Marsh Creek Llc
- Based in
- Dixon
- On San Francisco permits
- May 2016 to Aug 2016
- Last 24 months
- 0 permits filed
6 permits since 2000: 5 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 31, 2016 | Completed final sign-off Jan 2018 | 250 Beach St | nextnav e-911 install 1 new omni directional antenna. 1 new ges unit 1 new equip cabinet on rooftop. install stealthing radon/smoke stack cover over omni-antenna. connect cabinet to (e) elect panel. per plans.Details
nextnav e-911 install 1 new omni directional antenna. 1 new ges unit 1 new equip cabinet on rooftop. install stealthing radon/smoke stack cover over omni-antenna. connect cabinet to (e) elect panel. per plans. | $10,000 |
| Aug 18, 2016 | Completed final sign-off Oct 2016 | 1485 Bay Shore Bl | remove the following: 3 panel antennas, 1 microwave antenna, gps, equipment rack, conduit, coak, fiber boxes, meter, emon, dmon,transformer.Details
remove the following: 3 panel antennas, 1 microwave antenna, gps, equipment rack, conduit, coak, fiber boxes, meter, emon, dmon,transformer. | $5,000 |
| Jul 14, 2016 | Completed final sign-off Oct 2016 | 101 California St | sprint, remove the following: (4) microwve antennas, gps antenna, equipment rack conduit/coax/cable tray, antenna mounts and hardware, junction boxes, emf signage, general plugDetails
sprint, remove the following: (4) microwve antennas, gps antenna, equipment rack conduit/coax/cable tray, antenna mounts and hardware, junction boxes, emf signage, general plug | $5,000 |
| Jul 14, 2016 | Never finaled issued Sep 2016, no final | 70 Charter Oak Av | sprint, remove the following: 3 panel antennas, microwave antennas, gps antenna, equipment shelter and platform, conduit/coax/cable tray, stealth screen and structure, antenna pipes mounting brackets and hardware, meter conduit, junction boxesDetails
sprint, remove the following: 3 panel antennas, microwave antennas, gps antenna, equipment shelter and platform, conduit/coax/cable tray, stealth screen and structure, antenna pipes mounting brackets and hardware, meter conduit, junction boxes | $5,000 |
| May 26, 2016 | Completed final sign-off Oct 2016 | 340 Stockton St | sprint pcs to remove 3 panel antennas and rrhs, remove 1 microwave antenna & odu, remove gps antenna, equipment cabinet, remove conduit, remove fiber junction box, remove antenna mounting brackets, remove signage, remove generator plug. ** maher: n/a **Details
sprint pcs to remove 3 panel antennas and rrhs, remove 1 microwave antenna & odu, remove gps antenna, equipment cabinet, remove conduit, remove fiber junction box, remove antenna mounting brackets, remove signage, remove generator plug. ** maher: n/a ** | $5,000 |
| May 26, 2016 | Completed final sign-off Nov 2016 | 222 Front St | sprint pcs to remove 3 panel antennas, remove equipment cabinet on platform in basement, conduit, fiber junction box, remove antenna mounting brackets, remove signage, remove generator plug. ** maher: n/a **Details
sprint pcs to remove 3 panel antennas, remove equipment cabinet on platform in basement, conduit, fiber junction box, remove antenna mounting brackets, remove signage, remove generator plug. ** maher: n/a ** | $5,000 |