Marcus Aurelius Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Sep 2011
- Last 24 months
- 0 permits filed
9 permits since 2000: 8 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 21, 2011 | Completed final sign-off Sep 2011 | 3861 19th St | to comply w/ physical inspection report #cc-5967, including handrail inspection.Details
to comply w/ physical inspection report #cc-5967, including handrail inspection. | |
| Dec 15, 2009 | Completed final sign-off Dec 2009 | 1829 Fulton St | to comply with physical inspection application cc-5561 and legalize cabinets and remove sink in workshop.Details
to comply with physical inspection application cc-5561 and legalize cabinets and remove sink in workshop. | $3,000 |
| Jan 2, 2009 | Completed final sign-off Feb 2009 | 3861 19th St | replace present whirlpool with shower/retile, bring 220v circuit for laundry.Details
replace present whirlpool with shower/retile, bring 220v circuit for laundry. | $8,000 |
| Apr 2, 2002 | Completed final sign-off Aug 2002 | 280 Beacon St | replace decking boards and handrail on 2 decks approx 250 s.f.Details
replace decking boards and handrail on 2 decks approx 250 s.f. | $2,500 |
| Mar 26, 2002 | Completed final sign-off Jun 2002 | 2299 Sacramento St | remove tile from bathroom/replace tile, remove pedestal sink and toilet, replace in same locationDetails
remove tile from bathroom/replace tile, remove pedestal sink and toilet, replace in same location | $2,000 |
| May 7, 2001 | Completed final sign-off Aug 2001 | 2299 Sacramento St | kitchen & bath remodel;add 2 closets for 2 bedrms;new flrs floating floorDetails
kitchen & bath remodel;add 2 closets for 2 bedrms;new flrs floating floor | $26,000 |
| Mar 23, 2001 | Expired or cancelled expired Dec 2001 | 535 Steiner St | replace (e) bathroom as ahown in plansDetails
replace (e) bathroom as ahown in plans | $14,000 |
| Jun 2, 2000 | Completed final sign-off Jul 2000 | 352 Corbett Av | demo of extg deckDetails
demo of extg deck | $7,850 |
| Feb 22, 2000 | Completed final sign-off Jun 2000 | 2230 Pacific Av | remove and install new ceramic title floor in lobby, linoleum in laundry roomDetails
remove and install new ceramic title floor in lobby, linoleum in laundry room |