Mccoppin Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2005 to Apr 2007
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 16, 2007 | Completed final sign-off Nov 2007 | 224 Mississippi St | ammendments to permit application nuber, 200511147982 changes consist of: reflect changes to existing conditions discovered during construction, construction details for awning, changes inn fenestication, grade beam.Details
ammendments to permit application nuber, 200511147982 changes consist of: reflect changes to existing conditions discovered during construction, construction details for awning, changes inn fenestication, grade beam. | |
| Nov 14, 2005 | Completed final sign-off Nov 2007 | 224 Mississippi St | interior remodel &horizontal addition to (e) 2nd story residence.interior remodel 1st floor.(light industrial use).change facade & new planter boxes on sidewalk per encroachement permit.Details
interior remodel &horizontal addition to (e) 2nd story residence.interior remodel 1st floor.(light industrial use).change facade & new planter boxes on sidewalk per encroachement permit. | $150,000 |