Mcginley Building
- Based in
- Berkeley
- On San Francisco permits
- Jan 2005 to Mar 2012
- Last 24 months
- 0 permits filed
15 permits since 2000: 12 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 8, 2012 | Expired or cancelled expired Nov 2022 | 254 Precita Av | seismic retrofit. partial replace exterior footing/ replace mid footing. concrete floor slab on grade. add shear walls on upper floor & lower floor.Details
seismic retrofit. partial replace exterior footing/ replace mid footing. concrete floor slab on grade. add shear walls on upper floor & lower floor. | $68,000 |
| Jun 16, 2011 | Completed final sign-off Oct 2012 | 3914 24th St | revision to 201006164603: revision to bathroomDetails
revision to 201006164603: revision to bathroom | |
| Oct 15, 2010 | Completed final sign-off Jan 2011 | 3914 24th St | replace rotted redwood walkway to lower apartment with new redwood, exisitng redwood panels are unattached, supported on sleepers.Details
replace rotted redwood walkway to lower apartment with new redwood, exisitng redwood panels are unattached, supported on sleepers. | $3,400 |
| Jun 16, 2010 | Completed final sign-off Oct 2012 | 3914 24th St | replace (e) brick foundation with concrete. install retaining wall to (e) stair @ music store/first flr.Details
replace (e) brick foundation with concrete. install retaining wall to (e) stair @ music store/first flr. | $54,000 |
| Aug 31, 2009 | Completed final sign-off Sep 2009 | 682 Douglass St | change bathroom to storage area to comply with nov 200993860 on basement. revision to pa# 2008.03.13.6997.Details
change bathroom to storage area to comply with nov 200993860 on basement. revision to pa# 2008.03.13.6997. | $350 |
| Apr 16, 2008 | Completed final sign-off Jan 2009 | 3335 Clement St | remove/replace siding to reinstate rotted wall framing at three locations. repair front wood (3) steps at entrance comply with nov#200796456: replace corner studs 2 locations. replace mud sill -1 location.Details
remove/replace siding to reinstate rotted wall framing at three locations. repair front wood (3) steps at entrance comply with nov#200796456: replace corner studs 2 locations. replace mud sill -1 location. | $12,000 |
| Mar 13, 2008 | Completed final sign-off Sep 2009 | 682 Douglass St | extension at rear to create single story structure to extend exist. bedroom, remodel exist bathroom, remodel exist bedroom,add toilet/bowl closet. add three skylights. new extension will enclose new stair to existing ground floor.Details
extension at rear to create single story structure to extend exist. bedroom, remodel exist bathroom, remodel exist bedroom,add toilet/bowl closet. add three skylights. new extension will enclose new stair to existing ground floor. | $95,000 |
| Sep 5, 2007 | Never finaled issued Sep 2007, no final | 3870 25th St | add skylight 2'x 2' and less than 1'-0" in height for (e)bathroom on 2nd fl/ top floor.Details
add skylight 2'x 2' and less than 1'-0" in height for (e)bathroom on 2nd fl/ top floor. | $850 |
| Jul 30, 2007 | Completed final sign-off Nov 2007 | 3870 25th St | install washer /dryer, install shower / basin , build new bath , rock bed room.Details
install washer /dryer, install shower / basin , build new bath , rock bed room. | $41,000 |
| Jan 30, 2007 | Completed final sign-off Dec 2007 | 1872 Church St | remodel kitchen/bath/wash room. alteration to floor plan, install door from bedroom to hallway, remove rear bedroom to lightwell. use 50% flourescent lightsDetails
remodel kitchen/bath/wash room. alteration to floor plan, install door from bedroom to hallway, remove rear bedroom to lightwell. use 50% flourescent lights | $35,000 |
| Dec 7, 2006 | Completed final sign-off Jan 2007 | 1125 Dolores St | repair rear stairs-comply with nov# 200680140 dated 10/26/06. back stairs repair. repair work is less than 50% of existing.Details
repair rear stairs-comply with nov# 200680140 dated 10/26/06. back stairs repair. repair work is less than 50% of existing. | $1,200 |
| Jun 13, 2006 | Completed final sign-off Jul 2006 | 24 Sanchez St | build new basement shear wall.Details
build new basement shear wall. | $2,000 |
| Feb 14, 2006 | Never finaled issued Feb 2006, no final | 1125 Dolores St | new shear wall at basementDetails
new shear wall at basement | $2,000 |
| Feb 14, 2006 | Completed final sign-off May 2006 | 1119 Dolores St | replace foundation basement shear wall.Details
replace foundation basement shear wall. | $17,500 |
| Jan 31, 2005 | Completed final sign-off Jun 2005 | 1414 Alabama St | remove/replace rotted wood at rear wall.Details
remove/replace rotted wood at rear wall. | $2,500 |