Magic Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2003 to Apr 2015
- Last 24 months
- 0 permits filed
39 permits since 2000: 36 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 2, 2015 | Completed final sign-off May 2015 | 2542 Sacramento St | remodeling existing kitchen (new cabinets countertop, faucet, appliances) update electrical panel unit 101Details
remodeling existing kitchen (new cabinets countertop, faucet, appliances) update electrical panel unit 101 | $9,850 |
| Nov 4, 2014 | Completed final sign-off Mar 2015 | 5546 Anza St | remodeling kitchen and 2.5 bathrooms, new lighting, appliances, cabinets, plumbing fixturesDetails
remodeling kitchen and 2.5 bathrooms, new lighting, appliances, cabinets, plumbing fixtures | $43,500 |
| Aug 21, 2013 | Completed final sign-off Dec 2013 | 1942 16th Av | remodeling of 2 bathrooms (new plumbing, electrical, tile) no alteration of partition wallDetails
remodeling of 2 bathrooms (new plumbing, electrical, tile) no alteration of partition wall | $16,970 |
| Apr 19, 2012 | Completed final sign-off May 2012 | 253 Gold Mine Dr | repair dryrot in front of the house less than 50%, change 5 window in front of house, u-factor = 0.4 max, repair in kind.Details
repair dryrot in front of the house less than 50%, change 5 window in front of house, u-factor = 0.4 max, repair in kind. | $10,400 |
| Jun 15, 2011 | Completed final sign-off Sep 2011 | 933 Teresita Bl | kitchen remodeling (new cabinets, sink, faucet, counter top, dw, ga) recess lights fluorescent all in kindDetails
kitchen remodeling (new cabinets, sink, faucet, counter top, dw, ga) recess lights fluorescent all in kind | $10,315 |
| Feb 16, 2011 | Completed final sign-off May 2011 | 964 Minnesota St | remodeling 1 1/2 bathrooms (new tub, vanity, toilets, tile) pen lights, no walls to be removedDetails
remodeling 1 1/2 bathrooms (new tub, vanity, toilets, tile) pen lights, no walls to be removed | $19,700 |
| Jan 19, 2011 | Completed final sign-off Feb 2011 | 2770 19th Av | kitchen remodelling: installation of new cabinets, counter top, applicances, faucet, hood, range & dishwasher. install at least 50% of high efficacy lighting (by wattage). no wall relocation.Details
kitchen remodelling: installation of new cabinets, counter top, applicances, faucet, hood, range & dishwasher. install at least 50% of high efficacy lighting (by wattage). no wall relocation. | $11,000 |
| Aug 27, 2010 | Completed final sign-off Dec 2010 | 933 Teresita Bl | removal of (e) lightwell (infill), remodeling of (e) bathrooms at the 2nd floor, installation a new skylights at bathrooms (1 & 2)Details
removal of (e) lightwell (infill), remodeling of (e) bathrooms at the 2nd floor, installation a new skylights at bathrooms (1 & 2) | $23,000 |
| Jun 14, 2010 | Completed final sign-off Oct 2010 | 2342 26th Av | remodeling of the (e) kitchen. remodeling of the (e) bathroom @ the second flr. addition of the (n) bathroom @ the second flr. opening @ the wall separating living & breakfast rooms.Details
remodeling of the (e) kitchen. remodeling of the (e) bathroom @ the second flr. addition of the (n) bathroom @ the second flr. opening @ the wall separating living & breakfast rooms. | $21,000 |
| Sep 28, 2009 | Completed final sign-off Dec 2009 | 1571 33rd Av | remodel bathroom on the top floor: new vanity, faucet, shower, tile.Details
remodel bathroom on the top floor: new vanity, faucet, shower, tile. | $9,530 |
| Jul 22, 2009 | Completed final sign-off Jan 2010 | 1686 Mcallister St | remodeling 2 bathrooms (new tabs, plumbing fixtures, vanity, tile no walls to be removed provide high efficiency light or manual on occupancy sensor no doors walls windows under this appln. life safety under separate permitDetails
remodeling 2 bathrooms (new tabs, plumbing fixtures, vanity, tile no walls to be removed provide high efficiency light or manual on occupancy sensor no doors walls windows under this appln. life safety under separate permit | $23,600 |
| Jul 6, 2009 | Completed final sign-off Aug 2009 | 4437 Kirkham St | bathroom remodeling on main floor (new tub, vanity, shower, plumbing fixtures, light fixtures on occupant sensor & tile).Details
bathroom remodeling on main floor (new tub, vanity, shower, plumbing fixtures, light fixtures on occupant sensor & tile). | $13,600 |
