Martin Heagney
- Based in
- San Francisco
- On San Francisco permits
- Jul 2018 to Nov 2025
- Last 24 months
- 5 permits filed
21 permits since 2000: 15 completed, 4 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 4, 2025 | In progress issued Nov 2025 | 2434 20th Av | remove 3 single panel windows @rear of building and replace as is with vinyl clad double glazed windows, same location, same opening, in kind, facing rear yard, not facing street. all work in back of bldg.Details
remove 3 single panel windows @rear of building and replace as is with vinyl clad double glazed windows, same location, same opening, in kind, facing rear yard, not facing street. all work in back of bldg. | $3,500 |
| Jan 29, 2025 | Expired or cancelled withdrawn Mar 2025 | 700 12th Av | remove and replace 5 windows as is. visible from the street. in kind max u factor 0.3.Details
remove and replace 5 windows as is. visible from the street. in kind max u factor 0.3. | $3,500 |
| Jan 29, 2025 | In progress filed Jan 2025, not yet issued | 1737 Union St | remove and install 5 windows as is. visible from the street.Details
remove and install 5 windows as is. visible from the street. | $3,500 |
| Jan 29, 2025 | Completed final sign-off May 2026 | 1842 Union St | remove and replace 5 windows as is, visible from front. max u 0.58Details
remove and replace 5 windows as is, visible from front. max u 0.58 | $3,500 |
| Jan 17, 2025 | In progress issued Jan 2025 | 1226 Masonic Av | remove approx 10 1x8 board's in alley way which are damaged approx 10'-0" long and replace with cedar siding on side of buildingDetails
remove approx 10 1x8 board's in alley way which are damaged approx 10'-0" long and replace with cedar siding on side of building | $1,200 |
| Oct 4, 2023 | In progress issued Feb 2024 | 149 New Montgomery St | install plw3 formlock on top of existing brick wall as shown on plan and pour slabDetails
install plw3 formlock on top of existing brick wall as shown on plan and pour slab | $8,500 |
| Aug 11, 2023 | Completed final sign-off Sep 2023 | 818 Garfield St | remove existing driveway and planter and pour new concrete.Details
remove existing driveway and planter and pour new concrete. | $3,000 |
| Jun 5, 2023 | Completed final sign-off Aug 2023 | 871 41st Av | removing 10 windows back and front and replacing as is with aluminum clad or wood.Details
removing 10 windows back and front and replacing as is with aluminum clad or wood. | $7,000 |
| Oct 20, 2022 | Completed final sign-off Mar 2023 | 221 Lake St | demo existing bathroom. install new bath as per existing layout with plumbing and electric to code. new shower vanity and tile work, sheetrock, tape, paintDetails
demo existing bathroom. install new bath as per existing layout with plumbing and electric to code. new shower vanity and tile work, sheetrock, tape, paint | $20,000 |
| Aug 30, 2022 | Completed final sign-off Aug 2022 | 16 Ford St | to obtain final inspection of pa# 202007220630. all work is complete.Details
to obtain final inspection of pa# 202007220630. all work is complete. | |
| Sep 9, 2021 | Completed final sign-off Jan 2023 | 1844 Union St | 2nd fl t.i. including renovation of (e) bathroom & break area. reeplace finishes including capret, paint & tile. new led lighy fixtures. replace existing windows in existing openings. front windows to be double hung wood, rear and side windows to be double hung aluminum clad wood.Details
2nd fl t.i. including renovation of (e) bathroom & break area. reeplace finishes including capret, paint & tile. new led lighy fixtures. replace existing windows in existing openings. front windows to be double hung wood, rear and side windows to be double hung aluminum clad wood. | $45,000 |
| Aug 13, 2021 | Completed final sign-off Mar 2023 | 787 Clayton St | unit 4: remodel kitchen and bathroom, entry closet. replace rear facing windows with energy efficient windows. no change to (e) openings.Details
unit 4: remodel kitchen and bathroom, entry closet. replace rear facing windows with energy efficient windows. no change to (e) openings. | $24,000 |
| Jul 22, 2020 | Never finaled issued Jul 2020, no final | 16 Ford St | remove damaged siding at west and front of building. replace to match e wood siding approx 300 sq ftDetails
remove damaged siding at west and front of building. replace to match e wood siding approx 300 sq ft | $9,000 |
| Aug 26, 2019 | Completed final sign-off Jan 2020 | 303 Magellan Av | remove stucco in bathroom & bedroom livingroom in alley way, remove dryrot reframe & stucco to match existing. approx 150 sq ft area.Details
remove stucco in bathroom & bedroom livingroom in alley way, remove dryrot reframe & stucco to match existing. approx 150 sq ft area. | $5,000 |
| Jul 16, 2019 | Completed final sign-off Sep 2019 | 915 Hamilton St | remove damaged by roof leak in hallway kitchen & bedroom. reinstall insulation & sheetrock. check for electrical damage. repair in kind.Details
remove damaged by roof leak in hallway kitchen & bedroom. reinstall insulation & sheetrock. check for electrical damage. repair in kind. | $4,000 |
| Jun 24, 2019 | Completed final sign-off Sep 2019 | 304 Euclid Av | selective stucco repair due to dry rot around window and balcony - new stucco to match existing. no other work under this permit.Details
selective stucco repair due to dry rot around window and balcony - new stucco to match existing. no other work under this permit. | $4,500 |
| May 21, 2019 | Completed final sign-off Aug 2020 | 1520 Taylor St | unit # 603: remove, new walls extend kitchen into hallway, build wall between kitchen and office, extend bath walls in bedroomDetails
unit # 603: remove, new walls extend kitchen into hallway, build wall between kitchen and office, extend bath walls in bedroom | $25,000 |
| May 20, 2019 | Completed final sign-off Aug 2020 | 1520 Taylor St | (2) bathroom remodel: replace tile in shower, rpelace lights, replace toilet & sink. kitchen: replace all cabinets, rpelace appliances, replace 1/2 bath toilet, sink & faucet, upgrade electrical panel. tile floor.Details
(2) bathroom remodel: replace tile in shower, rpelace lights, replace toilet & sink. kitchen: replace all cabinets, rpelace appliances, replace 1/2 bath toilet, sink & faucet, upgrade electrical panel. tile floor. | $80,000 |
| May 14, 2019 | Completed final sign-off Jul 2019 | 186 Commonwealth Av | remove stucco around one first floor window (right hand side) to correct dry rot. repair/replace approximately 30 sqft of stucco in kind.Details
remove stucco around one first floor window (right hand side) to correct dry rot. repair/replace approximately 30 sqft of stucco in kind. | $4,500 |
| Feb 27, 2019 | Completed final sign-off Sep 2019 | 300 Euclid Av | remove stucco around first floor bedroom window. repair dry rot and replace as is. exploratory demo as required. max repair/replace 50% structural work.Details
remove stucco around first floor bedroom window. repair dry rot and replace as is. exploratory demo as required. max repair/replace 50% structural work. | $4,500 |
| Jul 10, 2018 | Completed final sign-off Aug 2018 | 1880 Fell St | remove damaged shingles in front of building and replace with cedar horizontal siding.Details
remove damaged shingles in front of building and replace with cedar horizontal siding. | $6,000 |