Mec Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2006 to Dec 2016
- Last 24 months
- 0 permits filed
26 permits since 2000: 17 completed, 4 never finaled, 5 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 15, 2016 | Never finaled issued Dec 2016, no final | 217 10th Av | dry rot repair on front of building repair stucco in-kind.Details
dry rot repair on front of building repair stucco in-kind. | $1,500 |
| Nov 17, 2015 | Expired or cancelled cancelled Jan 2026 | 217 10th Av | revision to lower floor framing, existing permit 201502269451Details
revision to lower floor framing, existing permit 201502269451 | $8,500 |
| Aug 10, 2015 | Completed final sign-off Feb 2016 | 68 Mccoppin St | kitchen cabinet & counter replacement. no walls to be moved. tub replacement & tile work at bathroom. no structural work. re-paint unit.Details
kitchen cabinet & counter replacement. no walls to be moved. tub replacement & tile work at bathroom. no structural work. re-paint unit. | $15,000 |
| May 21, 2015 | Completed final sign-off Apr 2016 | 6000 03rd St | conforming extg bathrooms to accessibility requirements. conforming extg parking to accessibility requirement. install 3 portable modular office units. n/a for maher.Details
conforming extg bathrooms to accessibility requirements. conforming extg parking to accessibility requirement. install 3 portable modular office units. n/a for maher. | $15,000 |
| Feb 26, 2015 | Never finaled issued Aug 2015, no final | 217 10th Av | new roof deck, interior alterations, new deck in rear yard, infill lightwell @ 1st floor only & seismic upgrade. re-stucco facade and replace windows with wood or aluminum-clad sash.Details
new roof deck, interior alterations, new deck in rear yard, infill lightwell @ 1st floor only & seismic upgrade. re-stucco facade and replace windows with wood or aluminum-clad sash. | $534,100 |
| Jun 30, 2014 | Never finaled issued Jun 2014, no final | 217 10th Av | remodeling of 3 kitchens & 3 bathrooms. no alteration of wall, window & door.Details
remodeling of 3 kitchens & 3 bathrooms. no alteration of wall, window & door. | $30,000 |
| Feb 2, 2012 | Completed final sign-off Jun 2013 | 2001 Union St | alterations to interior of existing building. existing storefront to be reconfigured. project area 1100 sq ft.Details
alterations to interior of existing building. existing storefront to be reconfigured. project area 1100 sq ft. | $25,000 |
| Nov 23, 2011 | Completed final sign-off Mar 2012 | 663 10th Av | kitchen and bathroom remodeling; replace cabinets and new floors (tile) unit #665Details
kitchen and bathroom remodeling; replace cabinets and new floors (tile) unit #665 | $5,000 |
| Jan 5, 2011 | Completed final sign-off Jan 2011 | 1221 Jones St | ph a3: install washer and dryer stackable unitDetails
ph a3: install washer and dryer stackable unit | $2,500 |
| Mar 10, 2010 | Completed final sign-off Apr 2010 | 2238 Hyde St | apt#4, 4th fl. patch existing plaster ceiling with new plaster metal lath due to water damageDetails
apt#4, 4th fl. patch existing plaster ceiling with new plaster metal lath due to water damage | $1,500 |
| Aug 27, 2007 | Completed final sign-off Nov 2007 | 808 Leavenworth St | in revision to app #200708078997. unit #405 address correctionDetails
in revision to app #200708078997. unit #405 address correction | |
| Aug 27, 2007 | Completed final sign-off Nov 2007 | 808 Leavenworth St | address correction to 200705295575 to unit number 601Details
address correction to 200705295575 to unit number 601 | |
| Aug 27, 2007 | Completed final sign-off Nov 2007 | 808 Leavenworth St | revision to 200707177032 units numbers 205 and 603-address correctionDetails
revision to 200707177032 units numbers 205 and 603-address correction | |
| Aug 23, 2007 | Never finaled filed Aug 2007, never issued | 1221 Jones St | open walls so inspectors can verify electrical. corrections to nov# 200703142 & 200703142 at 11th and 14th floors (penthouse). patch and paintDetails
open walls so inspectors can verify electrical. corrections to nov# 200703142 & 200703142 at 11th and 14th floors (penthouse). patch and paint | $12,500 |
| Aug 8, 2007 | Completed final sign-off Oct 2007 | 78 Buchanan St | nov 200703144: unit106, kitchen and bathr remodel. upgrade electrical to code. upgrade appliance, patch and paint walls and ceilings.unit 204: same scope of work 402:new vinyl window replacement in bathroom. 605: kitchen remodel,new tile and appliances,patch and paint walls and ceilingsDetails
nov 200703144: unit106, kitchen and bathr remodel. upgrade electrical to code. upgrade appliance, patch and paint walls and ceilings.unit 204: same scope of work 402:new vinyl window replacement in bathroom. 605: kitchen remodel,new tile and appliances,patch and paint walls and ceilings | $40,750 |