| Apr 21, 2009 | Completed final sign-off May 2009 | 1686 Mcallister St | at garage ceiling repair all openings, cover access opening to crawl space in garage, smoke detectors at stairs. renovate exterior wood utility ladder located at rear exterior of bldg. conform roof access and smoke alarm located. nov complaint #200989340 and 200993400Details
at garage ceiling repair all openings, cover access opening to crawl space in garage, smoke detectors at stairs. renovate exterior wood utility ladder located at rear exterior of bldg. conform roof access and smoke alarm located. nov complaint #200989340 and 200993400 | $1,520 |
| Feb 3, 2009 | Completed final sign-off Apr 2009 | 1452 24th Av | 1 1/2 bathroom remodel. new toilet, faucet, cabinet, tub, tile. new lighting. no walls to be removed. provide fluorescent lights or "manual on" occupancy sensor.Details
1 1/2 bathroom remodel. new toilet, faucet, cabinet, tub, tile. new lighting. no walls to be removed. provide fluorescent lights or "manual on" occupancy sensor. | $13,200 |
| Jan 5, 2009 | Completed final sign-off Apr 2009 | 76 Meadowbrook Dr | remodel bathroom ground floor. new toilet, cabinet, tile, plumbing fixtures. fan. no walls to be removed. all non structural.Details
remodel bathroom ground floor. new toilet, cabinet, tile, plumbing fixtures. fan. no walls to be removed. all non structural. | $9,000 |
| Oct 20, 2008 | Completed final sign-off Oct 2009 | 2100 43rd Av | to start complete work approved under pa#200710115156.Details
to start complete work approved under pa#200710115156. | $6,400 |
| Oct 16, 2008 | Completed final sign-off Dec 2008 | 1264 02nd Av | work @ unit# 3 only. kitchen & bathroom remodel. (no cabinets) faucet, dishwasher, bathtub, tile, vanity, light fixtures to be fluorescent or on occupancy sensor. no structural. room size for kitchen 8' x 8'.Details
work @ unit# 3 only. kitchen & bathroom remodel. (no cabinets) faucet, dishwasher, bathtub, tile, vanity, light fixtures to be fluorescent or on occupancy sensor. no structural. room size for kitchen 8' x 8'. | $22,940 |
| Jul 23, 2008 | Completed final sign-off Sep 2008 | 1335 Willard St | bathroom remodel (new tile, fausets, toob, toilet, vanity) lights fixtures to be florescent or on occupancy sensor. no doors, windows, walls to be removed.Details
bathroom remodel (new tile, fausets, toob, toilet, vanity) lights fixtures to be florescent or on occupancy sensor. no doors, windows, walls to be removed. | $8,890 |
| Jun 16, 2008 | Completed final sign-off Aug 2008 | 1582 32nd Av | remodel 1 1/2 bathrooms on main level. new tile, faucets, tub, vanity, lich & fixtures. to be florescent or on occupant sensor. no structural. no windows or door.Details
remodel 1 1/2 bathrooms on main level. new tile, faucets, tub, vanity, lich & fixtures. to be florescent or on occupant sensor. no structural. no windows or door. | $8,900 |
| Oct 11, 2007 | Never finaled issued Oct 2007, no final | 2100 43rd Av | bathroom remodeling new foset, tub,new tile and vanity. light fixtures to be fluorescent or on occupant sensor. no structuralDetails
bathroom remodeling new foset, tub,new tile and vanity. light fixtures to be fluorescent or on occupant sensor. no structural | $6,400 |
| Sep 17, 2007 | Completed final sign-off Dec 2007 | 200 Yerba Buena Av | kitchen remodeling(new cabinets, appliances, reference for dishwasher. all nonstructural. new cbnts, new sink & faucet. plmg and electrical req.Details
kitchen remodeling(new cabinets, appliances, reference for dishwasher. all nonstructural. new cbnts, new sink & faucet. plmg and electrical req. | $10,000 |
| Aug 13, 2007 | Completed final sign-off Oct 2007 | 2627 22nd Av | bathroom remodel- new faucet, tub, tile new vanity. any new lighting to be flourescent.Details
bathroom remodel- new faucet, tub, tile new vanity. any new lighting to be flourescent. | $6,400 |
| Mar 22, 2007 | Completed final sign-off May 2007 | 1686 Mcallister St | kitchen remodel. new cabinets, appliances, countertop, floor. new light fixtures. (no door & no window work on this permit)Details
kitchen remodel. new cabinets, appliances, countertop, floor. new light fixtures. (no door & no window work on this permit) | $23,350 |
