Mark G Foti Building & Design Inc
- Based in
- Woodside
- On San Francisco permits
- Oct 2020 to Oct 2020
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 28, 2020 | Never finaled issued Oct 2020, no final | 5415 Mission St | pest report req for sale of prop: repair upper landing.demo illegal shed structure, r/r upper stringer & paint. add 2x6 joist to bridge walkway, r/r 6x6 post.pest report to be reviewed by field inspector.Details
pest report req for sale of prop: repair upper landing.demo illegal shed structure, r/r upper stringer & paint. add 2x6 joist to bridge walkway, r/r 6x6 post.pest report to be reviewed by field inspector. | $12,000 |