Mashal Builders & Contractors Inc
- Based in
- Richmond
- On San Francisco permits
- Oct 2002 to Jul 2022
- Last 24 months
- 0 permits filed
171 permits since 2000: 70 completed, 54 never finaled, 47 expired or cancelled.
Of the 54 never-finaled permits, 1 is 3 to 5 years old, 9 are 5 to 10 years old, 44 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 171.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 1, 2022 | Never finaled issued Jul 2022, no final | 790 Great Hy | apt 2: remodel one kitchen & 2 bathrooms. in kind non structural.Details
apt 2: remodel one kitchen & 2 bathrooms. in kind non structural. | $25,000 |
| Dec 23, 2021 | Completed final sign-off Apr 2022 | 632 Commercial St | 2/f: rev to pa201912200174: provide new wall between grid 1 & 2, new kitchenette @ grid line 1 @ basement and 2/f, new partition walls between grid lines 1 & 2Details
2/f: rev to pa201912200174: provide new wall between grid 1 & 2, new kitchenette @ grid line 1 @ basement and 2/f, new partition walls between grid lines 1 & 2 | $35,000 |
| Jun 29, 2021 | Never finaled issued Jun 2021, no final | 1531 Francisco St | remove old tile in bathroom, around bath tub, and install new tile. in apt #3 and 7 only.Details
remove old tile in bathroom, around bath tub, and install new tile. in apt #3 and 7 only. | $8,500 |
| May 18, 2021 | Never finaled issued May 2021, no final | 3201 Washington St | unit 3 & 12: remodel kitchen - replace kitchen cabinet with like for like, replace bathroom toilet & sink & shower valve without refinishing. no structural work. all work inside units 3 & 12 only. no changes to wall & openings.Details
unit 3 & 12: remodel kitchen - replace kitchen cabinet with like for like, replace bathroom toilet & sink & shower valve without refinishing. no structural work. all work inside units 3 & 12 only. no changes to wall & openings. | $30,000 |
| Nov 10, 2020 | Never finaled issued Nov 2020, no final | 1531 Francisco St | apt# 4: remodel kitchen and bathroom. open walls & ceilings to do electrical and plumbing work, upgrade electrical work in the apt. no structural work. no change to door and windows.Details
apt# 4: remodel kitchen and bathroom. open walls & ceilings to do electrical and plumbing work, upgrade electrical work in the apt. no structural work. no change to door and windows. | $35,000 |
| Sep 28, 2020 | Never finaled issued Sep 2020, no final | 1155 Jones St | apt 510: remodel kitchen & bathroom, in-kind. intsall new cabinets and counter top in kitchen, replace toilet and sink in bathroom, update electrical in thekitchen and bathroom. no structural work.Details
apt 510: remodel kitchen & bathroom, in-kind. intsall new cabinets and counter top in kitchen, replace toilet and sink in bathroom, update electrical in thekitchen and bathroom. no structural work. | $23,000 |
| Aug 24, 2020 | Never finaled issued Aug 2020, no final | 2232 North Point St | remodel kitchen and bathroom, upgrade elec through out the unit, add washer and dryer to clost, open plaster wall and replace with sheetrock to allow for plumbing and elec work, work will be only in apt #4, no change to door or windows, bathroom is 5x8 and kitchen is 8x10Details
remodel kitchen and bathroom, upgrade elec through out the unit, add washer and dryer to clost, open plaster wall and replace with sheetrock to allow for plumbing and elec work, work will be only in apt #4, no change to door or windows, bathroom is 5x8 and kitchen is 8x10 | $38,000 |
| Jan 10, 2020 | Completed final sign-off Aug 2020 | 1531 Francisco St | apt. #1: kitchen and bathroom remodel. upgrade electrical throughout. open walls for plumbing and electrical work as needed. no change to windows.Details
apt. #1: kitchen and bathroom remodel. upgrade electrical throughout. open walls for plumbing and electrical work as needed. no change to windows. | $35,000 |
| Dec 20, 2019 | Completed final sign-off Jun 2022 | 632 Commercial St | basement & 1st floor: commerical ti. change of use from medical services to job training. accessibility upgrades as per term of pre-app. level 1 and basement onlyDetails
basement & 1st floor: commerical ti. change of use from medical services to job training. accessibility upgrades as per term of pre-app. level 1 and basement only | $300,000 |
| Dec 20, 2019 | Completed final sign-off Apr 2022 | 632 Commercial St | 2nd floor: interior partition walls from previous tenant improvement. cleaning space. demo of existing walls. level 2 onlyDetails
2nd floor: interior partition walls from previous tenant improvement. cleaning space. demo of existing walls. level 2 only | $50,000 |
| Dec 12, 2019 | Completed final sign-off Aug 2020 | 1531 Francisco St | apt #6 - remodel kitchen and bathroom. open walls and ceilings as needed for electrical & plumbing. new wiring thru entire apt. no structural work. repair in kind 5/8" gpy bdDetails
apt #6 - remodel kitchen and bathroom. open walls and ceilings as needed for electrical & plumbing. new wiring thru entire apt. no structural work. repair in kind 5/8" gpy bd | $35,000 |
| Nov 26, 2019 | Completed final sign-off Apr 2022 | 632 Commercial St | level 5 -interior reconfiurations only commercial ti on level 5 - no structural. no change to exterior.Details
level 5 -interior reconfiurations only commercial ti on level 5 - no structural. no change to exterior. | $100,000 |
| Sep 5, 2019 | Never finaled issued Sep 2019, no final | 2232 North Point St | apt 6 - remodel kitchen install new cabinet and counter top. install new toilet and vanity. no change to doors and windowsDetails
apt 6 - remodel kitchen install new cabinet and counter top. install new toilet and vanity. no change to doors and windows | $35,000 |
