Marina Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2019 to Dec 2025
- Last 24 months
- 1 permit filed
13 permits since 2000: 12 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 15, 2025 | In progress issued Dec 2025 | 401 Orizaba Av | re-configure (e) bathroom to 2 bathrooms; convert existing garage to bedroom; 3rd fl - add new full bathDetails
re-configure (e) bathroom to 2 bathrooms; convert existing garage to bedroom; 3rd fl - add new full bath | $60,000 |
| May 22, 2024 | Completed final sign-off Oct 2024 | 1038 Clement St | remove business sign. patch all holesDetails
remove business sign. patch all holes | |
| Nov 1, 2023 | Completed final sign-off Nov 2024 | 6150 Geary Bl | to comply with abe #201902135181. add an automatic door operator at store entrance door. bar only.Details
to comply with abe #201902135181. add an automatic door operator at store entrance door. bar only. | $3,500 |
| Jul 5, 2023 | Completed final sign-off Sep 2023 | 901 Powell St | kitchen: replace cabinets, countertop, kitchen plumbing fixtures in kind, add hood exhuast vent, reconfigure patio doors. add refrigerator circuit, 240v oven circuit, refrigerator ice maker line. paint. no structural demo. terminate 3' from pl & openings into the bldg, not discharge public walkway.Details
kitchen: replace cabinets, countertop, kitchen plumbing fixtures in kind, add hood exhuast vent, reconfigure patio doors. add refrigerator circuit, 240v oven circuit, refrigerator ice maker line. paint. no structural demo. terminate 3' from pl & openings into the bldg, not discharge public walkway. | $30,000 |
| Mar 9, 2023 | Completed final sign-off May 2023 | 875 La Playa | revision to permit# 202301190373: replace kitchen cabinets; kitchen sink; kitchen faucet; countertop. electrical: move subpanel from hallway closet to hallway wall. revision to permit 202301190373.Details
revision to permit# 202301190373: replace kitchen cabinets; kitchen sink; kitchen faucet; countertop. electrical: move subpanel from hallway closet to hallway wall. revision to permit 202301190373. | $36,000 |
| Jan 19, 2023 | Completed final sign-off May 2023 | 875 La Playa | unit 474: remodel hallway and master bathrooms: replace ceiling, vanity wall, lights, ventilation fans, bathtub, shower pan, toilets, wall and floor tiles. (two bathrooms total). in kind remodelDetails
unit 474: remodel hallway and master bathrooms: replace ceiling, vanity wall, lights, ventilation fans, bathtub, shower pan, toilets, wall and floor tiles. (two bathrooms total). in kind remodel | $30,000 |
| Nov 23, 2021 | Completed final sign-off Dec 2021 | 1242 Taylor St | unit 4 and 6: replace 2 bathroom vinyl windows in existing lightwell. non visible from street. non hazardous locations. u-factor<0.58Details
unit 4 and 6: replace 2 bathroom vinyl windows in existing lightwell. non visible from street. non hazardous locations. u-factor<0.58 | $2,000 |
| Jul 23, 2021 | Completed final sign-off Dec 2021 | 1242 Taylor St | unit #6: remodel bathroom and repair dryrot, no alteration wall, windows and door.Details
unit #6: remodel bathroom and repair dryrot, no alteration wall, windows and door. | $25,000 |
| Jul 23, 2021 | Completed final sign-off Dec 2021 | 1242 Taylor St | unit #4: remodel bathroom and repair dryrot. no alteration of wall, window & door.Details
unit #4: remodel bathroom and repair dryrot. no alteration of wall, window & door. | $20,000 |
| Sep 21, 2020 | Completed final sign-off Sep 2021 | 518 21st Av | remodel bathbroom and wet batr in family room. instal recessed light in all rooms and hallway on 1/f. install drywall and insulation. no change to (e) floor plan.Details
remodel bathbroom and wet batr in family room. instal recessed light in all rooms and hallway on 1/f. install drywall and insulation. no change to (e) floor plan. | $20,000 |
| Jul 6, 2020 | Completed final sign-off Mar 2024 | 4644 Geary Bl | compliance per items as listed in the mandatory disability access improvement program category checklist compliance form on page 7 for the proposed barrier remediation at store entrance. add a new unisex ada restroom and modify (e) laundry room.Details
compliance per items as listed in the mandatory disability access improvement program category checklist compliance form on page 7 for the proposed barrier remediation at store entrance. add a new unisex ada restroom and modify (e) laundry room. | $15,000 |
| Apr 18, 2019 | Completed final sign-off Jan 2021 | 518 21st Av | remodel kitchen and 2 bathrooms, install recessed lighting in all rooms, install insulation, no change to (e) floor planDetails
remodel kitchen and 2 bathrooms, install recessed lighting in all rooms, install insulation, no change to (e) floor plan | $38,000 |
| Mar 28, 2019 | Completed final sign-off Mar 2021 | 518 21st Av | retrofit for wall removal, remove (e) fireplace. convert hallway closet to laundry room on unit 518.Details
retrofit for wall removal, remove (e) fireplace. convert hallway closet to laundry room on unit 518. | $5,000 |