Metro Painting
- Based in
- San Francisco
- On San Francisco permits
- Sep 2012 to Aug 2013
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 16, 2013 | Completed final sign-off Mar 2017 | 74 Brady St | replace some dry -rotted roof plywood wall with same type of new 1/2" plywood wall approx. 4'x4' pieces.Details
replace some dry -rotted roof plywood wall with same type of new 1/2" plywood wall approx. 4'x4' pieces. | $2,500 |
| Sep 26, 2012 | Completed final sign-off Oct 2012 | 683 09th Av | tear down back stairs and railing, rebuild exactly as original/new stairs and railing, to comply with nov 201249181, replacing of existing rear stairway with same configuration & construction as existing stairwayDetails
tear down back stairs and railing, rebuild exactly as original/new stairs and railing, to comply with nov 201249181, replacing of existing rear stairway with same configuration & construction as existing stairway | $4,800 |