| Jun 20, 2019 | Never finaled issued Oct 2020, no final | 3036 Fulton St | convert 3 guest rooms with cooking into 3 legal dwelling units/leave extg residential unit 1 intact. renovate remaining units within extg bldg envelope. 4 new dormers at roof level. new units in extg attic reduce retail size.reconfigure(e)deck.add window@level 3 front.Details
convert 3 guest rooms with cooking into 3 legal dwelling units/leave extg residential unit 1 intact. renovate remaining units within extg bldg envelope. 4 new dormers at roof level. new units in extg attic reduce retail size.reconfigure(e)deck.add window@level 3 front. | $350,000 |
| Feb 15, 2018 | Never finaled issued Feb 2018, no final | 1155 Jones St | unit 401 remove kitchen cabinets, upgrade electrical in kitchen and install new cabinets. rmove old sin and toilet in bathroom. instll new one. no change to windows no str. workDetails
unit 401 remove kitchen cabinets, upgrade electrical in kitchen and install new cabinets. rmove old sin and toilet in bathroom. instll new one. no change to windows no str. work | $28,000 |
| Jan 8, 2018 | Never finaled issued Jan 2018, no final | 899 Pine St | apt 806 - replace kitchen cabinets and countertop. replace bathroom , sink, toilet and shower valve. no structural work, no change to doors or windows. lights to meet title 24 in bathroom and kitchen.Details
apt 806 - replace kitchen cabinets and countertop. replace bathroom , sink, toilet and shower valve. no structural work, no change to doors or windows. lights to meet title 24 in bathroom and kitchen. | $18,000 |
| Nov 6, 2017 | Completed final sign-off Aug 2018 | 1400 Mcallister St | to obtain final inspection for work approved under pa #200911040588, 201201061793, 201302200488. all work is approvedDetails
to obtain final inspection for work approved under pa #200911040588, 201201061793, 201302200488. all work is approved | |
| May 18, 2016 | Never finaled issued May 2016, no final | 2232 North Point St | unit #7: relocate kitchen, remodel bathrooms, install new elec in bathroom and kitchen. install washer and dryer in closet. no structural work. no change to windows and doors. n/a for maherDetails
unit #7: relocate kitchen, remodel bathrooms, install new elec in bathroom and kitchen. install washer and dryer in closet. no structural work. no change to windows and doors. n/a for maher | $35,000 |
| May 18, 2016 | Never finaled issued May 2016, no final | 2232 North Point St | unit #9: relocate kitchen, remodel bathrooms, install new elec in bathroom and kitchen. install washer and dryer in closet. no structural work. no change to windows and doors. n/a for maherDetails
unit #9: relocate kitchen, remodel bathrooms, install new elec in bathroom and kitchen. install washer and dryer in closet. no structural work. no change to windows and doors. n/a for maher | $35,000 |
| May 18, 2016 | Never finaled issued May 2016, no final | 2232 North Point St | unit #12: relocate kitchen, remodel bathrooms, install new elec in bathroom and kitchen. install washer and dryer in closet. no structural work. no change to windows and doors. n/a for maherDetails
unit #12: relocate kitchen, remodel bathrooms, install new elec in bathroom and kitchen. install washer and dryer in closet. no structural work. no change to windows and doors. n/a for maher | $35,000 |
| May 18, 2016 | Never finaled issued May 2016, no final | 2232 North Point St | unit #2: relocate kitchen, remodel bathrooms, install new elec in bathroom and kitchen. install washer and dryer in closet. no structural work. no change to windows and doors. n/a for maherDetails
unit #2: relocate kitchen, remodel bathrooms, install new elec in bathroom and kitchen. install washer and dryer in closet. no structural work. no change to windows and doors. n/a for maher | $35,000 |
| May 10, 2016 | Completed final sign-off Nov 2016 | 899 Pine St | apt. #807: kitchen and bathroom remodel. install new cabinets. replace bathroom fixtures only, tile floor and walls. no structural work. no changes to window.Details
apt. #807: kitchen and bathroom remodel. install new cabinets. replace bathroom fixtures only, tile floor and walls. no structural work. no changes to window. | $15,000 |
| Jan 21, 2016 | Never finaled issued Jan 2016, no final | 765 14th Av | work on apt # 4 & 6 . remodel 2 bathrooms, & 1 1/2 bathroom remodel kitchen in each apt. replace (e) fan in bathroom w/new energy efficient ,use (e) duct upgrade electrical in bathrooms&kitchens. no changeto windows no structural work light in kitchen &bathroom to be energy efficiect to comply w/ttlDetails
work on apt # 4 & 6 . remodel 2 bathrooms, & 1 1/2 bathroom remodel kitchen in each apt. replace (e) fan in bathroom w/new energy efficient ,use (e) duct upgrade electrical in bathrooms&kitchens. no changeto windows no structural work light in kitchen &bathroom to be energy efficiect to comply w/ttl | $80,000 |
| Jan 21, 2016 | Never finaled issued Jan 2016, no final | 765 14th Av | work on apt # 3 & 5 . remodel 2 bathrooms, & 1 1/2 bathroom remodel kitchen in each apt. replace (e) fan in bathroom w/new energy efficient ,use (e) duct upgrade electrical in bathrooms&kitchens. no changeto windows no structural work light in kitchen &bathroom to be energy efficiect to comply w/ttlDetails
work on apt # 3 & 5 . remodel 2 bathrooms, & 1 1/2 bathroom remodel kitchen in each apt. replace (e) fan in bathroom w/new energy efficient ,use (e) duct upgrade electrical in bathrooms&kitchens. no changeto windows no structural work light in kitchen &bathroom to be energy efficiect to comply w/ttl | $80,000 |
