Method Design-Build, Llc

Contractor license
1116822
State license record
Based in
San Francisco
On San Francisco permits
Dec 2017 to Jan 2026
Last 24 months
2 permits filed

4 permits since 2000: 3 completed, 1 never finaled.

Of the 1 never-finaled permit, 1 is 3 to 5 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Most recent permits

AllKitchen remodel 1Bathroom remodel 1
FiledOutcomeAddressWork described on the permitDeclared cost
Jan 9, 2026Completed
final sign-off Jan 2026
1239 Shafter Avto obatin final insepction for work approved under 2017112055597 .all work is complete
Details
Permit
202601093573
Status
complete
Filed
Jan 9, 2026
Permit issued
Jan 9, 2026
Final sign-off
Jan 12, 2026
Address
1239 Shafter Av

to obatin final insepction for work approved under 2017112055597 .all work is complete

Open the permit page

Mar 13, 2025Completed
final sign-off Jan 2026
1239 Shafter Avstructural revision 201712055597- to include verification of (e) conditions under dbi reinstated permit 201712055597. verify if lateral load restraints/sheerwalls, diaphragms and life safety requirements
Details
Permit
202503132151
Status
complete
Filed
Mar 13, 2025
Permit issued
Mar 13, 2025
Final sign-off
Jan 12, 2026
Declared cost
$12,000
Address
1239 Shafter Av

structural revision 201712055597- to include verification of (e) conditions under dbi reinstated permit 201712055597. verify if lateral load restraints/sheerwalls, diaphragms and life safety requirements

Open the permit page

$12,000
Mar 27, 2024Completed
final sign-off Nov 2024
1237 Shafter Avreplace rear exterior door, threshold, install storm door, replace 50 sqft. h/w flooring, replace siding, trim, exterior finishes on east/west ext, flash all (e) windows & door, replace elec meter enclosure + add compliant disconnect, repair damaged branch circuits @ main a subpanel no front facing
Details
Permit
202403278749
Status
complete
Filed
Mar 27, 2024
Permit issued
Mar 28, 2024
Final sign-off
Nov 4, 2024
Declared cost
$180,000
Address
1237 Shafter Av

replace rear exterior door, threshold, install storm door, replace 50 sqft. h/w flooring, replace siding, trim, exterior finishes on east/west ext, flash all (e) windows & door, replace elec meter enclosure + add compliant disconnect, repair damaged branch circuits @ main a subpanel no front facing

Open the permit page

$180,000
Dec 5, 2017Never finaled
issued Mar 2022, no final
1239 Shafter Avunit legalization per ordinance 43-14, two bedrooms, 1 bath and 1 kitchen.
Details
Permit
201712055597
Status
reinstated
Filed
Dec 5, 2017
Permit issued
Mar 9, 2022
Final sign-off
Feb 8, 2023
Declared cost
$320,000
Address
1239 Shafter Av

unit legalization per ordinance 43-14, two bedrooms, 1 bath and 1 kitchen.

Open the permit page

$320,000