| Aug 7, 2007 | Expired or cancelled expired Jan 2011 | 808 Leavenworth St | remodel unit 601. demolish kitchen and bath, new appliances and fixtures, upgdate electrical to code. patch and paint ceilings and walls, new tile floor coviering in bath and kitchen. new lighting. flourescent/occupance sensorDetails
remodel unit 601. demolish kitchen and bath, new appliances and fixtures, upgdate electrical to code. patch and paint ceilings and walls, new tile floor coviering in bath and kitchen. new lighting. flourescent/occupance sensor | $16,000 |
| Jul 27, 2007 | Expired or cancelled expired Jan 2009 | 78 Buchanan St | nov# 200710117-404 kitchen and bathroom remodel. upgrade electrical to code, upgrade appliances and fixtures. patch and paint walls & ceilings, new tile and bathroom fixtures #302-kitchen remodel. upgrade electrical to code, new fixtures and appliances. new tile & patch, paint wallsDetails
nov# 200710117-404 kitchen and bathroom remodel. upgrade electrical to code, upgrade appliances and fixtures. patch and paint walls & ceilings, new tile and bathroom fixtures #302-kitchen remodel. upgrade electrical to code, new fixtures and appliances. new tile & patch, paint walls | $30,000 |
| Jul 17, 2007 | Completed final sign-off Nov 2007 | 808 Leavenworth St | remodel of units 205 & 601 - update electrical to code. move drain and gas line. upgrade appliances and fixtures. patch and dpaint ceilings and walls.Details
remodel of units 205 & 601 - update electrical to code. move drain and gas line. upgrade appliances and fixtures. patch and dpaint ceilings and walls. | $28,000 |
| Jul 3, 2007 | Completed final sign-off Sep 2007 | 210 Church St | (work on unit#16 only).remodel of kitchen and bathroom, patch and paint walls and ceilings. upgrade of appliances and fixtures. provide fluorescent light or o.s in bath. min 50% of kitchen light watts be fluorescent.Details
(work on unit#16 only).remodel of kitchen and bathroom, patch and paint walls and ceilings. upgrade of appliances and fixtures. provide fluorescent light or o.s in bath. min 50% of kitchen light watts be fluorescent. | $16,000 |
| Jun 29, 2007 | Completed final sign-off Nov 2007 | 808 Leavenworth St | remodel of kitchen bathroom patch and paint ceilings and walls upgrade fixtures and appliances (no change to partitions or windowsDetails
remodel of kitchen bathroom patch and paint ceilings and walls upgrade fixtures and appliances (no change to partitions or windows | $14,000 |
| Jun 21, 2007 | Completed final sign-off Sep 2007 | 808 Leavenworth St | work on#202 & #406. remodel 1 kitchen and 1 bathrooms. patch and paint walls and ceilings for two units.Details
work on#202 & #406. remodel 1 kitchen and 1 bathrooms. patch and paint walls and ceilings for two units. | $14,000 |
| Jun 14, 2007 | Completed final sign-off Sep 2007 | 1320 Lombard St | demolition of (e) kitchen cabinets, demolition of bathroom tile and flooring. install new kitchen cabinets, bathroom tile and flooring. no window and no door work on this permit.Details
demolition of (e) kitchen cabinets, demolition of bathroom tile and flooring. install new kitchen cabinets, bathroom tile and flooring. no window and no door work on this permit. | $14,000 |
| Mar 6, 2007 | Expired or cancelled expired Jan 2011 | 808 Leavenworth St | remodel 1 kitchen & 1 bathroom patch & paint walls & ceiling under unit#203,#206,#302,#303,#305,#402,#403Details
remodel 1 kitchen & 1 bathroom patch & paint walls & ceiling under unit#203,#206,#302,#303,#305,#402,#403 | $95,000 |
| Mar 6, 2007 | Expired or cancelled expired Mar 2008 | 248 Taylor St | remodel 1 kitchen & 1 bathroom patch & paint entire apt.#402Details
remodel 1 kitchen & 1 bathroom patch & paint entire apt.#402 | $14,000 |
| Dec 22, 2006 | Completed final sign-off May 2007 | 326 29th St | to correct all items of physical inspection #3r-4617, dated on 08/07/06. see attached.Details
to correct all items of physical inspection #3r-4617, dated on 08/07/06. see attached. | $10,000 |
| Dec 22, 2006 | Completed final sign-off Apr 2007 | 2050 Powell St | work @ unit# 1 & # 5. replace kitchen cabinets, complete apartment paint job, re-wire entire kitchen to bring electrical up to code. install tile in kitchen & bathroom & repair all walls & ceiling. flourescent lighting.Details
work @ unit# 1 & # 5. replace kitchen cabinets, complete apartment paint job, re-wire entire kitchen to bring electrical up to code. install tile in kitchen & bathroom & repair all walls & ceiling. flourescent lighting. | $25,000 |