| Dec 7, 2015 | Never finaled issued Dec 2015, no final | 765 14th Av | #1 and #2- relocate kitchen, delete study, add office with egress to back stair, re-arrange en-suite baths and closet at bedroom #1 and #2, add full bath at half bath, no structural work, no change to windows. n/a ordinance #155-13Details
#1 and #2- relocate kitchen, delete study, add office with egress to back stair, re-arrange en-suite baths and closet at bedroom #1 and #2, add full bath at half bath, no structural work, no change to windows. n/a ordinance #155-13 | $75,000 |
| Jul 16, 2015 | Never finaled issued Jul 2015, no final | 899 Pine St | kitchen and bathroom remodel for apt. #1009. install new light to meet title 24. no structural work. no change to windows.Details
kitchen and bathroom remodel for apt. #1009. install new light to meet title 24. no structural work. no change to windows. | $35,000 |
| Jul 13, 2015 | Completed final sign-off Nov 2017 | 2232 North Point St | remodel of 2 units: #5 and #8 per plans dated 7/2/15. relocate extg kitchen to be part of the living room and add one bedroom where ktichen was. install new light per title 24. no window change. no structural work. all work in apt 5 and 8 only.Details
remodel of 2 units: #5 and #8 per plans dated 7/2/15. relocate extg kitchen to be part of the living room and add one bedroom where ktichen was. install new light per title 24. no window change. no structural work. all work in apt 5 and 8 only. | $150,000 |
| Feb 17, 2015 | Never finaled issued Feb 2015, no final | 1761 Vallejo St | apt 301: remodel kitchen and replace vanity in bathroom. upgrade electrical in kitchen. lights to comply with title 24. no structural work. no walls to be removed. finish and fixtures.Details
apt 301: remodel kitchen and replace vanity in bathroom. upgrade electrical in kitchen. lights to comply with title 24. no structural work. no walls to be removed. finish and fixtures. | $15,000 |
| Feb 12, 2015 | Never finaled issued Feb 2015, no final | 370 Ellis St | apt #5 - to comply w/nov #201489571 - remodel kitchen & bathroom, upgrade elect. lights in bathroom & kitchen to comply with title 24. no structural work.Details
apt #5 - to comply w/nov #201489571 - remodel kitchen & bathroom, upgrade elect. lights in bathroom & kitchen to comply with title 24. no structural work. | $15,000 |
| Jan 14, 2015 | Never finaled issued Jan 2015, no final | 899 Pine St | unit 205 - remodel kitchen and bathroom. install new electric in kitchen and bathroom, tile walls and floor. no structural work. no change to door or windows. light to meet title 24 in bathroom and kitchenDetails
unit 205 - remodel kitchen and bathroom. install new electric in kitchen and bathroom, tile walls and floor. no structural work. no change to door or windows. light to meet title 24 in bathroom and kitchen | $25,000 |
| Jan 14, 2015 | Expired or cancelled cancelled Jan 2026 | 899 Pine St | unit 205: remodel kitchen and bathroom. install new electrical in kitchen and bathroom. tile walls and floor. no structural work, no change to door or windows, light ot meet title 24 in bathroom and kitchen.Details
unit 205: remodel kitchen and bathroom. install new electrical in kitchen and bathroom. tile walls and floor. no structural work, no change to door or windows, light ot meet title 24 in bathroom and kitchen. | $25,000 |
| Dec 17, 2014 | Expired or cancelled expired Aug 2019 | 1485 Bush St | installation of (n) windows on (e) openings at ground floor. commercial space is vacant. n/a maher ordinance. ab-017 applies.Details
installation of (n) windows on (e) openings at ground floor. commercial space is vacant. n/a maher ordinance. ab-017 applies. | $10,000 |
| Oct 29, 2014 | Never finaled issued Oct 2014, no final | 1155 Jones St | remodel 3 kitchen and 3 partial bathrooms fixtures only apts 210, 310 & 303. install new lights in kitchen adn bathroom to meet tilte 24 (cec 150k). no change to door or windows, no structural work. work inside units onlyDetails
remodel 3 kitchen and 3 partial bathrooms fixtures only apts 210, 310 & 303. install new lights in kitchen adn bathroom to meet tilte 24 (cec 150k). no change to door or windows, no structural work. work inside units only | $75,000 |
| Sep 15, 2014 | Never finaled issued Sep 2014, no final | 1155 Jones St | apt 407 - kitchen and bath remodel; no door or window change. no structural work. to comply with cec150.0(k)3 & 5Details
apt 407 - kitchen and bath remodel; no door or window change. no structural work. to comply with cec150.0(k)3 & 5 | $15,000 |
| Sep 15, 2014 | Completed final sign-off Feb 2015 | 1485 Bush St | repair all existing windows by replacing all window sashes with in-kind wood window sashes to match existing window sashes. window frame to remain the same. 62 windows. no structural work. install double glazed glass.Details
repair all existing windows by replacing all window sashes with in-kind wood window sashes to match existing window sashes. window frame to remain the same. 62 windows. no structural work. install double glazed glass. | $30,000 |
| Sep 3, 2014 | Never finaled issued Sep 2014, no final | 1155 Jones St | #502: remodel 1 kitchen and partial 1 bath, upgrade electrical in kitchen and room. no changes to doors and windows. install lights in kitchen and bath to comply with title 24 (cec 150k). no change to walls, no structural work.Details
#502: remodel 1 kitchen and partial 1 bath, upgrade electrical in kitchen and room. no changes to doors and windows. install lights in kitchen and bath to comply with title 24 (cec 150k). no change to walls, no structural work. | $15,000 |
