Matt Sanford Homes
- Based in
- San Francisco
- On San Francisco permits
- Feb 2012 to May 2019
- Last 24 months
- 0 permits filed
35 permits since 2000: 32 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 28, 2019 | Completed final sign-off Sep 2020 | 930 Potrero Av | revision to 201803214196 new 4th storey roof deck including new roof hatch and internal sprinal stair from 3rd flr. remove (e) side passage on 1st flr and convert to living space. roof hatch <12" from top of (e) roofDetails
revision to 201803214196 new 4th storey roof deck including new roof hatch and internal sprinal stair from 3rd flr. remove (e) side passage on 1st flr and convert to living space. roof hatch <12" from top of (e) roof | $50,000 |
| May 20, 2019 | Completed final sign-off Aug 2019 | 139 Tingley St | bath & kitchen remodel.Details
bath & kitchen remodel. | $52,000 |
| Mar 21, 2018 | Completed final sign-off Sep 2020 | 930 Potrero Av | remodel of the lower unit with 720 sq ft addition of living space at the first floor level connected via new internal stairs. no expansion of the building envelope. maher na; relocate kitchen to 1/f, add bathroom to 2/f, relocate washer/dryerDetails
remodel of the lower unit with 720 sq ft addition of living space at the first floor level connected via new internal stairs. no expansion of the building envelope. maher na; relocate kitchen to 1/f, add bathroom to 2/f, relocate washer/dryer | $200,000 |
| Dec 8, 2017 | Completed final sign-off Feb 2018 | 54 San Jacinto Wy | remove rotted siding on side of house and replace in kind with wood cladding in width & proportions.Details
remove rotted siding on side of house and replace in kind with wood cladding in width & proportions. | $15,000 |
| Sep 15, 2017 | Completed final sign-off Feb 2019 | 221 Cayuga Av | developing ground floor accesory rooms adding 1 bath and family rm in residential bldg. adding 2nd floor elevated deck to rear of bldg. residing and replacing (e) rear windows at back elevation. adding (1) bath & family rm to ground flr.Details
developing ground floor accesory rooms adding 1 bath and family rm in residential bldg. adding 2nd floor elevated deck to rear of bldg. residing and replacing (e) rear windows at back elevation. adding (1) bath & family rm to ground flr. | $50,000 |
| Aug 1, 2017 | Completed final sign-off Sep 2017 | 930 Potrero Av | to comply with physical report cc-8158 item 2-6 repair handrail & stair stringer, remove bed in closetDetails
to comply with physical report cc-8158 item 2-6 repair handrail & stair stringer, remove bed in closet | $3,000 |
| Mar 31, 2017 | Completed final sign-off Feb 2019 | 20 Crestline Dr | to complete work and obtain inspection for work approved under pa# 200904035551 and 201601298414.Details
to complete work and obtain inspection for work approved under pa# 200904035551 and 201601298414. | $87,250 |
| Feb 3, 2017 | Completed final sign-off Jan 2018 | 590 30th Av | remodel of lower floor to add a studio by converting 342 sq.ft. of garage to living space. remodel back wall for new windows & doors, add a new deck less than 30" ht. above grade.Details
remodel of lower floor to add a studio by converting 342 sq.ft. of garage to living space. remodel back wall for new windows & doors, add a new deck less than 30" ht. above grade. | $70,000 |
| Sep 15, 2016 | Never finaled issued Sep 2016, no final | 1640 Grove St | change guard rail at non-property walls (ref. 201607223117)Details
change guard rail at non-property walls (ref. 201607223117) | $8,000 |
| Aug 9, 2016 | Completed final sign-off Feb 2017 | 537 Gennessee St | 2nd flr: relocate opening between kitchen & living room. install (n) fireplace insert, remodel kitchen & bathroom, reconfigure closet & install new exterior door & window, install new exterior stairs to rear yardDetails
2nd flr: relocate opening between kitchen & living room. install (n) fireplace insert, remodel kitchen & bathroom, reconfigure closet & install new exterior door & window, install new exterior stairs to rear yard | $42,000 |
| Jul 22, 2016 | Completed final sign-off Mar 2017 | 1640 Grove St | fix dry rot at exterior/rear, remove & replace in-kind.Details
fix dry rot at exterior/rear, remove & replace in-kind. | $20,000 |
| May 10, 2016 | Completed final sign-off Jul 2016 | 3 Mercato Ct | emergency repair of an exisitng two story deck @ rear less than 50%.Details
emergency repair of an exisitng two story deck @ rear less than 50%. | $1,500 |
| Feb 2, 2016 | Completed final sign-off Feb 2016 | 40 Lurline St | to obtain final inspection for work approved under pa# 201112291442. all work is complete.Details
to obtain final inspection for work approved under pa# 201112291442. all work is complete. | |
| Jan 29, 2016 | Never finaled issued Jan 2016, no final | 20 Crestline Dr | unit #12: to complete work and obtain final inspection for work approved under bpa 200904035551Details
unit #12: to complete work and obtain final inspection for work approved under bpa 200904035551 | $87,250 |
| Jan 29, 2016 | Never finaled issued Jan 2016, no final | 20 Crestline Dr | unit #12: to obtain final inspection for work approved under pa 200911090783; all work is complete.Details
unit #12: to obtain final inspection for work approved under pa 200911090783; all work is complete. | |
| Nov 30, 2015 | Completed final sign-off Jan 2016 | 268 Lexington St | remove bathtub and install shower. isntall new lights and fan. paint and new tile.Details
remove bathtub and install shower. isntall new lights and fan. paint and new tile. | $15,000 |
