Marcos Leon Construction,Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2014 to May 2019
- Last 24 months
- 0 permits filed
46 permits since 2000: 28 completed, 12 never finaled, 6 expired or cancelled.
Of the 12 never-finaled permits, 12 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 3, 2019 | Completed final sign-off Feb 2022 | 288 Union St | unti 1: kitchen and bathroom remodel. kitchen: 128 sqft. bathroom: 84 sqft. kitchen: demo amd replace all cabinets. replace electrical range to gas. add (4) outlets. replace sink and faucet. bathroom: demolish bathtub and replace with shower only. new shower pan.Details
unti 1: kitchen and bathroom remodel. kitchen: 128 sqft. bathroom: 84 sqft. kitchen: demo amd replace all cabinets. replace electrical range to gas. add (4) outlets. replace sink and faucet. bathroom: demolish bathtub and replace with shower only. new shower pan. | $15,000 |
| Jun 2, 2017 | Completed final sign-off Dec 2017 | 554 Rockdale Dr | (title 24 for newly installed windows permit 201704214516, roof 201701308177) new plumbing, elec, hvac, refinish floors, remodel e bath and kitchen. gr fl: convert multi use rm to large mster bdrm, walk in closet. new w/d closet, new sw bdrm w closet, n furn and wh closet, 1/2 bath to full, n closetDetails
(title 24 for newly installed windows permit 201704214516, roof 201701308177) new plumbing, elec, hvac, refinish floors, remodel e bath and kitchen. gr fl: convert multi use rm to large mster bdrm, walk in closet. new w/d closet, new sw bdrm w closet, n furn and wh closet, 1/2 bath to full, n closet | $120,000 |
| Nov 29, 2016 | Completed final sign-off May 2020 | 551 37th Av | add to kitchen/bath permit 201609228590, add concrete walkway, reconfig rear stair. 2nd fl:raise roof w kitchen popout, move dbrm doors, gas fireplc, plumb,elec,hvac, n vinyls windows, refinish flrs, widen opening ktich/lvrm rm.1st fl:raise ceiling,n bedrm,family rm,storage,2 full bath,grade beam,Details
add to kitchen/bath permit 201609228590, add concrete walkway, reconfig rear stair. 2nd fl:raise roof w kitchen popout, move dbrm doors, gas fireplc, plumb,elec,hvac, n vinyls windows, refinish flrs, widen opening ktich/lvrm rm.1st fl:raise ceiling,n bedrm,family rm,storage,2 full bath,grade beam, | $275,000 |
| Oct 31, 2016 | Completed final sign-off Feb 2017 | 133 Putnam St | kitchen and bathroom remodel; new rear deck and stairs. see plansDetails
kitchen and bathroom remodel; new rear deck and stairs. see plans | $110,000 |
| Sep 22, 2016 | Completed final sign-off May 2020 | 551 37th Av | kitchen & bathroom remodel: replace cabinets, sheet rock, counter tops, flooring, tile toilet tub & sink, electrical bring up to code, plumbing: p traps & hook up sink/ toilet tub faucet. no walls to be altered.Details
kitchen & bathroom remodel: replace cabinets, sheet rock, counter tops, flooring, tile toilet tub & sink, electrical bring up to code, plumbing: p traps & hook up sink/ toilet tub faucet. no walls to be altered. | $25,000 |
| Sep 12, 2016 | Expired or cancelled suspend May 2017 | 233 09th Av | violation complaint #201633491, remove corrugated plastic roof with 5/8 plywood as requred by inspector.Details
violation complaint #201633491, remove corrugated plastic roof with 5/8 plywood as requred by inspector. | $800 |
| Sep 12, 2016 | Completed final sign-off Sep 2016 | 35 Lake St | voluntary bolt house to foundation 5/8 all thead 8" deep/ epoxy, 3"x3"x1/4" square washer & nut @48" max o.c.Details
voluntary bolt house to foundation 5/8 all thead 8" deep/ epoxy, 3"x3"x1/4" square washer & nut @48" max o.c. | $7,500 |
| Sep 7, 2016 | Completed final sign-off Jun 2021 | 63 Stoneyford Av | horizontal addition of two bedrooms at 1st level,add'l living spaces at 2nd level, new connecting stair, existing ground level rooms to be reconfigured on a new slab, new deck to be built on roof of the new 1st level with access from second level.Details