| Sep 2, 2014 | Never finaled issued Sep 2014, no final | 1155 Jones St | remodel 2 kitchens and 2 partial bathrooms (unit 509, 503), upgrade electrical. install new light in kitchen and bathroom to meet title 24 (cec 150k). no change to door sna windows, no structural work. all led lighting.Details
remodel 2 kitchens and 2 partial bathrooms (unit 509, 503), upgrade electrical. install new light in kitchen and bathroom to meet title 24 (cec 150k). no change to door sna windows, no structural work. all led lighting. | $30,000 |
| Aug 22, 2014 | Never finaled issued Aug 2014, no final | 1155 Jones St | apt #305 & #409 - remodel kitchen & bathrooms. upgrade elec, install new light in kitchen & bathroom to comply with title 24 (ced 150k), no window change, no structural work, no change on walls.Details
apt #305 & #409 - remodel kitchen & bathrooms. upgrade elec, install new light in kitchen & bathroom to comply with title 24 (ced 150k), no window change, no structural work, no change on walls. | $45,000 |
| Jul 23, 2014 | Never finaled issued Jul 2014, no final | 1155 Jones St | remodel kitchen & bath, apt's 402, 403, 406, 209; upgrade electrical, add new light in kitchen & bath to comply with title 24 (cec 150k), no change to doors/windows, no structural work, replace in-kind.Details
remodel kitchen & bath, apt's 402, 403, 406, 209; upgrade electrical, add new light in kitchen & bath to comply with title 24 (cec 150k), no change to doors/windows, no structural work, replace in-kind. | $60,000 |
| Jul 7, 2014 | Never finaled issued Jul 2014, no final | 1155 Jones St | work in apt 307,309,410 remodel kitchen and replace toilet and sink in bathroom. kitchen and bath lits, to comply with title 24 cec 150, no change to windows and doors. no structural. upgrade elec in units. remove replace cabinets in kitchensDetails
work in apt 307,309,410 remodel kitchen and replace toilet and sink in bathroom. kitchen and bath lits, to comply with title 24 cec 150, no change to windows and doors. no structural. upgrade elec in units. remove replace cabinets in kitchens | $45,000 |
| Jun 24, 2014 | Never finaled issued Jun 2014, no final | 1155 Jones St | units 105, 107, 208, 308, 405, 408, 507, 606, 607: remodel kitchen & replace toilet & sink in bathrooms, kitchen lights to comply with title 24 (cec150k), no change to windows & doors, no structural work, upgrade electrical in units.Details
units 105, 107, 208, 308, 405, 408, 507, 606, 607: remodel kitchen & replace toilet & sink in bathrooms, kitchen lights to comply with title 24 (cec150k), no change to windows & doors, no structural work, upgrade electrical in units. | $95,000 |
| May 14, 2014 | Never finaled issued Dec 2014, no final | 899 Pine St | install new non-combustible roof deck. maher n/a.Details
install new non-combustible roof deck. maher n/a. | $40,000 |
| May 9, 2014 | Completed final sign-off Jul 2014 | 240 Ritch St | 1st time tenant improvements for retail bakery, install plumbing & electrical. ref. to pa#200701051074Details
1st time tenant improvements for retail bakery, install plumbing & electrical. ref. to pa#200701051074 | $20,000 |
| Mar 31, 2014 | Never finaled issued Mar 2014, no final | 1155 Jones St | remodel kitchen and bath; upgrade elec in the apt #306,602); install new light in compliance to title 24, no window change , no structural work ; lightig and control per cec 150k, no doors changingDetails
remodel kitchen and bath; upgrade elec in the apt #306,602); install new light in compliance to title 24, no window change , no structural work ; lightig and control per cec 150k, no doors changing | $50,000 |
| Mar 31, 2014 | Never finaled issued Mar 2014, no final | 1155 Jones St | apt 207- kitchen and bathroom remodel; to comply with cec150(k) 8 l& 10;; no window or door change ; no structural work. compliance with ord 155-13 not requiredDetails
apt 207- kitchen and bathroom remodel; to comply with cec150(k) 8 l& 10;; no window or door change ; no structural work. compliance with ord 155-13 not required | $25,000 |
| Mar 19, 2014 | Completed final sign-off Feb 2015 | 1485 Bush St | remodel bathroom and replace kitchenette apt 201-207. open walls and ceiling as needed to do plumbing and elec work, new lights in bathroom to mec cec150k, new sheetrock on all open walls. no window change, no structural work, bathroom fan to connect to (e) flue pipe.Details
remodel bathroom and replace kitchenette apt 201-207. open walls and ceiling as needed to do plumbing and elec work, new lights in bathroom to mec cec150k, new sheetrock on all open walls. no window change, no structural work, bathroom fan to connect to (e) flue pipe. | $100,000 |
| Mar 19, 2014 | Completed final sign-off Feb 2015 | 1485 Bush St | remodel bathroom and replace kitchenette apt 301-307. open walls as needed to do plumbing and elec work. new lights in the bathroom to meet sc cec 150k, new sheetrock on all open walls. no window change; no structural work, bathroom fan to connect to flueDetails
remodel bathroom and replace kitchenette apt 301-307. open walls as needed to do plumbing and elec work. new lights in the bathroom to meet sc cec 150k, new sheetrock on all open walls. no window change; no structural work, bathroom fan to connect to flue | $100,000 |
| Mar 19, 2014 | Never finaled issued Mar 2014, no final | 1155 Jones St | apt 604, 608, 610. remodel kitchen and bathroom, upgrade electrical throughout each apt. new lighting. in kitchen and bathroom to meet title 24. no structural work, no window change.Details
apt 604, 608, 610. remodel kitchen and bathroom, upgrade electrical throughout each apt. new lighting. in kitchen and bathroom to meet title 24. no structural work, no window change. | $75,000 |
