Metro General Construction
- Based in
- Novato
- On San Francisco permits
- Mar 2015 to Apr 2018
- Last 24 months
- 0 permits filed
12 permits since 2000: 10 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 18, 2018 | Completed final sign-off Apr 2019 | 184 Valley St | revised floor plan to permit app#201603162267 to relocate bathroom and electrical meters. add new study.Details
revised floor plan to permit app#201603162267 to relocate bathroom and electrical meters. add new study. | |
| Apr 6, 2018 | Completed final sign-off Aug 2018 | 186 Valley St | replace (e) concrete slab, including excavation and walk way (partial)Details
replace (e) concrete slab, including excavation and walk way (partial) | $10,000 |
| Mar 12, 2018 | Never finaled issued Mar 2018, no final | 82 Aptos Av | bathroom remodel, sheetrock.Details
bathroom remodel, sheetrock. | $8,000 |
| Jan 4, 2018 | Completed final sign-off Nov 2019 | 3936 26th St | reduce scope of work on foundation, east side - revision to 201505085826Details
reduce scope of work on foundation, east side - revision to 201505085826 | |
| Aug 31, 2017 | Completed final sign-off Nov 2019 | 3936 26th St | facade restoration - revision to pa 2015-0508-5826 to remove asbestos siding and restore wood siding from original design to clear planning enforcement violation 2017009915enf and 201797171 no structural work. no new fenestration, no change in envelope.Details
facade restoration - revision to pa 2015-0508-5826 to remove asbestos siding and restore wood siding from original design to clear planning enforcement violation 2017009915enf and 201797171 no structural work. no new fenestration, no change in envelope. | $100,000 |
| Aug 28, 2017 | Expired or cancelled expired Nov 2018 | 186 Valley St | soft story retrofit per sfebc chapter 4d per engineering creteria 2016 cebc appendix a-4. adu per #201603162267Details
soft story retrofit per sfebc chapter 4d per engineering creteria 2016 cebc appendix a-4. adu per #201603162267 | $40,000 |
| Jul 19, 2017 | Completed final sign-off Feb 2019 | 1961 Filbert St | dry rot repaiur, remove and replace in-kind lumber frame and stucco work on interior courtyardDetails
dry rot repaiur, remove and replace in-kind lumber frame and stucco work on interior courtyard | $20,000 |
| Jun 8, 2017 | Completed final sign-off Aug 2017 | 1250 Taylor St | unit #2 - to comply with nov 201776901, #2 & #3, rot repair, about 25%. replace cabinets, kitchen & bath; gfi installed in kitchen & bath; plumbing new sinks in kitchen & bathDetails
unit #2 - to comply with nov 201776901, #2 & #3, rot repair, about 25%. replace cabinets, kitchen & bath; gfi installed in kitchen & bath; plumbing new sinks in kitchen & bath | $15,000 |
| Apr 17, 2017 | Completed final sign-off May 2017 | 4728 Balboa St | #1 - kitchen & bath remodel - new cabinets & countertops, new plumbing fixtures, paint, tile. no lighting change.Details
#1 - kitchen & bath remodel - new cabinets & countertops, new plumbing fixtures, paint, tile. no lighting change. | $15,000 |
| May 25, 2016 | Completed final sign-off Aug 2018 | 80 07th Av | add 2 dwelling unit (adu) per ordinances 30-15. w/ soft story app#201603293277. new windows at rear. work under separate permits: m/e/p & fire sprinkler. n/a for maher ordinance no. 155-13.Details
add 2 dwelling unit (adu) per ordinances 30-15. w/ soft story app#201603293277. new windows at rear. work under separate permits: m/e/p & fire sprinkler. n/a for maher ordinance no. 155-13. | $60,000 |
| Mar 16, 2016 | Completed final sign-off Apr 2019 | 186 Valley St | create new dwelling unit per ordinance 161-15.Details
create new dwelling unit per ordinance 161-15. | $50,000 |
| Mar 4, 2015 | Completed final sign-off Apr 2015 | 837 Geary St | renovate kitchen-relocate. remodel bathroom. convert (e)kitchen to bedroom.Details
renovate kitchen-relocate. remodel bathroom. convert (e)kitchen to bedroom. | $15,000 |