Michael Clarke Construction
- Based in
- Fairfax
- On San Francisco permits
- Jan 2005 to Jun 2025
- Last 24 months
- 1 permit filed
44 permits since 2000: 34 completed, 2 in progress, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 27, 2025 | In progress issued Dec 2025 | 3580 Pierce St | re-roof existing roof structure. replace existing 259 sf roof deck in kind in order to re-roof the area below.Details
re-roof existing roof structure. replace existing 259 sf roof deck in kind in order to re-roof the area below. | $15,000 |
| Apr 30, 2024 | In progress issued May 2024 | 1877 Church St | revision to permit application #201909050773. added a new detail for the property line south wall-see s/a0.3. per field inspector's request.Details
revision to permit application #201909050773. added a new detail for the property line south wall-see s/a0.3. per field inspector's request. | |
| Feb 28, 2024 | Completed final sign-off Apr 2026 | 412 Mississippi St | demo extg stair from 2nd floor to ground floor and replace as drawn. demo extg bath at ground floor and replace as drawn. relocate laundry as drawn. add bar to ground floor. replace extg windows at ground fl. 550 for framing and foundation.Details
demo extg stair from 2nd floor to ground floor and replace as drawn. demo extg bath at ground floor and replace as drawn. relocate laundry as drawn. add bar to ground floor. replace extg windows at ground fl. 550 for framing and foundation. | $49,000 |
| Dec 21, 2023 | Completed final sign-off Jun 2026 | 55 Dolores St | new roof deck(659 sq ft)pethouse extension (55 sq ft) structrual work as indicated on the plans.Details
new roof deck(659 sq ft)pethouse extension (55 sq ft) structrual work as indicated on the plans. | $82,000 |
| Mar 3, 2023 | Completed final sign-off Nov 2023 | 1608 Lyon St | remodel bathroom: tub, shower, sink, toilet, retile: remodel kitchen- gas stove, fridge, cabinets, dishwasher, 3 windows- replaced, same size like for like. not visible from street. non structural.Details
remodel bathroom: tub, shower, sink, toilet, retile: remodel kitchen- gas stove, fridge, cabinets, dishwasher, 3 windows- replaced, same size like for like. not visible from street. non structural. | $30,000 |
| Jul 20, 2022 | Never finaled issued Sep 2022, no final | 1877 Church St | rev to pa201909050773: second floor deck to be extended 10ft into rear yard as drawn. revised engineering included for larger deck design. change art studio to media room on the ground floor.Details
rev to pa201909050773: second floor deck to be extended 10ft into rear yard as drawn. revised engineering included for larger deck design. change art studio to media room on the ground floor. | $5,000 |
| Jun 23, 2021 | Completed final sign-off Jul 2023 | 5 Fella Pl | unit 202: renovate (e) bathroom and (e) kitchen. new flooring, lighting. replace (e) wood fireplace with a gas fireplace. replace (e) wall heater with electric radiant heaters.Details
unit 202: renovate (e) bathroom and (e) kitchen. new flooring, lighting. replace (e) wood fireplace with a gas fireplace. replace (e) wall heater with electric radiant heaters. | $30,000 |
| Sep 5, 2019 | Completed final sign-off Aug 2024 | 1877 Church St | demolition of (e) roof & ceiling framing on the 2nd level of all spaces east of the original victorian house. construction of a new full bath, half bath, laundry closet, master bedroom & den as drawn. new deck & stairs to the garden. kitchen renovationDetails
demolition of (e) roof & ceiling framing on the 2nd level of all spaces east of the original victorian house. construction of a new full bath, half bath, laundry closet, master bedroom & den as drawn. new deck & stairs to the garden. kitchen renovation | $75,000 |
| Mar 19, 2019 | Completed final sign-off Jan 2021 | 179 Peralta Av | 1st flr, convert (e) storage space to conditioned, habitable space, construct (n) stair, remodel kitchen, bath & powder room, add bedroom, fam room, bath, laundry within (e) building envelopeDetails
1st flr, convert (e) storage space to conditioned, habitable space, construct (n) stair, remodel kitchen, bath & powder room, add bedroom, fam room, bath, laundry within (e) building envelope | $287,500 |