| Mar 19, 2014 | Never finaled issued Mar 2014, no final | 1155 Jones St | apt 501, 201, 101. remodel kitchen and bathroom, upgrade electrical throughout each apt. new lighting. in kitchen and bathroom to meet title 24. no structural work, no window change, open up sheetrock for plumbing and electrical work.Details
apt 501, 201, 101. remodel kitchen and bathroom, upgrade electrical throughout each apt. new lighting. in kitchen and bathroom to meet title 24. no structural work, no window change, open up sheetrock for plumbing and electrical work. | $75,000 |
| Mar 19, 2014 | Completed final sign-off Feb 2015 | 1485 Bush St | comply with complaint 201450161remodel bathroom and replace kitchenette apt 101-107, open wall and ciling as needed to do plumbing and elec work. new lights in bathroom to meet cec 150k, new sheetrock on all open walls. no window change, no structural work. bathroom fan to connect to (e) flue pipe.Details
comply with complaint 201450161remodel bathroom and replace kitchenette apt 101-107, open wall and ciling as needed to do plumbing and elec work. new lights in bathroom to meet cec 150k, new sheetrock on all open walls. no window change, no structural work. bathroom fan to connect to (e) flue pipe. | $100,000 |
| Feb 3, 2014 | Never finaled issued Feb 2014, no final | 1155 Jones St | unit #601: remodel kitchen and bathroom, upgrade elec work install light in kitchen and bathroom to meet title 24, no structural work, no window change compliance with ord 155-13 not requiredDetails
unit #601: remodel kitchen and bathroom, upgrade elec work install light in kitchen and bathroom to meet title 24, no structural work, no window change compliance with ord 155-13 not required | $25,000 |
| Feb 3, 2014 | Completed final sign-off Jan 2015 | 1155 Jones St | #104: remodel kitchen and bathroom, upgrade elec work, install new light in kitchen & bathroom tomeet title 24, no window change, no structural work; compliance with ord 155-13 not requiredDetails
#104: remodel kitchen and bathroom, upgrade elec work, install new light in kitchen & bathroom tomeet title 24, no window change, no structural work; compliance with ord 155-13 not required | $20,000 |
| Feb 3, 2014 | Never finaled issued Feb 2014, no final | 1155 Jones St | #301 - remodel kitchen & bathroom, upgrade electrical, install new light in kitchen & bathroom to meet title 24. no structural work, no window change.Details
#301 - remodel kitchen & bathroom, upgrade electrical, install new light in kitchen & bathroom to meet title 24. no structural work, no window change. | $25,000 |
| Dec 24, 2013 | Completed final sign-off Apr 2014 | 2737 Sutter St | work in unit #4: revision to 201311010955: remove old plaster off walls and replace with sheetrock and add insulation in walls. no new partitions on this permit.Details
work in unit #4: revision to 201311010955: remove old plaster off walls and replace with sheetrock and add insulation in walls. no new partitions on this permit. | $15,000 |
| Nov 26, 2013 | Completed final sign-off Feb 2015 | 1485 Bush St | remodel bathroom and replace kitchentte apt 401-407. open up walls as needed for elec and plumbing work. install lights in bathroom to meet title 24, cec 150(k). no window changes. new fan to existing duct.Details
remodel bathroom and replace kitchentte apt 401-407. open up walls as needed for elec and plumbing work. install lights in bathroom to meet title 24, cec 150(k). no window changes. new fan to existing duct. | $70,000 |
| Nov 1, 2013 | Completed final sign-off Apr 2014 | 2737 Sutter St | #13- kitchen & bath remodeling to comply with title 24 lights in bathroom and kitchen. rewire all eelctric for units, new sheetrock, new doors.Details
#13- kitchen & bath remodeling to comply with title 24 lights in bathroom and kitchen. rewire all eelctric for units, new sheetrock, new doors. | $20,000 |
| Nov 1, 2013 | Completed final sign-off Apr 2014 | 2737 Sutter St | #4- to complete work and obtain final inspection for work approved under pa#200705111098.Details
#4- to complete work and obtain final inspection for work approved under pa#200705111098. | $15,000 |
| Oct 17, 2013 | Never finaled issued Oct 2013, no final | 899 Pine St | apartments 505, 1605 & 1006 kitchen & bath remodel, add sink in lobby, no structural work, lights & bathroom switches to meet title 24 building code cus 150cr, no change on wall and opening bathroom has exhaust fan, kitchen to have 50% flourescent title 24 (fc150)kDetails
apartments 505, 1605 & 1006 kitchen & bath remodel, add sink in lobby, no structural work, lights & bathroom switches to meet title 24 building code cus 150cr, no change on wall and opening bathroom has exhaust fan, kitchen to have 50% flourescent title 24 (fc150)k | $60,000 |
| Jun 11, 2013 | Completed final sign-off Oct 2013 | 899 Pine St | remodel lower lobby area, relocate restroom, relocate laundry in the back. relocate mail boxes. install new light. make one room as gym. no structural work. no change to the outside of bldg.Details
remodel lower lobby area, relocate restroom, relocate laundry in the back. relocate mail boxes. install new light. make one room as gym. no structural work. no change to the outside of bldg. | $50,000 |
| Jun 5, 2013 | Completed final sign-off Oct 2013 | 2737 Sutter St | work in unit #7: kitchen and bath remodeling to comply with nov 3200797296. 201297936 to be obtained at a later day.Details
work in unit #7: kitchen and bath remodeling to comply with nov 3200797296. 201297936 to be obtained at a later day. | $12,000 |
