Matthews Construction
- Based in
- Browns Valley
- On San Francisco permits
- Feb 2016 to Dec 2021
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 never finaled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 13, 2021 | Never finaled issued Dec 2021, no final | 241 Mississippi St | rev to pa201602038763 to include the following: alter e 1/2/3fl layout due to fire damage. rebuild (e) duplex as prior to fire with some mods. repair the building due to fire damagne and repair foundation.Details
rev to pa201602038763 to include the following: alter e 1/2/3fl layout due to fire damage. rebuild (e) duplex as prior to fire with some mods. repair the building due to fire damagne and repair foundation. | $27,000 |
| Feb 3, 2016 | Never finaled issued Feb 2018, no final | 241 Mississippi St | to comply with nov: 201414942 & 201576552: remove and replace roof, 3rd floor joist, walls as shown, rebuild same. seismic retrofit. remodel (e) structure interior. all new mep. maher naDetails
to comply with nov: 201414942 & 201576552: remove and replace roof, 3rd floor joist, walls as shown, rebuild same. seismic retrofit. remodel (e) structure interior. all new mep. maher na | $500,000 |