Mars Construction
- Based in
- Walnut Creek
- On San Francisco permits
- Jun 2022 to Sep 2023
- Last 24 months
- 0 permits filed
12 permits since 2000: 8 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 27, 2023 | Completed final sign-off Dec 2023 | 1001 Pine St | unit 202: bathroom renovation in kind, bathtub into shower.Details
unit 202: bathroom renovation in kind, bathtub into shower. | $12,000 |
| May 1, 2023 | Expired or cancelled withdrawn Dec 2023 | 1717 Alabama St | (1) 21 sq ft powder room remodel on 1st floor in kind no structural no changes to walls or openings. all (n) fixtures and finishes. (n) toilet and vanity.Details
(1) 21 sq ft powder room remodel on 1st floor in kind no structural no changes to walls or openings. all (n) fixtures and finishes. (n) toilet and vanity. | $29,000 |
| Apr 24, 2023 | Expired or cancelled withdrawn Dec 2023 | 1717 Alabama St | 2 bathroom remodel bath (a) 46 sq ft primary 3/4 bath on 2nd ; (n) curbed shower toilet & vanity; bath (b) 62 sq ft full guest bath on 2nd fl; remove non-bearing wall separting toilet & shower; relocate door. (n) tub/shower, toilet & vanityDetails
2 bathroom remodel bath (a) 46 sq ft primary 3/4 bath on 2nd ; (n) curbed shower toilet & vanity; bath (b) 62 sq ft full guest bath on 2nd fl; remove non-bearing wall separting toilet & shower; relocate door. (n) tub/shower, toilet & vanity | $50,000 |
| Mar 2, 2023 | Completed final sign-off Aug 2023 | 1045 York St | one 47 sq ft 3/4 bathroom remodel on 2nd floor in kind. no structural. no changes to walls or openings. replace extg with new curbed shower toilet and vanity. all new fixtures and finishes.Details
one 47 sq ft 3/4 bathroom remodel on 2nd floor in kind. no structural. no changes to walls or openings. replace extg with new curbed shower toilet and vanity. all new fixtures and finishes. | $29,000 |
| Feb 14, 2023 | Completed final sign-off Oct 2023 | 2369 Union St | #2: one 38 sq ft bathroom remodel on 2nd floor inkind. no structural. no changes to walls or openings. replace extg with new tub/shower, toilet, and vanity. all new fixtures and finishes.Details
#2: one 38 sq ft bathroom remodel on 2nd floor inkind. no structural. no changes to walls or openings. replace extg with new tub/shower, toilet, and vanity. all new fixtures and finishes. | $29,000 |
| Feb 7, 2023 | Completed final sign-off Aug 2023 | 378 29th Av | 3/f: (1) full bathroom remodel (38 sq. ft.) in-kind. no structural/wall changes/openings. replace (e) w/new tub/shower, toilet & vanity, all new fixtures/finishesDetails
3/f: (1) full bathroom remodel (38 sq. ft.) in-kind. no structural/wall changes/openings. replace (e) w/new tub/shower, toilet & vanity, all new fixtures/finishes | $29,000 |
| Jan 24, 2023 | Completed final sign-off Apr 2023 | 123 Corwin St | one 47 sq bath remodel on 2nd fl in kind. no structural no changes to walls or openings. replace e with n tub shower, toilet, and vanity. all new fixtures and finishesDetails
one 47 sq bath remodel on 2nd fl in kind. no structural no changes to walls or openings. replace e with n tub shower, toilet, and vanity. all new fixtures and finishes | $14,500 |
| Jan 19, 2023 | Never finaled issued Jan 2023, no final | 2360 Union St | unit #6: one 38 sq ft 3/4 bathroom remodel on 4th floor. no structural. no changes to walls or openings. in kind replace existing with (n) curbed shower, toilet, and vanity. all (n) fixtures and finishes.Details
unit #6: one 38 sq ft 3/4 bathroom remodel on 4th floor. no structural. no changes to walls or openings. in kind replace existing with (n) curbed shower, toilet, and vanity. all (n) fixtures and finishes. | $12,000 |
| Dec 19, 2022 | Completed final sign-off Nov 2023 | 20 Josiah Av | (1) 42 sq ft bathroom remodel on 3rd floor in kind. no structural, no changes to walls or openings. replace existing with (n) curbed shower, toilet bidet, and vanity. all (n) fixtures and finishes.Details
(1) 42 sq ft bathroom remodel on 3rd floor in kind. no structural, no changes to walls or openings. replace existing with (n) curbed shower, toilet bidet, and vanity. all (n) fixtures and finishes. | $14,500 |
| Dec 1, 2022 | Completed final sign-off May 2023 | 5 Carpenter Ct | 2/f: (1) 58 sq. ft. primary bath remodel, no structural, no changes to walls or openings, replace (e) w/new curbed shower, toilet bidet, & double vanity. all new fixtures/finishesDetails
2/f: (1) 58 sq. ft. primary bath remodel, no structural, no changes to walls or openings, replace (e) w/new curbed shower, toilet bidet, & double vanity. all new fixtures/finishes | $14,500 |
| Oct 17, 2022 | Completed final sign-off Jun 2023 | 6324 California St | 2 bathroom remodels in kind. no structural/no change to walls or openings. bath a: 67 sq f master bath on 3rd floor. replace extg with new soaking tub curbed shower, toilet vanity. bath b: 43 sq ft guest bath on 3rd floor. replace extg with new curbed shower, vanity and toilet. all nw fixtures fnshDetails
2 bathroom remodels in kind. no structural/no change to walls or openings. bath a: 67 sq f master bath on 3rd floor. replace extg with new soaking tub curbed shower, toilet vanity. bath b: 43 sq ft guest bath on 3rd floor. replace extg with new curbed shower, vanity and toilet. all nw fixtures fnsh | $14,500 |
| Jun 1, 2022 | Never finaled issued Jun 2022, no final | 50 Rockwood Ct | adding small window to the side of the house, 31.75in x 15.75. at the lowest level at the right side of the building. u-factor 0.3 maximum.Details
adding small window to the side of the house, 31.75in x 15.75. at the lowest level at the right side of the building. u-factor 0.3 maximum. | $800 |