Method Design-Build, Llc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2017 to Jan 2026
- Last 24 months
- 2 permits filed
4 permits since 2000: 3 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 9, 2026 | Completed final sign-off Jan 2026 | 1239 Shafter Av | to obatin final insepction for work approved under 2017112055597 .all work is completeDetails
to obatin final insepction for work approved under 2017112055597 .all work is complete | |
| Mar 13, 2025 | Completed final sign-off Jan 2026 | 1239 Shafter Av | structural revision 201712055597- to include verification of (e) conditions under dbi reinstated permit 201712055597. verify if lateral load restraints/sheerwalls, diaphragms and life safety requirementsDetails
structural revision 201712055597- to include verification of (e) conditions under dbi reinstated permit 201712055597. verify if lateral load restraints/sheerwalls, diaphragms and life safety requirements | $12,000 |
| Mar 27, 2024 | Completed final sign-off Nov 2024 | 1237 Shafter Av | replace rear exterior door, threshold, install storm door, replace 50 sqft. h/w flooring, replace siding, trim, exterior finishes on east/west ext, flash all (e) windows & door, replace elec meter enclosure + add compliant disconnect, repair damaged branch circuits @ main a subpanel no front facingDetails
replace rear exterior door, threshold, install storm door, replace 50 sqft. h/w flooring, replace siding, trim, exterior finishes on east/west ext, flash all (e) windows & door, replace elec meter enclosure + add compliant disconnect, repair damaged branch circuits @ main a subpanel no front facing | $180,000 |
| Dec 5, 2017 | Never finaled issued Mar 2022, no final | 1239 Shafter Av | unit legalization per ordinance 43-14, two bedrooms, 1 bath and 1 kitchen.Details
unit legalization per ordinance 43-14, two bedrooms, 1 bath and 1 kitchen. | $320,000 |