Manscaping
- Based in
- San Francisco
- On San Francisco permits
- May 2013 to Mar 2024
- Last 24 months
- 0 permits filed
7 permits since 2000: 4 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 20, 2024 | Completed final sign-off Apr 2024 | 525 Ortega St | rev to pa 202401264779: correct the lans to show stairs in wall.Details
rev to pa 202401264779: correct the lans to show stairs in wall. | |
| Jan 26, 2024 | Completed final sign-off Apr 2024 | 525 Ortega St | retaining wall on slope > 25%Details
retaining wall on slope > 25% | $30,000 |
| Nov 1, 2016 | Completed final sign-off Nov 2016 | 256 Glenview Dr | construction of versa-lock block retaining wall at backyard of property roughly 19.5' behind homeDetails
construction of versa-lock block retaining wall at backyard of property roughly 19.5' behind home | $8,000 |
| Sep 12, 2016 | Never finaled issued Sep 2016, no final | 256 Glenview Dr | partial foundation underpinning of the existing two story residence. the specific underpinning includes the addition of six underpinning pads at the south side of the two story residence.Details
partial foundation underpinning of the existing two story residence. the specific underpinning includes the addition of six underpinning pads at the south side of the two story residence. | $15,000 |
| Jun 10, 2016 | Never finaled issued Jun 2016, no final | 1635 Castro St | construction of new keystone retaining wall at back of property. no greater than 9' tallDetails
construction of new keystone retaining wall at back of property. no greater than 9' tall | $15,000 |
| Aug 18, 2015 | Completed final sign-off Jul 2017 | 75 Clipper St | replace (e) deck, (n) conc slab below deck, (n) bi folding patio doors; maher n/aDetails
replace (e) deck, (n) conc slab below deck, (n) bi folding patio doors; maher n/a | $40,000 |
| May 2, 2013 | Never finaled issued May 2013, no final | 3337 Broderick St | replace backyard face. 100.5 total linear feet and 8 feet tall. posts, fence boards, trellis, etc. the fence will be at the rear and side lot lines at the rear of the property. there will be 10'x4"x4" structural posts every 8' with 2' feet of the post set in concrete piers that are 24" deep andDetails
replace backyard face. 100.5 total linear feet and 8 feet tall. posts, fence boards, trellis, etc. the fence will be at the rear and side lot lines at the rear of the property. there will be 10'x4"x4" structural posts every 8' with 2' feet of the post set in concrete piers that are 24" deep and | $3,000 |