| Mar 19, 2013 | Completed final sign-off Oct 2013 | 899 Pine St | kitchen and bath remodeling. apt 201-211, no structural work, lights in bath and kitchen to meet title 24 building code per cec 150(k). no change to windows, bathroom has (e) fan, kitchen to have a recurcirlating fan, kitchen to have 50% florcent light as per title 24, cec 150(k).Details
kitchen and bath remodeling. apt 201-211, no structural work, lights in bath and kitchen to meet title 24 building code per cec 150(k). no change to windows, bathroom has (e) fan, kitchen to have a recurcirlating fan, kitchen to have 50% florcent light as per title 24, cec 150(k). | $150,000 |
| Feb 20, 2013 | Never finaled issued Feb 2013, no final | 1400 Mcallister St | kitchen and bath remodeling. install new cabinets and counter top. no window change. no structural work. kitchen to have 50% flourscent light. bathroom to meet t-24 cec 150(k). recirculating fan in the kitchen.Details
kitchen and bath remodeling. install new cabinets and counter top. no window change. no structural work. kitchen to have 50% flourscent light. bathroom to meet t-24 cec 150(k). recirculating fan in the kitchen. | $25,000 |
| Feb 20, 2013 | Completed final sign-off Oct 2013 | 899 Pine St | kitchen and bath remodeling at apt #301-311. no structural work, lighting and bathroom switches to meet t-24 bldg co per cec 150(k). no change on wall and opening, bathrooom has existing fan. recirculating fan in the kitchen. kitchen to have 50% flourscent lighting as per t-24 cec (150)k.Details
kitchen and bath remodeling at apt #301-311. no structural work, lighting and bathroom switches to meet t-24 bldg co per cec 150(k). no change on wall and opening, bathrooom has existing fan. recirculating fan in the kitchen. kitchen to have 50% flourscent lighting as per t-24 cec (150)k. | $150,000 |
| Feb 4, 2013 | Completed final sign-off Oct 2013 | 899 Pine St | kitchen and bath remodeling for units #401 to #411. eleven (11) kitchens and eleven (11) bath remodel. no structural work, lighting will meet title 24 code. bathroom vent connected to existing.Details
kitchen and bath remodeling for units #401 to #411. eleven (11) kitchens and eleven (11) bath remodel. no structural work, lighting will meet title 24 code. bathroom vent connected to existing. | $100,000 |
| Feb 1, 2013 | Completed final sign-off Jul 2013 | 2677 Larkin St | design correction for apartment #503. revision app#201301087516Details
design correction for apartment #503. revision app#201301087516 | |
| Jan 16, 2013 | Completed final sign-off Jul 2013 | 2677 Larkin St | all work in unit 102: remodel kitchen and bath. remove and add interior walls (non-bearing). convert extg kitchen to new bathroom. add electrical.Details
all work in unit 102: remodel kitchen and bath. remove and add interior walls (non-bearing). convert extg kitchen to new bathroom. add electrical. | $30,000 |
| Jan 15, 2013 | Completed final sign-off Jul 2013 | 899 Pine St | kitchen and bath remodeling for aprtments 1601, 1603, 1604, 1606, 1607, 1610, 1611. no structural work. lighting in kitchen & bathroom meet title 24Details
kitchen and bath remodeling for aprtments 1601, 1603, 1604, 1606, 1607, 1610, 1611. no structural work. lighting in kitchen & bathroom meet title 24 | $80,000 |
| Jan 8, 2013 | Completed final sign-off Jul 2013 | 2677 Larkin St | remodel in unit 303. kitchen and bath remodel. add and remove interior non bearing walls. convert e kitchen into new bedroom, add new bathroom. add electricalDetails
remodel in unit 303. kitchen and bath remodel. add and remove interior non bearing walls. convert e kitchen into new bedroom, add new bathroom. add electrical | $12,000 |
| Jan 8, 2013 | Completed final sign-off Jul 2013 | 2677 Larkin St | all work done in unit#503: remodel kitchen/bath. add/remove interior non bearing walls. convert extg kitchen to new bedroom. add electrical.Details
all work done in unit#503: remodel kitchen/bath. add/remove interior non bearing walls. convert extg kitchen to new bedroom. add electrical. | $12,000 |
| Nov 29, 2012 | Completed final sign-off Jul 2013 | 899 Pine St | kitchen and bathroom remodeling to units #701 to #711. no structural work.lighting and bathroom switches will meet title 24 bldg code per cec 150 ck. no change on walls and opening. new exaust fan connected to extg duct.Details
kitchen and bathroom remodeling to units #701 to #711. no structural work.lighting and bathroom switches will meet title 24 bldg code per cec 150 ck. no change on walls and opening. new exaust fan connected to extg duct. | $150,000 |
| Nov 29, 2012 | Completed final sign-off Jul 2013 | 899 Pine St | kitchen and bathroom remodeling to units #601 to 611. no structural work.lighting and bathroom switches will meet title 24 bldg code per cec 150 ck. no change on walls and opening. new exaust fan connected to extg duct.Details
kitchen and bathroom remodeling to units #601 to 611. no structural work.lighting and bathroom switches will meet title 24 bldg code per cec 150 ck. no change on walls and opening. new exaust fan connected to extg duct. | $150,000 |
| Oct 22, 2012 | Completed final sign-off Mar 2013 | 899 Pine St | 8th floor: kitchen and bathroom remodeling for units 801, 802, 803, 804, 805, 808, 809, 810, 811. no structural work. lighting will meet title 24. no mechanicalDetails
8th floor: kitchen and bathroom remodeling for units 801, 802, 803, 804, 805, 808, 809, 810, 811. no structural work. lighting will meet title 24. no mechanical | $90,000 |
| Oct 22, 2012 | Never finaled issued Oct 2012, no final | 899 Pine St | 15th floor: kitchen and bathroom remodeling for units 1501, 1502, 1503, 1504, 1505, 1506, 1508, 1509, 1510, 1511. no structural work. lighting will meet title 24. no mechanicalDetails
