Makai Solutions
- Based in
- Gardena
- On San Francisco permits
- Jun 2017 to Nov 2020
- Last 24 months
- 0 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 4, 2020 | Completed final sign-off Apr 2021 | 901 Presidio Av | revision to existing structural drawings s-02,s-02 for existing pa# 2017-0822-5568. structural drawings specific to designed lift foundations submitted to replace s-02,s-04. engineered drawings s1.0,s2.0,s3.0 constitutes the revision.Details
revision to existing structural drawings s-02,s-02 for existing pa# 2017-0822-5568. structural drawings specific to designed lift foundations submitted to replace s-02,s-04. engineered drawings s1.0,s2.0,s3.0 constitutes the revision. | |
| Sep 15, 2017 | Completed final sign-off May 2019 | 1301 Cesar Chavez St | replace underground diesel piping in kind. remove section of and replumb above ground diesel pipe. yes for maher ordinance.Details
replace underground diesel piping in kind. remove section of and replumb above ground diesel pipe. yes for maher ordinance. | $200,000 |
| Aug 22, 2017 | Completed final sign-off Apr 2021 | 901 Presidio Av | replacement of overhead rollup doors, replacement of bus lifts, replacement of swing gatesDetails
replacement of overhead rollup doors, replacement of bus lifts, replacement of swing gates | $2,500,000 |
| Jun 7, 2017 | Completed final sign-off Sep 2018 | 1301 Cesar Chavez St | install (4) underground oil tanks, install (2) above ground oil/coolant tanks.Details
install (4) underground oil tanks, install (2) above ground oil/coolant tanks. | $160,000 |