| Dec 13, 2017 | Completed final sign-off Feb 2019 | 2087 17th Av | (e) ground floor to be remodeled to accommodate a large master suite with bedroom office and bath. a mud room with bar & laundry and guest bath too. garge & utlities to remain in smaller sizeDetails
(e) ground floor to be remodeled to accommodate a large master suite with bedroom office and bath. a mud room with bar & laundry and guest bath too. garge & utlities to remain in smaller size | $75,000 |
| Oct 20, 2015 | Never finaled issued Dec 2015, no final | 584 Anderson St | new dormer at roof and addition of bathroom on 2nd floor. remove fireplace and pocket doors on 1st floor.Details
new dormer at roof and addition of bathroom on 2nd floor. remove fireplace and pocket doors on 1st floor. | $20,000 |
| May 29, 2015 | Completed final sign-off Oct 2015 | 49 Downey St | kitchen remodel; replace cabinets and applicances; upgrade elec & plumbing; to comply woth cec150.0(k)3Details
kitchen remodel; replace cabinets and applicances; upgrade elec & plumbing; to comply woth cec150.0(k)3 | $22,000 |
| Feb 6, 2014 | Never finaled issued Feb 2014, no final | 151 Potrero Av | construct new 5' wide mezzanine for artists and upgrade electrical and introdue heating into spaces. upgrade ada compliance with new front entry door, ada closing hardware and push button at exterior. n/a for maher ordinance ~kf21&~kf21&-133Details
construct new 5' wide mezzanine for artists and upgrade electrical and introdue heating into spaces. upgrade ada compliance with new front entry door, ada closing hardware and push button at exterior. n/a for maher ordinance ~kf21&~kf21&-133 | $30,000 |
| Nov 27, 2013 | Completed final sign-off Feb 2016 | 949 Elizabeth St | foundation upgrade. basement conversion. new staircase. new guest room, new bathroom, new family room, gym. 1st floor: remodel bathroom. 2nd floor: remodel entire floor, new layout, add new bathroom, new replacement windows. 3 relocate bedroom.Details
foundation upgrade. basement conversion. new staircase. new guest room, new bathroom, new family room, gym. 1st floor: remodel bathroom. 2nd floor: remodel entire floor, new layout, add new bathroom, new replacement windows. 3 relocate bedroom. | $200,000 |
| Nov 26, 2013 | Completed final sign-off Dec 2015 | 457 Valley St | horizontal rear addition, interior remodel to (e) 2-story residential bldg over basement & structural upgrade. lift front of building 3'-6" (grid e to grid c.6).Details
horizontal rear addition, interior remodel to (e) 2-story residential bldg over basement & structural upgrade. lift front of building 3'-6" (grid e to grid c.6). | $380,000 |
| Nov 6, 2013 | Completed final sign-off Dec 2015 | 457 Valley St | replace existing dilapidated site retaining walls at rear yard, place new concrete decks & regrade as required.Details
replace existing dilapidated site retaining walls at rear yard, place new concrete decks & regrade as required. | $50,000 |
| Sep 30, 2013 | Completed final sign-off Dec 2015 | 457 Valley St | voluntary foundation upgrade & super structure upgrade @ basement level for seismic stability. temporary lift & shoring as required for construction access.Details
voluntary foundation upgrade & super structure upgrade @ basement level for seismic stability. temporary lift & shoring as required for construction access. | $30,000 |
| Sep 17, 2013 | Never finaled issued Sep 2013, no final | 457 Valley St | interior soft demo of fixtures + sheetrock, demo max 50% of wall & ceiling sheetrock, future remodel under separate permit.Details
interior soft demo of fixtures + sheetrock, demo max 50% of wall & ceiling sheetrock, future remodel under separate permit. | $10,000 |
| Sep 9, 2013 | Completed final sign-off Sep 2014 | 448 Fair Oaks St | kitchen remodel: (n) cabinets, (n) electrical bathroom remodel: (n) window, (n) shower, (n) tile living room: replace window, replace kitchen skylight in-kind. all work done on 3rd fl. u-factor shall not exceed 0.4Details
kitchen remodel: (n) cabinets, (n) electrical bathroom remodel: (n) window, (n) shower, (n) tile living room: replace window, replace kitchen skylight in-kind. all work done on 3rd fl. u-factor shall not exceed 0.4 | $25,000 |
| Jun 4, 2013 | Completed final sign-off Mar 2014 | 2670 17th Av | renovate & finish unfinished basement space to create more living space, move laundry & add bathrm. close off new living space from garage. move stairs slightly in order to make them to code. change single exterior door to sliding doorDetails
