Midex Construction
- Based in
- Santa Clara
- On San Francisco permits
- Aug 2016 to Sep 2017
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 21, 2017 | Completed final sign-off Dec 2017 | 77 Dow Pl | unit # 311 bathroom remodeling, replace enclosed shower cabin new tiles on the wall & floor, replace water fixtures with new ones, not to change positionDetails
unit # 311 bathroom remodeling, replace enclosed shower cabin new tiles on the wall & floor, replace water fixtures with new ones, not to change position | $10,000 |
| Aug 15, 2016 | Completed final sign-off Mar 2017 | 801 47th Av | #2- paint walls, replace carpet with engineered hardwood floor, rebuild kitchen cabinets, replace bathroom tiles (just floor), remove fireplace & firebox from middle of the room at 3rd floor unit, termite gas, relocate electric switch, no structural, patch floor & ceilingDetails
#2- paint walls, replace carpet with engineered hardwood floor, rebuild kitchen cabinets, replace bathroom tiles (just floor), remove fireplace & firebox from middle of the room at 3rd floor unit, termite gas, relocate electric switch, no structural, patch floor & ceiling | $10,000 |