Midas Construction
- Based in
- Dublin
- On San Francisco permits
- Mar 2000 to Apr 2017
- Last 24 months
- 0 permits filed
10 permits since 2000: 10 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 12, 2017 | Completed final sign-off Apr 2017 | 595 Arguello Bl | apt. 2: interior ktichen remodel, replace kitchen cabinets, counter top, tile floor and paint. upgrade sub-panel. no structural work and exterior work.Details
apt. 2: interior ktichen remodel, replace kitchen cabinets, counter top, tile floor and paint. upgrade sub-panel. no structural work and exterior work. | $14,500 |
| Feb 17, 2010 | Completed final sign-off May 2010 | 2661 Green St | replace framing dryrot on back side of the house (1st floor) & about 12', replace foundation, replace two windows & three doors at rear, windows & door not facing the street.Details
replace framing dryrot on back side of the house (1st floor) & about 12', replace foundation, replace two windows & three doors at rear, windows & door not facing the street. | $8,900 |
| Oct 22, 2009 | Completed final sign-off May 2010 | 2659 Green St | dryrot & water damage replacement on back side of the house (1st floor) and change 1 window for water damage, isntall & relocate the wall sconcer. relocate & install the new wall sconcer at front of house.Details
dryrot & water damage replacement on back side of the house (1st floor) and change 1 window for water damage, isntall & relocate the wall sconcer. relocate & install the new wall sconcer at front of house. | $5,460 |
| Jun 13, 2008 | Completed final sign-off Jan 2009 | 1960 Vallejo St | kitchen & bathroom remodeling, replacement of 2 kitchen windows & 1 # 1 bathroom window, electrical upgrades in kitchen & 3 bathrooms throught. no structural change, new wall on bathroom for plumbing pipe.Details
kitchen & bathroom remodeling, replacement of 2 kitchen windows & 1 # 1 bathroom window, electrical upgrades in kitchen & 3 bathrooms throught. no structural change, new wall on bathroom for plumbing pipe. | $78,000 |
| Oct 5, 2007 | Completed final sign-off Jun 2008 | 2659 Green St | second floor playroom remodel and rear deck/stair remodel. playroom remodel includes window replacement, addition of window and french door. change and add lighting, new crown molding. rear yard work includes reconfigure stair for new balcony, new footing and retaining wall.Details
second floor playroom remodel and rear deck/stair remodel. playroom remodel includes window replacement, addition of window and french door. change and add lighting, new crown molding. rear yard work includes reconfigure stair for new balcony, new footing and retaining wall. | $42,500 |
| Mar 8, 2007 | Completed final sign-off Jul 2007 | 2659 Green St | fourth floor bathroom remodel. bedroom #1 and #2 closet remodel. and replace bedroom #1 and bedroom #2 window. bathroom remodeln included plumbing & electrical work and change window (window will be match existing). bedroom #1 & bedroom #2 closet remodel included electrical work.Details
fourth floor bathroom remodel. bedroom #1 and #2 closet remodel. and replace bedroom #1 and bedroom #2 window. bathroom remodeln included plumbing & electrical work and change window (window will be match existing). bedroom #1 & bedroom #2 closet remodel included electrical work. | $38,500 |
| Dec 13, 2002 | Completed final sign-off Jul 2003 | 2209 Sutter St | remodeled kitchen, two & half bathroom, removed (e) fireplace, add (n) metal fireplace in living rooDetails
remodeled kitchen, two & half bathroom, removed (e) fireplace, add (n) metal fireplace in living roo | $87,500 |
| Jun 14, 2001 | Completed final sign-off Aug 2002 | 274 Guerrero St | new wood framed terrace at main level w/ stairway remodel kitchen, new addition to cantilevrered bayDetails
new wood framed terrace at main level w/ stairway remodel kitchen, new addition to cantilevrered bay | $80,000 |
| Jul 28, 2000 | Completed final sign-off Sep 2000 | 1960 Vallejo St | interior demo of bathroom and change into officeDetails
interior demo of bathroom and change into office | $4,300 |
| Mar 8, 2000 | Completed final sign-off Dec 2000 | 1960 Vallejo St | kitchen, laundry & bathrm remodel demo framing plumb elect finish trim sheet metal wrk new closetDetails
kitchen, laundry & bathrm remodel demo framing plumb elect finish trim sheet metal wrk new closet | $89,000 |