15th floor: kitchen and bathroom remodeling for units 1501, 1502, 1503, 1504, 1505, 1506, 1508, 1509, 1510, 1511. no structural work. lighting will meet title 24. no mechanical | $100,000 |
| Oct 22, 2012 | Completed final sign-off Mar 2013 | 899 Pine St | 9th floor: kitchen and bathroom remodeling for units 902, 905, 906, 907, 908, 910, 911. no structural work. lighting will meet title 24. no mechanicalDetails
9th floor: kitchen and bathroom remodeling for units 902, 905, 906, 907, 908, 910, 911. no structural work. lighting will meet title 24. no mechanical | $70,000 |
| Sep 12, 2012 | Never finaled issued Sep 2012, no final | 899 Pine St | kitchen & bath remodeling for units #101, 102, 103, 104, 105, 106,107, 108 & 111. no structural work and lighting will meet title 24 code.Details
kitchen & bath remodeling for units #101, 102, 103, 104, 105, 106,107, 108 & 111. no structural work and lighting will meet title 24 code. | $90,000 |
| Sep 12, 2012 | Completed final sign-off Jul 2013 | 899 Pine St | renovate lobby, lighting, wall covers, tile & reception, (n) shelves.Details
renovate lobby, lighting, wall covers, tile & reception, (n) shelves. | $20,000 |
| Aug 24, 2012 | Completed final sign-off Feb 2013 | 899 Pine St | kitchen and bath remodeling. units 1201 to 1211,1301 to 1311, 1001,1002,1003,1005,1004,1007,1008,1010,1011. no structure work needed and lighting for meet title 24. bldg code. total of 31-units.Details
kitchen and bath remodeling. units 1201 to 1211,1301 to 1311, 1001,1002,1003,1005,1004,1007,1008,1010,1011. no structure work needed and lighting for meet title 24. bldg code. total of 31-units. | $300,000 |
| Jul 30, 2012 | Completed final sign-off Jul 2013 | 899 Pine St | kitchen and bath remodel in 20 units (#1401 to #1408, #1411, #1101 to #1111). on 14th and 11th floors only. only interior work. no partion work. lighting meett-24 bldg code. fire alarm and/or sprinkler on separate permit.Details
kitchen and bath remodel in 20 units (#1401 to #1408, #1411, #1101 to #1111). on 14th and 11th floors only. only interior work. no partion work. lighting meett-24 bldg code. fire alarm and/or sprinkler on separate permit. | $200,000 |
| Jul 9, 2012 | Never finaled issued Jul 2012, no final | 899 Pine St | kitchen & bath remodeling for unit #1701, 1702, 1703, 1704, 1705, 1706, 1707, 1708, 1709, 1710, 1711, - 501, 502, 503, 504, 505, 506, 507, 508, 510, 511. no structural work and lighting will meet tile 24 bldg code.Details
kitchen & bath remodeling for unit #1701, 1702, 1703, 1704, 1705, 1706, 1707, 1708, 1709, 1710, 1711, - 501, 502, 503, 504, 505, 506, 507, 508, 510, 511. no structural work and lighting will meet tile 24 bldg code. | $220,000 |
| May 22, 2012 | Completed final sign-off Jul 2013 | 899 Pine St | kitchen & bath remodeling for apt #1409, no structural work, high efficiency lighting to meet code, one kitchen and 2 bathroomsDetails
kitchen & bath remodeling for apt #1409, no structural work, high efficiency lighting to meet code, one kitchen and 2 bathrooms | $15,000 |
| May 22, 2012 | Never finaled issued May 2012, no final | 899 Pine St | kitchen & bath remodel for #1801-#1811 (11 units). no structural work, high efficacy lighting.Details
kitchen & bath remodel for #1801-#1811 (11 units). no structural work, high efficacy lighting. | $100,000 |
| May 11, 2012 | Never finaled issued May 2012, no final | 899 Pine St | work in apt. 1901, 1902, 1906, 1907,1908, 1909, 1910, 1911: #remove 6' of kitchen cabinets and install new kitchen cabinets, remove tile in the bathroom and install new valve and new tile. replace toilet and sink, lights in the kitchen to meet title 24. no change to window. no structural work. .Details
work in apt. 1901, 1902, 1906, 1907,1908, 1909, 1910, 1911: #remove 6' of kitchen cabinets and install new kitchen cabinets, remove tile in the bathroom and install new valve and new tile. replace toilet and sink, lights in the kitchen to meet title 24. no change to window. no structural work. . | $80,000 |
| Mar 5, 2012 | Completed final sign-off Mar 2012 | 252 Church St | remove sign complain # 201176853 neon sign body & foot massage approx. 6 sq.ft.Details
remove sign complain # 201176853 neon sign body & foot massage approx. 6 sq.ft. | $50 |
| Feb 28, 2012 | Completed final sign-off Mar 2012 | 367 Bay St | for documentation purposes; change of use from accupunture-message to message only establishment, no work to be performed.Details
for documentation purposes; change of use from accupunture-message to message only establishment, no work to be performed. | |
| Feb 17, 2012 | Expired or cancelled expired Mar 2013 | 2065 Oak St | kitchen & bath remodeling, install new elec outlet & light open walls to do elec and plumbing walls and sheetrock no structural works, no change to windows kitchen to have 50% fluor, bathroom to have occupense sensor all work to meet title 24 add fan in bathrmDetails
kitchen & bath remodeling, install new elec outlet & light open walls to do elec and plumbing walls and sheetrock no structural works, no change to windows kitchen to have 50% fluor, bathroom to have occupense sensor all work to meet title 24 add fan in bathrm | $18,500 |
| Jan 6, 2012 | Never finaled issued Jan 2012, no final | 1400 Mcallister St | Details
| $8,500 |
| Jan 6, 2012 | Never finaled issued Jan 2012, no final | 115 Haight St | kitchen and bathroom remodeling. install new electrical and plumbing. no structural work changes. no window changes. kitchen to have 50% flourcent. bathroom to have occupancy sensor. all electrical work to meet title 24. add fan in the bathroom.Details
