Master Design
- Based in
- Los Angeles
- On San Francisco permits
- Aug 2010 to Dec 2014
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 never finaled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 10, 2014 | Never finaled issued Jan 2015, no final | 4625 Mission St | erect one single faced electric wall sign for "fred loya insurance".Details
erect one single faced electric wall sign for "fred loya insurance". | $3,200 |
| Aug 13, 2010 | Never finaled issued Aug 2010, no final | 2098 Mission St | non structural signDetails
non structural sign | $5,200 |
| Aug 13, 2010 | Never finaled issued Aug 2010, no final | 2098 Mission St | new awningDetails
new awning | $5,200 |