Max Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2021 to Feb 2026
- Last 24 months
- 3 permits filed
7 permits since 2000: 6 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 19, 2026 | In progress filed Feb 2026, not yet issued | 3285 Cesar Chavez St | interior addition on ground floor. add 2 bedrooms, 2 bathrooms, and family room.Details
interior addition on ground floor. add 2 bedrooms, 2 bathrooms, and family room. | $50,000 |
| Jun 4, 2025 | Completed final sign-off Dec 2025 | 3285 Cesar Chavez St | revision to pa #2025-0114-8269 new location for stove, refrigerator and showerDetails
revision to pa #2025-0114-8269 new location for stove, refrigerator and shower | |
| Jan 14, 2025 | Completed final sign-off Dec 2025 | 3285 Cesar Chavez St | interior remodeling at 2nd floor sfp: add new master bedroom. remodel extg bathroom, kitchen, dining room. add roof cover over existing 6 foot rear deck.Details
interior remodeling at 2nd floor sfp: add new master bedroom. remodel extg bathroom, kitchen, dining room. add roof cover over existing 6 foot rear deck. | $20,000 |
| Oct 27, 2023 | Completed final sign-off Feb 2024 | 1554 Alemany Bl | split 2nd flr (e) bathroom into two back to back (n) bathrooms. remove existing bathroom skylight to (n) skylight in each of the two (n) bathrooms. habitable square footage increased from 1690 sf to 1694sfDetails
split 2nd flr (e) bathroom into two back to back (n) bathrooms. remove existing bathroom skylight to (n) skylight in each of the two (n) bathrooms. habitable square footage increased from 1690 sf to 1694sf | $15,000 |
| Jul 17, 2023 | Completed final sign-off Jan 2024 | 1554 Alemany Bl | (e) kitchen remodel like to like, replace new cabinets, reuse stove, refirgerator (no walls removed). upgrade the service to a 200 amp service with a 24 circuit load - relocate sink.Details
(e) kitchen remodel like to like, replace new cabinets, reuse stove, refirgerator (no walls removed). upgrade the service to a 200 amp service with a 24 circuit load - relocate sink. | $15,000 |
| Oct 26, 2021 | Completed final sign-off Jan 2024 | 3287 Cesar Chavez St | comply w/ nov# 2021799936. grd flr only- obtain occupancy use permit for dry clean drop off and pick up service with no on site processing equip. install (n) accessible business entrance, provide 2 hour ceiling separation between residential & commercial...Details
comply w/ nov# 2021799936. grd flr only- obtain occupancy use permit for dry clean drop off and pick up service with no on site processing equip. install (n) accessible business entrance, provide 2 hour ceiling separation between residential & commercial... | $15,000 |
| Oct 4, 2021 | Completed final sign-off Dec 2024 | 3285 Cesar Chavez St | comply with nov# 202053251 & 202021012 & planning violation #2021-007501enf. backfill excavated soil & compact in garage. remove temporary shoring. new 4x6 to reinforce deck jts. close communicating opening between 3285 & 3287. rebuild rear wood stairs to code at deck.Details
comply with nov# 202053251 & 202021012 & planning violation #2021-007501enf. backfill excavated soil & compact in garage. remove temporary shoring. new 4x6 to reinforce deck jts. close communicating opening between 3285 & 3287. rebuild rear wood stairs to code at deck. | $15,000 |