renovate & finish unfinished basement space to create more living space, move laundry & add bathrm. close off new living space from garage. move stairs slightly in order to make them to code. change single exterior door to sliding door | $65,000 |
| May 1, 2013 | Never finaled issued May 2013, no final | 3178 Washington St | revision to app#201303273122. framing design alteration.Details
revision to app#201303273122. framing design alteration. | |
| Apr 19, 2013 | Completed final sign-off Mar 2014 | 222 29th St | rear deck addition, 5'-0" deep x 23'-0" longDetails
rear deck addition, 5'-0" deep x 23'-0" long | $6,000 |
| Mar 27, 2013 | Completed final sign-off Aug 2013 | 3178 Washington St | arch/structural work at ground & 1st floor for removal of seleect interior walls at 1st floor including 1st floor bathroom, dining, kitchen & living room. minor interior remodel work on 1st floor. relocate toilet, replace some finishesDetails
arch/structural work at ground & 1st floor for removal of seleect interior walls at 1st floor including 1st floor bathroom, dining, kitchen & living room. minor interior remodel work on 1st floor. relocate toilet, replace some finishes | $20,000 |
| Feb 26, 2013 | Completed final sign-off Mar 2014 | 222 29th St | minor alteration, interior on 2nd floor level. kitchen & bathroom remodel. (n) beam & column.Details
minor alteration, interior on 2nd floor level. kitchen & bathroom remodel. (n) beam & column. | $8,000 |
| Apr 20, 2012 | Completed final sign-off Mar 2013 | 222 29th St | remodel 2 living spaces into master bedroom and master bath. add 1 skylight. relocate heating vents. all insterior work except skylight.Details
remodel 2 living spaces into master bedroom and master bath. add 1 skylight. relocate heating vents. all insterior work except skylight. | $50,000 |
| Jun 18, 2010 | Completed final sign-off Oct 2011 | 517 Day St | reconfigure living room & dining room, add a bathroom at master bedroom, enclose existing lightwell & reconfigure stair to basement, add a bedroom & bathroom at basement.Details
reconfigure living room & dining room, add a bathroom at master bedroom, enclose existing lightwell & reconfigure stair to basement, add a bedroom & bathroom at basement. | $220,000 |
| May 10, 2010 | Completed final sign-off Jan 2011 | 1201 Douglass St | gr.fl: (n) tile entry,bedrm closet.2ndfl: remodel kitch, new cabs, appliances,lighting, replace front rm lights,(n)pocket drs/3rdfl: remodel master bath and 2nd bath. reconfigure closet/bath, partition walls, relocate w/d. all flrs:repaint int, refinish all floorsDetails
gr.fl: (n) tile entry,bedrm closet.2ndfl: remodel kitch, new cabs, appliances,lighting, replace front rm lights,(n)pocket drs/3rdfl: remodel master bath and 2nd bath. reconfigure closet/bath, partition walls, relocate w/d. all flrs:repaint int, refinish all floors | $80,000 |
| Aug 8, 2008 | Completed final sign-off Dec 2008 | 53 Cumberland St | work is at 55 cumberland: 2nd floor-remodel kitchen, bathroom and replace windows. new kitchen cabinets, fixtures, new bathroom fixtures, new windows, new wood floor & lightsDetails
work is at 55 cumberland: 2nd floor-remodel kitchen, bathroom and replace windows. new kitchen cabinets, fixtures, new bathroom fixtures, new windows, new wood floor & lights | $38,500 |
| Jul 25, 2008 | Completed final sign-off Jan 2009 | 1101 Green St | work @ unit# 502 only. remodel bathroom. change fixtures, add shower door in bathroom.Details
work @ unit# 502 only. remodel bathroom. change fixtures, add shower door in bathroom. | $6,400 |
| Mar 21, 2008 | Completed final sign-off Jul 2008 | 465 Ellsworth St | adding a fixed skylight to (e) pa# 2008-0207-4282-minor electrical changes to submitted planDetails
adding a fixed skylight to (e) pa# 2008-0207-4282-minor electrical changes to submitted plan | $1,000 |
| Feb 7, 2008 | Completed final sign-off Jul 2008 | 465 Ellsworth St | kitchen and bathroom remodel with minor structural work to enlarge an existing cased opening btn kithchen and dining rm. replace single patio door to double french doors. infill door and windows on rear elevation.Details
kitchen and bathroom remodel with minor structural work to enlarge an existing cased opening btn kithchen and dining rm. replace single patio door to double french doors. infill door and windows on rear elevation. | $40,000 |
