Permit GraphShortlistSan Francisco building permits since 2000

Madden Construction

Contractor license
416161
State license record
Based in
San Francisco
On San Francisco permits
May 2007 to Oct 2007
Last 24 months
0 permits filed

2 permits since 2000: 1 completed, 1 never finaled.

Of the 1 never-finaled permit, 1 is over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Most recent permits

AllDeck 1
FiledOutcomeAddressWork described on the permitDeclared cost
Oct 10, 2007Never finaled
issued Oct 2007, no final
922 Greenwich Stnew ground level deck 14'-6" x10'-0" (5 ft from p/l) pressure treated framing with 5/4x6 composite decking . deck heigh t 18" to 32" (no more than 36" from grade level.
Details
Permit
200710105049
Status
issued
Filed
Oct 10, 2007
Permit issued
Oct 10, 2007
Declared cost
$5,100
Address
922 Greenwich St

new ground level deck 14'-6" x10'-0" (5 ft from p/l) pressure treated framing with 5/4x6 composite decking . deck heigh t 18" to 32" (no more than 36" from grade level.

Open the permit page

$5,100
May 30, 2007Completed
final sign-off Jun 2007
1970 Sutter Stwork in unit#201. construct wall and moving electriacl , switchess at foyer area. maek case opening of 2'-6"x 6'-8: high into hallway.
Details
Permit
200705302528
Status
complete
Filed
May 30, 2007
Permit issued
May 30, 2007
Final sign-off
Jun 11, 2007
Declared cost
$3,000
Address
1970 Sutter St

work in unit#201. construct wall and moving electriacl , switchess at foyer area. maek case opening of 2'-6"x 6'-8: high into hallway.

Open the permit page

$3,000