Meir Construction
- Based in
- Valley Village
- On San Francisco permits
- Aug 2021 to Mar 2022
- Last 24 months
- 0 permits filed
3 permits since 2000: 2 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 23, 2022 | Completed final sign-off Jul 2022 | 225 Bay St | unit #101: like for like remodel upgrade vertical plumbing], demo and install new show tile. install vanity and fan. upgrade panel box. master bathroom. no structural changes.Details
unit #101: like for like remodel upgrade vertical plumbing], demo and install new show tile. install vanity and fan. upgrade panel box. master bathroom. no structural changes. | $9,700 |
| Dec 10, 2021 | Expired or cancelled cancelled Jan 2026 | 748 Clipper St | renovation bathroom 2nd floor replace tub to shower, toilet, remain accessories and finished to be replaced in kind consideration include architectural attributes of the interior of the structure in conjunction with code and zoning requirementDetails
renovation bathroom 2nd floor replace tub to shower, toilet, remain accessories and finished to be replaced in kind consideration include architectural attributes of the interior of the structure in conjunction with code and zoning requirement | $25,000 |
| Aug 11, 2021 | Completed final sign-off Feb 2022 | 95 Duboce Av | two bathroom remodel. adjust shower head height, install new ceiling fan if needed, apply waterproof on walls, install tub, tile, bathroom floors and walls. exhaust per cmc 502.21 lights per cenc 150.0 (k). non structuralDetails
two bathroom remodel. adjust shower head height, install new ceiling fan if needed, apply waterproof on walls, install tub, tile, bathroom floors and walls. exhaust per cmc 502.21 lights per cenc 150.0 (k). non structural | $30,000 |