| Nov 29, 2007 | Completed final sign-off Apr 2008 | 39 Frederick St | 1 kitchen: replace cabinets + fixtures. new tile no structural work. 50% of wattage to be fluorescant. bathroom: move sink + toilet, new shower + tile work. replace washer + dryer no structural. lighting to be fluorescant or on occupant sensor.Details
1 kitchen: replace cabinets + fixtures. new tile no structural work. 50% of wattage to be fluorescant. bathroom: move sink + toilet, new shower + tile work. replace washer + dryer no structural. lighting to be fluorescant or on occupant sensor. | $24,000 |
| Oct 18, 2007 | Expired or cancelled expired Dec 2009 | 65 Homestead St | remove current wooden staircase, front wood portch and wood railing. replace with same design, but more wind/fog resistant materials. concrete steps, metal fence and add shead for gargae cans at street level.Details
remove current wooden staircase, front wood portch and wood railing. replace with same design, but more wind/fog resistant materials. concrete steps, metal fence and add shead for gargae cans at street level. | $45,000 |
| Oct 3, 2007 | Completed final sign-off Feb 2008 | 3887 18th St | bathroom work, toilet , bath, shower, sink moved tile workDetails
bathroom work, toilet , bath, shower, sink moved tile work | |
| Jul 18, 2007 | Completed final sign-off Apr 2008 | 1129 Kirkham St | remodel bathroom @ 1st floor. replace all fixtures & finishes. add new full bathroom in existing closet @ 2nd floor.Details
remodel bathroom @ 1st floor. replace all fixtures & finishes. add new full bathroom in existing closet @ 2nd floor. | $20,000 |
| Jul 3, 2007 | Completed final sign-off Nov 2007 | 1190 Sanchez St | kitchen replace cabinets & appliance, paint, bathroom replace fixtures, tile, paint no lighting change.Details
kitchen replace cabinets & appliance, paint, bathroom replace fixtures, tile, paint no lighting change. | $24,000 |
| Oct 3, 2006 | Completed final sign-off Jun 2007 | 65 Homestead St | move kitchen/dining room wall, rearrange major appliances, remove wall 4th floor, add bathroom.short en 2 walls on main floor 3rd floorDetails
move kitchen/dining room wall, rearrange major appliances, remove wall 4th floor, add bathroom.short en 2 walls on main floor 3rd floor | $280,000 |
| Jul 7, 2006 | Completed final sign-off Sep 2006 | 211 Anderson St | foundation strengthening, replace right side footingDetails
foundation strengthening, replace right side footing | $10,000 |
| May 25, 2006 | Completed final sign-off May 2006 | 211 Anderson St | renew of appl #200510195989, 200509122626 for final inspection.Details
renew of appl #200510195989, 200509122626 for final inspection. | |
| Jan 17, 2006 | Completed final sign-off Jun 2006 | 1140 Stanyan St | remodel 2 (e) kitchens with new cabinets, counter top, sink appliances, refinish floors, paint, lighting. no structural work. remodel 2 (e) bathrooms with new toilet, vanity, lighting and tile no structural work.Details
remodel 2 (e) kitchens with new cabinets, counter top, sink appliances, refinish floors, paint, lighting. no structural work. remodel 2 (e) bathrooms with new toilet, vanity, lighting and tile no structural work. | $50,000 |
| Sep 12, 2005 | Expired or cancelled expired May 2006 | 211 Anderson St | remodel kitchen & bathrm. replace exterior doors & windows like kind at same location.Details
remodel kitchen & bathrm. replace exterior doors & windows like kind at same location. | $20,000 |
| Jul 18, 2005 | Completed final sign-off Oct 2005 | 1808 Filbert St | build a conecting wall, laundry closet will also be created in the new hallway.Details
build a conecting wall, laundry closet will also be created in the new hallway. | $25,000 |
| Jun 21, 2005 | Completed final sign-off Sep 2005 | 260 College Av | remodel existing kitchen with new cabinets, appliances, new floorDetails
remodel existing kitchen with new cabinets, appliances, new floor | $18,000 |
| Jan 24, 2005 | Never finaled issued Jan 2005, no final | 1375 35th Av | horzontal addition- kitchen remodel bathrm remodel on 2nd flr; replacement of (e) alum windows w/n wDetails
horzontal addition- kitchen remodel bathrm remodel on 2nd flr; replacement of (e) alum windows w/n w | $40,000 |