issued Jul 2018, no final | 1625 Post St | renew ba # 201612235869. to obtain final inspection for work approved under pa # 201612235869. all work is completeDetails
renew ba # 201612235869. to obtain final inspection for work approved under pa # 201612235869. all work is complete | |
| May 9, 2018 | Completed final sign-off Sep 2018 | 1625 Post St | revision to 201803083187 reduction/clarification of scope (no work on annex 1st flr)Details
revision to 201803083187 reduction/clarification of scope (no work on annex 1st flr) | |
| Mar 8, 2018 | Completed final sign-off Sep 2018 | 1625 Post St | revision of new hvac units in select guest rooms. revision to pa #201603081496, r1.Details
revision of new hvac units in select guest rooms. revision to pa #201603081496, r1. | |
| Mar 1, 2018 | Completed final sign-off Sep 2018 | 1625 Post St | revision to pa 2017-1206-5644, revision to electrical drawings. reduction in scope - elimination of all new electrical receptacles.Details
revision to pa 2017-1206-5644, revision to electrical drawings. reduction in scope - elimination of all new electrical receptacles. | |
| Dec 6, 2017 | Completed final sign-off Sep 2018 | 1625 Post St | revision to electrical reduction in scope to corridor lights. revision to pa 2016-0308-1496Details
revision to electrical reduction in scope to corridor lights. revision to pa 2016-0308-1496 | |
| Apr 19, 2017 | Never finaled issued Apr 2017, no final | 1625 Post St | basement, 1st & mezz - revision to mep pa#201612235869. install fd's in place of fsd's per cbc 717.5.5 exception for 1 smoke compartment comprising basement and 1st floor/mezz, minor rerouting of hvac. resulting in zero total fsd's for ti of renovated lobby space under arch pa #201603253085.Details
basement, 1st & mezz - revision to mep pa#201612235869. install fd's in place of fsd's per cbc 717.5.5 exception for 1 smoke compartment comprising basement and 1st floor/mezz, minor rerouting of hvac. resulting in zero total fsd's for ti of renovated lobby space under arch pa #201603253085. | |
| Feb 24, 2017 | Never finaled issued Feb 2017, no final | 1625 Post St | revision to app#201602190034. tower guest room relocation of copper plbmg piping to be run exposed on the concrete deck. previously the copper piping was to be concealed.Details
revision to app#201602190034. tower guest room relocation of copper plbmg piping to be run exposed on the concrete deck. previously the copper piping was to be concealed. | |
| Dec 23, 2016 | Never finaled issued Dec 2016, no final | 1625 Post St | bsmt, 1st & mezz: mechanical work associated with two new restrooms, pantry and renovated lobby space ref 2016-0325-3085. fire alarm deferred.Details
bsmt, 1st & mezz: mechanical work associated with two new restrooms, pantry and renovated lobby space ref 2016-0325-3085. fire alarm deferred. | $20,000 |
| Oct 27, 2016 | Never finaled issued Dec 2016, no final | 1625 Post St | replacement and updated signs to be installed as required per code.Details
replacement and updated signs to be installed as required per code. | $16,875 |
| Oct 14, 2016 | Never finaled issued Nov 2016, no final | 1625 Post St | deferred permit for electrical work under pa 2016-0219-0034Details
deferred permit for electrical work under pa 2016-0219-0034 | $25,000 |
| Mar 25, 2016 | Completed final sign-off Aug 2018 | 1625 Post St | the lobby & garden levels involves adding a pantry, a bar & two unisex restrooms. it will also demolish the existing stairs by the entry.Details
the lobby & garden levels involves adding a pantry, a bar & two unisex restrooms. it will also demolish the existing stairs by the entry. | $200,000 |
| Mar 8, 2016 | Completed final sign-off Sep 2018 | 1625 Post St | the scope of work for the annex building involves renovation of existing guestrooms & common areas. there will be 7 new rooms added to the existing structure but no square footage will be added or alterated.Details
the scope of work for the annex building involves renovation of existing guestrooms & common areas. there will be 7 new rooms added to the existing structure but no square footage will be added or alterated. | $200,000 |
| Feb 19, 2016 | Completed final sign-off Aug 2018 | 1625 Post St | renovation 156 extg guest rooms and common space such as corridors from level 4 to 16 in the tower only. no square footage is added. total proposed work is 70,368 sq ft occupant load is unchanged. separte mep permitDetails
renovation 156 extg guest rooms and common space such as corridors from level 4 to 16 in the tower only. no square footage is added. total proposed work is 70,368 sq ft occupant load is unchanged. separte mep permit | $200,000 |
| Nov 30, 2015 | Never finaled issued Oct 2016, no final | 1625 Post St | demolish mezzanine level above lobby, decrease sq. footage and occupant load. total is 1,206 sq ft 121 occupant load is reduced. mep, life safety deferred.Details
demolish mezzanine level above lobby, decrease sq. footage and occupant load. total is 1,206 sq ft 121 occupant load is reduced. mep, life safety deferred. | $90,000 |