Madson Construction
- Based in
- Orangeville
- On San Francisco permits
- May 2019 to May 2019
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 21, 2019 | Completed final sign-off Aug 2020 | 528 Myra Wy | new wood aluminum clas windows to replace (e) vinyl and wood windows at same location, same size. (n) front door, (n) wood alum clad patio doors & side lt to replace (e) alum patio doors w/ minor reframing. (n) stucco, (n) gutters & downspouts. no addition to area. no change in height.Details
new wood aluminum clas windows to replace (e) vinyl and wood windows at same location, same size. (n) front door, (n) wood alum clad patio doors & side lt to replace (e) alum patio doors w/ minor reframing. (n) stucco, (n) gutters & downspouts. no addition to area. no change in height. | $28,000 |