Matthew Callicotte And Company
- Based in
- San Bruno
- On San Francisco permits
- Apr 2008 to Oct 2009
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 1, 2009 | Completed final sign-off Oct 2009 | 3962 18th St | repairs made due to n.o.v.#200920800 & 200920792 - replace missing balustrades to lower balcony at rear of bldg. remove entire exterior wood utility ladder attached to bldg.Details
repairs made due to n.o.v.#200920800 & 200920792 - replace missing balustrades to lower balcony at rear of bldg. remove entire exterior wood utility ladder attached to bldg. | $1,000 |
| Apr 28, 2009 | Completed final sign-off Sep 2009 | 115 Dalewood Wy | demo (e) hall bath down to studs. all (e) framing to remain. install 3 new can lihgts & 1 new exhaust fan. all plumbing fixture locations remain. install 1 new shower / tub filler valve. sheetrock walls & ceiling. tile floor & tub surround. bathroom remodel.Details
demo (e) hall bath down to studs. all (e) framing to remain. install 3 new can lihgts & 1 new exhaust fan. all plumbing fixture locations remain. install 1 new shower / tub filler valve. sheetrock walls & ceiling. tile floor & tub surround. bathroom remodel. | $12,000 |
| Apr 17, 2008 | Completed final sign-off Jun 2008 | 395 Valley St | demolish (e) bathroom down to rough framing. add 4 new light fxtures. change out old plumbing fixtures with new. new tile throughout. no structural work.Details
demolish (e) bathroom down to rough framing. add 4 new light fxtures. change out old plumbing fixtures with new. new tile throughout. no structural work. | $10,000 |