Michael Paul Murray
- Based in
- San Francisco
- On San Francisco permits
- May 2023 to Aug 2026
- Last 24 months
- 10 permits filed
11 permits since 2000: 6 completed, 4 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 14, 2026 | Completed final sign-off Sep 2026 | 722 22nd Av | rear of bldg: there is 20ft extension, we will replace dryrotted siding approx 1500 sq ft on both sides of rear of bldg, with hardi plank lap siding, all work in rear of bldg. like for like repair.Details
rear of bldg: there is 20ft extension, we will replace dryrotted siding approx 1500 sq ft on both sides of rear of bldg, with hardi plank lap siding, all work in rear of bldg. like for like repair. | $30,000 |
| Aug 11, 2026 | Completed final sign-off Aug 2026 | 1253 Palou Av | revision to pa #202605292187, remove non-conforming rear deck and stairs. remove deck access door, replace with a windows.Details
revision to pa #202605292187, remove non-conforming rear deck and stairs. remove deck access door, replace with a windows. | $1,000 |
| Jul 27, 2026 | Expired or cancelled suspend Oct 2026 | 812 Laguna Honda Bl | to comply with nov #202427551. legalize deck and rear door.Details
to comply with nov #202427551. legalize deck and rear door. | |
| Jun 15, 2026 | In progress issued Jun 2026 | 210 Stillings Av | bathroom remodel from tub to walk-in shower, new sink and new toilet. same location.Details
bathroom remodel from tub to walk-in shower, new sink and new toilet. same location. | $28,000 |
| May 29, 2026 | Completed final sign-off Aug 2026 | 1253 Palou Av | comply with nov#: 202538242. top flr: rear elevation -repair window. ground flr: rear elevation - window infill. dry rot siding replacement as needed approximately 150sf. posts reinforcement. east window infill towards rear. east elev. infill.Details
comply with nov#: 202538242. top flr: rear elevation -repair window. ground flr: rear elevation - window infill. dry rot siding replacement as needed approximately 150sf. posts reinforcement. east window infill towards rear. east elev. infill. | $500 |
| May 12, 2026 | Completed final sign-off Sep 2026 | 556 Waller St | rear yard new deck and stairs.Details
rear yard new deck and stairs. | $20,000 |
| Mar 23, 2026 | Completed final sign-off May 2026 | 65 Prosper St | repair rear leaking deck. less than 50% non street visible. repair and patch leaking stucco, demo and replace in kind. repair loose and cracked stucco at front entry stairs. street facing repair. less than 50% deck repairDetails
repair rear leaking deck. less than 50% non street visible. repair and patch leaking stucco, demo and replace in kind. repair loose and cracked stucco at front entry stairs. street facing repair. less than 50% deck repair | $28,000 |
| Jan 30, 2026 | In progress issued Feb 2026 | 30 Thor Av | replace partial kitchen cabinets; new electrical and plumbing. not a full kitchen remodel.Details
replace partial kitchen cabinets; new electrical and plumbing. not a full kitchen remodel. | $25,000 |
| Oct 22, 2025 | Completed final sign-off Jan 2026 | 210 Stillings Av | replace (6) existing windows(2 at front, 4 at back), and one exterior back door. remove front and back vinyl siding. install 2 layers of skim coat stucco in the front of buildingDetails
replace (6) existing windows(2 at front, 4 at back), and one exterior back door. remove front and back vinyl siding. install 2 layers of skim coat stucco in the front of building | $28,000 |
| Oct 1, 2025 | In progress issued Oct 2025 | 30 Thor Av | revision to pa 202305036995 construction has revealed shared foundation/north neighbor existing foundation to remain & underpinned no work in adjacent property document 2x8 floor joists. preserve front foundation & underpin holdown anchorsDetails
revision to pa 202305036995 construction has revealed shared foundation/north neighbor existing foundation to remain & underpinned no work in adjacent property document 2x8 floor joists. preserve front foundation & underpin holdown anchors | |
| May 3, 2023 | In progress issued Jul 2025 | 30 Thor Av | to comply with planning 2022-003729enf,nov 202182479:enlarge g/f to rear yard to accomodate new bedroom.provide new windows and doors on 2/f. rebuild (e) deck, reconfigure (e) rear facade windows and doors.Details
to comply with planning 2022-003729enf,nov 202182479:enlarge g/f to rear yard to accomodate new bedroom.provide new windows and doors on 2/f. rebuild (e) deck, reconfigure (e) rear facade windows and doors. | $85,000 |