| Nov 17, 2015 | Completed final sign-off Feb 2018 | 26 Stanford Heights Av | remove e dilapidated wood deck structure in rear yard. replace with new in kind with upgraded structureDetails
remove e dilapidated wood deck structure in rear yard. replace with new in kind with upgraded structure | $20,000 |
| Sep 8, 2015 | Completed final sign-off Oct 2015 | 1953 Hayes St | remove & replace bath tub and vanity sink in 1/2 bathroom no walls moved, removed added or infilled, all existing layouts to remain unchanged.Details
remove & replace bath tub and vanity sink in 1/2 bathroom no walls moved, removed added or infilled, all existing layouts to remain unchanged. | $10,000 |
| Sep 1, 2015 | Completed final sign-off Mar 2016 | 40 Lurline St | revision to 2014 0422 6946 - reconfigure balcony. relocate windows @ side & rear yard.Details
revision to 2014 0422 6946 - reconfigure balcony. relocate windows @ side & rear yard. | |
| Jul 9, 2015 | Completed final sign-off Sep 2015 | 1949 Hayes St | 1/2 bath remodel - remove and repalce bath tub & tile, replace sink vanity. no walls moved, removed, added or installed. all fixture layouts to remain unchanged.Details
1/2 bath remodel - remove and repalce bath tub & tile, replace sink vanity. no walls moved, removed, added or installed. all fixture layouts to remain unchanged. | $13,000 |
| Feb 17, 2015 | Completed final sign-off Jul 2015 | 1951 Hayes St | half bathroom remodel. remove and replace bathtub and tile surround onlyDetails
half bathroom remodel. remove and replace bathtub and tile surround only | $15,000 |
| Nov 12, 2014 | Completed final sign-off Jul 2015 | 1949 Hayes St | remove and replace e balcony with 3 largerDetails
remove and replace e balcony with 3 larger | $60,000 |
| Sep 22, 2014 | Completed final sign-off Mar 2016 | 40 Lurline St | 2 story infill @ southeast corner of house.Details
2 story infill @ southeast corner of house. | $22,000 |
| Jun 10, 2014 | Completed final sign-off Nov 2014 | 188 Alpine Tr | in kind - remodel kitchen and bath at 1st floor and sand and finish floors. remove and replace furnace at basementDetails
in kind - remodel kitchen and bath at 1st floor and sand and finish floors. remove and replace furnace at basement | $60,000 |
| Jun 10, 2014 | Completed final sign-off Nov 2014 | 188 Alpine Tr | remove and replace 3 windows in kind at middle floor front within existing opennings. marvin ultimate casement and fixed with sdl upper portions to match top floor pattern. u-factor 0.40 maxDetails
remove and replace 3 windows in kind at middle floor front within existing opennings. marvin ultimate casement and fixed with sdl upper portions to match top floor pattern. u-factor 0.40 max | $3,000 |
| May 6, 2014 | Completed final sign-off Oct 2014 | 537 Gennessee St | 1st floor:convert storage area @ back of garage to bedroom, bath, laundry. 2nd floor: remove door and jambs at stairs to lower level.Details
1st floor:convert storage area @ back of garage to bedroom, bath, laundry. 2nd floor: remove door and jambs at stairs to lower level. | $48,000 |
| Feb 12, 2014 | Completed final sign-off Jun 2014 | 1210 Alabama St | to comply with physical inspection report "7314"Details
to comply with physical inspection report "7314" | $5,000 |
| Nov 18, 2013 | Completed final sign-off Dec 2013 | 1949 Hayes St | to comply with physical inspection report cc-7279Details
to comply with physical inspection report cc-7279 | $2,000 |
| Nov 7, 2013 | Completed final sign-off Nov 2013 | 1949 Hayes St | to obtain final inspection for work approved under pa #2005.0629.6145. all work is complete.Details
to obtain final inspection for work approved under pa #2005.0629.6145. all work is complete. | |
| Nov 7, 2013 | Completed final sign-off Nov 2013 | 1949 Hayes St | revision to appl #2005.0629.6415 - balcony remodel @ rearDetails
revision to appl #2005.0629.6415 - balcony remodel @ rear | |
| Jul 22, 2013 | Completed final sign-off Oct 2013 | 328 Brazil Av | unit in unit 328: kitchen remodel on the ground fl. remove non bearing walls between kitchen and living roomDetails
unit in unit 328: kitchen remodel on the ground fl. remove non bearing walls between kitchen and living room | $22,000 |
| Jan 22, 2013 | Completed final sign-off May 2013 | 465 Laidley St | reconfigure 2nd fl master bath and closet to new master bath. replace 2nd fl north (front) evelvation double hung, 3x5 windows with 2 3x5 casetment windows and 1 6x5 sliderDetails
reconfigure 2nd fl master bath and closet to new master bath. replace 2nd fl north (front) evelvation double hung, 3x5 windows with 2 3x5 casetment windows and 1 6x5 slider | $31,000 |
| Jul 18, 2012 | Completed final sign-off Dec 2012 | 2234 47th Av | conversion of part of the ground floor into a bedroom and bathDetails
conversion of part of the ground floor into a bedroom and bath | $50,000 |
| Apr 11, 2012 | Completed final sign-off May 2012 | 1195 Sanchez St | change dedbolt locks to thumb levers. meet inspector for tic conversion to comply with physical inspection report # cc-7068Details
change dedbolt locks to thumb levers. meet inspector for tic conversion to comply with physical inspection report # cc-7068 | $300 |
| Feb 8, 2012 | Completed final sign-off Mar 2012 | 2539 30th Av | one bath remodel, bath vanity removal and replace in kind, move vanity lights, move plumbing for sink, add insulation and bath vent farnDetails
one bath remodel, bath vanity removal and replace in kind, move vanity lights, move plumbing for sink, add insulation and bath vent farn | $4,500 |