| Jan 30, 2007 | Completed final sign-off Mar 2007 | 1350 Divisadero St | 1 bath remodel, new cabinets,toilet, tile) no windows or doors in this projectDetails
1 bath remodel, new cabinets,toilet, tile) no windows or doors in this project | $5,700 |
| Jan 16, 2007 | Completed final sign-off Mar 2007 | 1269 02nd Av | work on 1271 02nd ave.kitchen remodeling (new cabinets, counter tops faucet floor). new light fixtures 50% of wattage of fixtures to be flourescant in unit#1271. no structural work.Details
work on 1271 02nd ave.kitchen remodeling (new cabinets, counter tops faucet floor). new light fixtures 50% of wattage of fixtures to be flourescant in unit#1271. no structural work. | $11,350 |
| Sep 1, 2006 | Completed final sign-off Jan 2007 | 1990 24th Av | kitchen and bathroom remodel in kind. new cabinets, sink, faucet. no walls to be removed.Details
kitchen and bathroom remodel in kind. new cabinets, sink, faucet. no walls to be removed. | $13,700 |
| Jun 21, 2006 | Completed final sign-off Oct 2006 | 109 Upland Dr | 1 kitchen remodel (new cabinets, sink, faucet, new countertops). no change in layout. no walls to be removed. new light to be flourecent.Details
1 kitchen remodel (new cabinets, sink, faucet, new countertops). no change in layout. no walls to be removed. new light to be flourecent. | $8,780 |
| Mar 10, 2006 | Never finaled issued Mar 2006, no final | 115 Peralta Av | replacement of two windows in the kitchen area. same size, same location in kind.Details
replacement of two windows in the kitchen area. same size, same location in kind. | $1,000 |
| Feb 23, 2006 | Completed final sign-off Apr 2006 | 115 Peralta Av | kitchen remodeling (new cabinets, sink,faucet, new countertop). no change in layout. no walls to be removed) flourescent lighting, if required. upper unit only.Details
kitchen remodeling (new cabinets, sink,faucet, new countertop). no change in layout. no walls to be removed) flourescent lighting, if required. upper unit only. | $8,980 |
| Aug 23, 2005 | Completed final sign-off Sep 2005 | 2780 19th Av | bathrmremodel tile, fauset, tub. no changes i layout, walls no structuralDetails
bathrmremodel tile, fauset, tub. no changes i layout, walls no structural | $3,750 |
| Jun 20, 2005 | Completed final sign-off Sep 2005 | 2780 19th Av | kitchen & 2 bathrooms remodeling,new cabinets,new counter top.tiling.no change in layout,walls,openiDetails
kitchen & 2 bathrooms remodeling,new cabinets,new counter top.tiling.no change in layout,walls,openi | $19,760 |
| May 5, 2005 | Completed final sign-off Aug 2005 | 1921 Rivera St | kitchen remodel and one new cabinets, appliances and countertopDetails
kitchen remodel and one new cabinets, appliances and countertop | $6,500 |
| Apr 12, 2005 | Completed final sign-off Aug 2005 | 1269 02nd Av | kchn remodel on top floor unit/new countertop/replace 1 kchn wndw not visible frm strtDetails
kchn remodel on top floor unit/new countertop/replace 1 kchn wndw not visible frm strt | $7,600 |
| Feb 1, 2005 | Completed final sign-off Feb 2005 | 708 Junipero Serra Bl | increase job cost from $15,000 to $30,000 for appl#200408030412Details
increase job cost from $15,000 to $30,000 for appl#200408030412 | $15,000 |
| Nov 2, 2004 | Completed final sign-off Nov 2005 | 1581 10th Av | to renew pa 200010264115-two rooms & bathrm on ground flrDetails
to renew pa 200010264115-two rooms & bathrm on ground flr | $14,000 |
| Jun 14, 2004 | Completed final sign-off Sep 2004 | 1741 Eucalyptus Dr | renew 200310157448 for finalDetails
renew 200310157448 for final | |
| Apr 1, 2004 | Never finaled issued Apr 2004, no final | 1581 10th Av | renew expired app #200010264115 to add two rooms and a bathrm on g/f work not started yetDetails
renew expired app #200010264115 to add two rooms and a bathrm on g/f work not started yet | $18,000 |
| Aug 11, 2003 | Completed final sign-off Oct 2003 | 1582 32nd Av | kichen remodeling/install new kchn cabinetry/appliances/tile floor/paintingDetails
kichen remodeling/install new kchn cabinetry/appliances/tile floor/painting | $8,650 |
| Feb 14, 2003 | Completed final sign-off May 2003 | 1921 Rivera St | bathroom remodel-replace bathtub,toilet,vanity sink & vanity cabinet.tiling,painting.no chg in wallDetails
bathroom remodel-replace bathtub,toilet,vanity sink & vanity cabinet.tiling,painting.no chg in wall | $7,700 |