Matt Construction Corporation
- Based in
- Santa Fe Springs
- On San Francisco permits
- Dec 2011 to Sep 2012
- Last 24 months
- 0 permits filed
6 permits since 2000: 6 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2012 | Completed final sign-off Oct 2012 | 2323 Hyde St | infill 4 windows for fire and remove and replace 2 doors for fire compliance and relocate fluDetails
infill 4 windows for fire and remove and replace 2 doors for fire compliance and relocate flu | $10,000 |
| May 10, 2012 | Completed final sign-off Jul 2013 | 370 03rd St | revision to app#201203055349 which includes partition changes (minor). elevator lobby. sffd assembly permit is required for the a occupancy on the 2nd floor (137 persons)Details
revision to app#201203055349 which includes partition changes (minor). elevator lobby. sffd assembly permit is required for the a occupancy on the 2nd floor (137 persons) | $22,000 |
| Mar 27, 2012 | Completed final sign-off Feb 2013 | 370 03rd St | addition of roof top equipment, stellites & mech screen for 2nd & 3rd floor. ref pa #2012.0305.5349, struct pa #2011.1223.1257, mech pa #2012.0304.6029.Details
addition of roof top equipment, stellites & mech screen for 2nd & 3rd floor. ref pa #2012.0305.5349, struct pa #2011.1223.1257, mech pa #2012.0304.6029. | $370,000 |
| Mar 14, 2012 | Completed final sign-off Feb 2013 | 370 03rd St | deferred submittal of extg permit #201112231257 for floor strengthening with frp for 1) new slab opening at 3rd floor for seismic .2)increased live load at 2nd floor.Details
deferred submittal of extg permit #201112231257 for floor strengthening with frp for 1) new slab opening at 3rd floor for seismic .2)increased live load at 2nd floor. | |
| Mar 5, 2012 | Completed final sign-off Aug 2012 | 370 03rd St | tenant improvement to partial 2nd and 3rd fl of seven story building. includes new partitons, raised floor, convenience stair and 2 story high studio space. mechanical and electrical, plumbing, an fire protection under separate permit. no change of use or occupancy.Details
tenant improvement to partial 2nd and 3rd fl of seven story building. includes new partitons, raised floor, convenience stair and 2 story high studio space. mechanical and electrical, plumbing, an fire protection under separate permit. no change of use or occupancy. | $5,400,000 |
| Dec 23, 2011 | Completed final sign-off Feb 2013 | 370 03rd St | structural strengthening of 2nd floor and 3rd floor for the following: 1) new slab opening at 3rd floor. for seismic,2)increase live load at 2nd floor.new support grid at u/s of 3rd floor for lighting grid. new elevator shaft opening and pit.Details
structural strengthening of 2nd floor and 3rd floor for the following: 1) new slab opening at 3rd floor. for seismic,2)increase live load at 2nd floor.new support grid at u/s of 3rd floor for lighting grid. new elevator shaft opening and pit. | $200,000 |