horizontal addition of two bedrooms at 1st level,add'l living spaces at 2nd level, new connecting stair, existing ground level rooms to be reconfigured on a new slab, new deck to be built on roof of the new 1st level with access from second level. | $175,000 |
| Jun 23, 2016 | Completed final sign-off Aug 2016 | 1874 11th Av | bathroom remodel - gut to bare studs/upgrade plumbing & electrical to current codes/sheetrock/tile/replace all fixtures, toilet/tub/vanity/sink/shower, approx 54 sf.Details
bathroom remodel - gut to bare studs/upgrade plumbing & electrical to current codes/sheetrock/tile/replace all fixtures, toilet/tub/vanity/sink/shower, approx 54 sf. | $16,000 |
| Jun 23, 2016 | Completed final sign-off Jul 2016 | 3011 24th St | to comply with nov# 201694622. partial roof repair due to fallen tree, repair ponywall, approx 10 lf. replace broken clay roof tiles, approx 15 lf.Details
to comply with nov# 201694622. partial roof repair due to fallen tree, repair ponywall, approx 10 lf. replace broken clay roof tiles, approx 15 lf. | $4,000 |
| Jun 8, 2016 | Expired or cancelled suspend May 2017 | 617 Gennessee St | replace damaged ledger/beam/joists, deck material from wood to composite, widen (e) opening below deck to 3'& add door, add (n) door on same axis as basement opening. front stairs: replace dryrot wood handrail w/exterior grade wood, widen stairs, relocate electrical panelDetails
replace damaged ledger/beam/joists, deck material from wood to composite, widen (e) opening below deck to 3'& add door, add (n) door on same axis as basement opening. front stairs: replace dryrot wood handrail w/exterior grade wood, widen stairs, relocate electrical panel | $20,000 |
| Jun 7, 2016 | Completed final sign-off Jun 2016 | 2237 Polk St | reroofingDetails
reroofing | $18,000 |
| Dec 16, 2015 | Completed final sign-off Dec 2015 | 2612 Folsom St | reroofingDetails
reroofing | $7,000 |
| Dec 10, 2015 | Expired or cancelled expired Aug 2019 | 1218 46th Av | 1) preservation of earthquake cottages, restoring of (e)finishes by patching & repairing (e)stucco 2)renovation of (e) earthquake cottage extension, which would reduce (e) footprint of residence by 8'7" to the 45% rear yard line 3) 2 story verticle addition (2 bedrms) in (e) footprint of rear yardDetails
1) preservation of earthquake cottages, restoring of (e)finishes by patching & repairing (e)stucco 2)renovation of (e) earthquake cottage extension, which would reduce (e) footprint of residence by 8'7" to the 45% rear yard line 3) 2 story verticle addition (2 bedrms) in (e) footprint of rear yard | $350,000 |
| Dec 9, 2015 | Never finaled issued Dec 2015, no final | 2736 44th Av | reroofing.Details
reroofing. | $8,000 |
| Nov 30, 2015 | Completed final sign-off Mar 2016 | 1374 35th Av | basement bath repairs(remodel) due to sewage leak. studio floor repair, light framing(suffit for foundation)Details
basement bath repairs(remodel) due to sewage leak. studio floor repair, light framing(suffit for foundation) | $25,000 |
| Nov 10, 2015 | Completed final sign-off Jan 2016 | 63 Parnassus Av | reroof with composition shingles of a gable roof with no change to existing roof form due to dry-rotDetails
reroof with composition shingles of a gable roof with no change to existing roof form due to dry-rot | $13,000 |
| Oct 20, 2015 | Never finaled issued Oct 2015, no final | 688 Haight St | reroofingDetails
reroofing | $10,000 |
| Oct 16, 2015 | Completed final sign-off Nov 2015 | 1501 Powell St | replace/repair dry rot in backstairs- 3 stories, stringers and steps.Details
replace/repair dry rot in backstairs- 3 stories, stringers and steps. | $5,000 |
| Oct 9, 2015 | Never finaled issued Oct 2015, no final | 295 28th St | re-roofingDetails
re-roofing | $13,000 |
| Oct 9, 2015 | Never finaled issued Oct 2015, no final | 1294 Potrero Av | re-roofingDetails
re-roofing | $8,000 |
