Mc Dermott Construction
- Based in
- Berkeley
- On San Francisco permits
- Nov 2007 to Nov 2015
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 16, 2015 | Completed final sign-off Apr 2016 | 301 Valdez Av | repair damaged (e) stucco on wall to right of front door and wall at garage. repair damaged window trim and replicate design surrounding garage door. no structural changes.Details
repair damaged (e) stucco on wall to right of front door and wall at garage. repair damaged window trim and replicate design surrounding garage door. no structural changes. | $20,000 |
| Nov 21, 2007 | Completed final sign-off Dec 2007 | 95 Martha Av | repair existing balcony, joists, replace decking, new handrail.Details
repair existing balcony, joists, replace decking, new handrail. | $12,000 |