kitchen and bathroom remodeling. install new electrical and plumbing. no structural work changes. no window changes. kitchen to have 50% flourcent. bathroom to have occupancy sensor. all electrical work to meet title 24. add fan in the bathroom. | $15,500 |
| Dec 13, 2011 | Completed final sign-off Jan 2012 | 1360 Clayton St | to correct nov #200851761 & 200564017. remove constrution at rear level, done already. without the required bldg permit. dryrot repair. 1st floor: install new kitchen cabinets & counter top, sfbc section 103a.Details
to correct nov #200851761 & 200564017. remove constrution at rear level, done already. without the required bldg permit. dryrot repair. 1st floor: install new kitchen cabinets & counter top, sfbc section 103a. | $2,000 |
| Oct 28, 2011 | Never finaled issued Oct 2011, no final | 115 Haight St | #3 - kitchen and bathroom remodeling, remove old cabinet & install new elec. outlet. install new cabinets & counter top. no window changes, no structural change, kitchen to be 50% flourscent and bathroom to have occupance sensor. all elec. work to meet t-24. add fan in bathroom.Details
#3 - kitchen and bathroom remodeling, remove old cabinet & install new elec. outlet. install new cabinets & counter top. no window changes, no structural change, kitchen to be 50% flourscent and bathroom to have occupance sensor. all elec. work to meet t-24. add fan in bathroom. | $15,500 |
| Sep 7, 2011 | Completed final sign-off May 2012 | 252 Church St | new shower and laundry/12 inch raised platform. work taking place in the retail space only.Details
new shower and laundry/12 inch raised platform. work taking place in the retail space only. | $2,500 |
| Jun 27, 2011 | Completed final sign-off Dec 2011 | 1400 Mcallister St | remove old kitchen cabinets, install new one with counter top. install new tile in bathroom & replace sink. upgrade electrical in kind & bathroom to meet title 24. no windows change or structural work. kitchen to be @least 50% high efficacy by wattage, bathroom to be high efficacy or occupancy sensoDetails
remove old kitchen cabinets, install new one with counter top. install new tile in bathroom & replace sink. upgrade electrical in kind & bathroom to meet title 24. no windows change or structural work. kitchen to be @least 50% high efficacy by wattage, bathroom to be high efficacy or occupancy senso | $15,500 |
| Apr 13, 2011 | Completed final sign-off Dec 2011 | 1400 Mcallister St | apt #6: kitchen and bath remodeling, no any structure work needed, no windows and doros change, electric upgrade to meet title 24 requirementDetails
apt #6: kitchen and bath remodeling, no any structure work needed, no windows and doros change, electric upgrade to meet title 24 requirement | $15,500 |
| Apr 5, 2011 | Never finaled issued Apr 2011, no final | 2395 29th Av | #5- kitchen remodeling, no walls will be removed, no windows to be changed, lighting will meet title 24 code. no door & no ceiling work on this permit.Details
#5- kitchen remodeling, no walls will be removed, no windows to be changed, lighting will meet title 24 code. no door & no ceiling work on this permit. | $9,500 |
| Mar 4, 2011 | Expired or cancelled expired Aug 2012 | 1100 Sacramento St | #808 - kitchen and 2-1/2 bathroom remodeling, fix and paint the apt. no walls to be removed or window change. all kitchen and bathrooms lights meet cec. no structural work.Details
#808 - kitchen and 2-1/2 bathroom remodeling, fix and paint the apt. no walls to be removed or window change. all kitchen and bathrooms lights meet cec. no structural work. | $30,000 |
| Jan 31, 2011 | Expired or cancelled expired Jun 2012 | 1340 Taylor St | #4 - 1 kitchen & 1 bath remodeling, no window to be changed and no walls to be removed. motion sensor switch for bathroom light.Details
#4 - 1 kitchen & 1 bath remodeling, no window to be changed and no walls to be removed. motion sensor switch for bathroom light. | $14,000 |
| Oct 8, 2010 | Expired or cancelled expired Aug 2012 | 1100 Sacramento St | #308- kitchen and 3 and 1/2 bathroom remodeling. paint the whole apartment unit. no wall to move, all kitchen and bathroom meet cec. no window to be changed. no door work.Details
#308- kitchen and 3 and 1/2 bathroom remodeling. paint the whole apartment unit. no wall to move, all kitchen and bathroom meet cec. no window to be changed. no door work. | $35,000 |
| Oct 1, 2010 | Expired or cancelled expired Dec 2011 | 1565 Washington St | kitchen and bath remodeling in unit 10. no structural work, no window change.fix walls and paint. motion sensor switch in for bathroom light. meet title 24 lighting in kitchen.Details
kitchen and bath remodeling in unit 10. no structural work, no window change.fix walls and paint. motion sensor switch in for bathroom light. meet title 24 lighting in kitchen. | $18,200 |
| Aug 4, 2010 | Expired or cancelled cancelled Jan 2026 | 1390 Taylor St | unit #26 - kitchen & bathroom remodeling, paint the apartment. no structural work or window changing. no wall relocation.Details
unit #26 - kitchen & bathroom remodeling, paint the apartment. no structural work or window changing. no wall relocation. | $18,000 |
| Aug 4, 2010 | Expired or cancelled expired Mar 2013 | 950 Franklin St | unit #25 - kitchen & bathroom remodeling, paint the apartment. no structural work or window changing. no partition wall relocation.Details
unit #25 - kitchen & bathroom remodeling, paint the apartment. no structural work or window changing. no partition wall relocation. | $18,000 |
| Jun 15, 2010 | Expired or cancelled expired Apr 2013 | 620 Jones St | to complete work and obtain final inspectionj for work approved under app#200806093937Details
to complete work and obtain final inspectionj for work approved under app#200806093937 | $10,000 |