| Oct 6, 2015 | Completed final sign-off Aug 2016 | 447 Laidley St | revision to pa 2015 0820 4874: add n rooms to the grnd flr.- bedrm, family rm and full bathrm. lower foundation under n rooms to create 7'-6" ceiling ht, add n furnace; replace columns & beams and add a grade beam. 2 n windows on grn flr. demo rear door. rear stair more than 50% damage-repair inkindDetails
revision to pa 2015 0820 4874: add n rooms to the grnd flr.- bedrm, family rm and full bathrm. lower foundation under n rooms to create 7'-6" ceiling ht, add n furnace; replace columns & beams and add a grade beam. 2 n windows on grn flr. demo rear door. rear stair more than 50% damage-repair inkind | $80,000 |
| Oct 6, 2015 | Expired or cancelled expired Dec 2024 | 2612 Folsom St | revision to 201507292828: rebuild rear stairwell to comply w/nov #201526161. rebuild wood fire escape on sw side of property to comply w/#4 of nov #201545851 (plan provided) & items #1,2,3,5 (no plan needed). nov #201556241 items #1 - 15 for repaird (no plan needed).Details
revision to 201507292828: rebuild rear stairwell to comply w/nov #201526161. rebuild wood fire escape on sw side of property to comply w/#4 of nov #201545851 (plan provided) & items #1,2,3,5 (no plan needed). nov #201556241 items #1 - 15 for repaird (no plan needed). | $10,000 |
| Sep 25, 2015 | Never finaled issued Sep 2015, no final | 622 Huron Av | reroofingDetails
reroofing | $5,500 |
| Sep 15, 2015 | Never finaled issued Sep 2015, no final | 2612 Folsom St | reroofingDetails
reroofing | $11,500 |
| Aug 20, 2015 | Completed final sign-off Mar 2016 | 447 Laidley St | kitchen & bath remodel-demo kitchens & bath to stud-upgrade plumbing & electrical to code(title 24). replace all plumbing fixitures, toilet, tub, & sinks(2). new cabinets & countertops(tile). replace 3 windows; 2 at back and 1 at front. front window(existing aluminum), to be replaced with wood clad.Details
kitchen & bath remodel-demo kitchens & bath to stud-upgrade plumbing & electrical to code(title 24). replace all plumbing fixitures, toilet, tub, & sinks(2). new cabinets & countertops(tile). replace 3 windows; 2 at back and 1 at front. front window(existing aluminum), to be replaced with wood clad. | $45,000 |
| Jul 31, 2015 | Completed final sign-off Aug 2015 | 2533 Noriega St | repair store front due to car damage. replace studs-framing glass window. stucco repair. interior drywall and plaster to match in kind. paint. repair in kind.Details
repair store front due to car damage. replace studs-framing glass window. stucco repair. interior drywall and plaster to match in kind. paint. repair in kind. | $9,200 |
| Jul 22, 2015 | Completed final sign-off Nov 2015 | 1077 Natoma St | unit 6 - remodel kitchen and bath - partial opening at non-bearing for kitchen counter; to comply with cec150.0(k)3 & 5Details
unit 6 - remodel kitchen and bath - partial opening at non-bearing for kitchen counter; to comply with cec150.0(k)3 & 5 | $52,000 |
| Jul 10, 2015 | Expired or cancelled expired Aug 2019 | 2138 Vallejo St | remodel two bathrooms & one bedroom: work includes tear out dry wall finishes, upgrade electrical & plumbimg, insulate wall. replace two windows in-kind with u-factor not to exceed 0.32 at side not visible from street. no new wall and no existing wall relocation.Details
remodel two bathrooms & one bedroom: work includes tear out dry wall finishes, upgrade electrical & plumbimg, insulate wall. replace two windows in-kind with u-factor not to exceed 0.32 at side not visible from street. no new wall and no existing wall relocation. | $25,000 |
| Jun 11, 2015 | Never finaled issued Jun 2015, no final | 785 Broadway | reroofingDetails
reroofing | $10,000 |
| May 19, 2015 | Completed final sign-off May 2015 | 254 09th Av | revision to app#201502249240. revise detail detail 31/a3.3 to show pc 6616 post cap and show beam as extg not new.Details
revision to app#201502249240. revise detail detail 31/a3.3 to show pc 6616 post cap and show beam as extg not new. | |
| Apr 17, 2015 | Completed final sign-off Dec 2015 | 3036 Webster St | lower unit: kitchen & bath remodel. kithcen - new cabinets & floors, upgrade ele, new drywall. remove non-bearing wall. bath - remove (e) bathtub, replace with shower, move plumbing for toilet & shower. upgrade elect throughout entire apt.Details
lower unit: kitchen & bath remodel. kithcen - new cabinets & floors, upgrade ele, new drywall. remove non-bearing wall. bath - remove (e) bathtub, replace with shower, move plumbing for toilet & shower. upgrade elect throughout entire apt. | $50,000 |
| Mar 20, 2015 | Completed final sign-off May 2015 | 254 09th Av | revision appl. #2015.0225.9276. to document (e) condittion with no toilet in the existing bathroom on each floor per plan shown; no work to be done under this permitDetails
revision appl. #2015.0225.9276. to document (e) condittion with no toilet in the existing bathroom on each floor per plan shown; no work to be done under this permit | |
| Mar 13, 2015 | Never finaled issued Mar 2015, no final | 7 Jakey Ct | reroofingDetails
reroofing | $7,000 |
| Mar 9, 2015 | Never finaled issued Mar 2015, no final | 2134 Vallejo St | to comply with physical inspections report #cc-7822 item 1 & 2 condo conversion of unit 2134 remove toilet & sink in unit 2134 - return to closetDetails
to comply with physical inspections report #cc-7822 item 1 & 2 condo conversion of unit 2134 remove toilet & sink in unit 2134 - return to closet | $800 |
| Mar 5, 2015 | Never finaled issued Mar 2015, no final | 2959 Folsom St | re-roofingDetails
re-roofing | $8,000 |
| Feb 25, 2015 | Completed final sign-off May 2015 | 254 09th Av | to comply with physical inspection report # cc-7899Details
to comply with physical inspection report # cc-7899 | $500 |
| Feb 24, 2015 | Completed final sign-off May 2015 | 254 09th Av | add four 6x6 posts and beam to garage, remove and replace with asphalt roof and reconfigure walls at light well. correct report #cc-7899 item #1Details
add four 6x6 posts and beam to garage, remove and replace with asphalt roof and reconfigure walls at light well. correct report #cc-7899 item #1 | $9,000 |
| Feb 18, 2015 | Completed final sign-off Apr 2015 | 2134 Vallejo St | to comply with physical inspection report #cc-7822Details
to comply with physical inspection report #cc-7822 | $15,000 |
| Jan 5, 2015 | Completed final sign-off Jan 2015 | 233 09th Av | reroofingDetails
reroofing | $10,000 |
| Dec 26, 2014 | Never finaled issued Dec 2014, no final | 230 Molimo Dr | reroofingDetails
reroofing | $3,200 |
| Dec 16, 2014 | Never finaled issued Jan 2015, no final | 1362 Powell St | comply with nov. 201485831 item #2: repair/rebuild wood stairs in the rear of the building in kind.Details
comply with nov. 201485831 item #2: repair/rebuild wood stairs in the rear of the building in kind. | $25,000 |
| Nov 20, 2014 | Completed final sign-off Jan 2015 | 233 09th Av | demo roof deck. in order to comply with violation#200727037 (work without permit).Details
demo roof deck. in order to comply with violation#200727037 (work without permit). | $800 |
| Oct 24, 2014 | Completed final sign-off Dec 2014 | 453 Marietta Dr | one bathroom remodeling, one new window on the same wall, same location, not facing the street (court yard). max u factor is 0.32Details
one bathroom remodeling, one new window on the same wall, same location, not facing the street (court yard). max u factor is 0.32 | $15,000 |
| Sep 30, 2014 | Completed final sign-off Oct 2014 | 1523 Irving St | reroofingDetails
reroofing | $8,000 |
| Aug 1, 2014 | Expired or cancelled expired Dec 2018 | 3828 26th St | remove (e) metal handrail on entire staircase - street to main entry & replace w/ 1-3/4" square ballisters & newel posts. replace exterior wooden staircase & match (e) treads & risers. waterproof stairway t&g landing.Details
remove (e) metal handrail on entire staircase - street to main entry & replace w/ 1-3/4" square ballisters & newel posts. replace exterior wooden staircase & match (e) treads & risers. waterproof stairway t&g landing. | $21,000 |