Macs Sf
- Based in
- San Francisco
- On San Francisco permits
- Dec 2023 to May 2026
- Last 24 months
- 5 permits filed
6 permits since 2000: 6 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 29, 2026 | Completed final sign-off Jun 2026 | 584 29th St | interior dryrot repairs, cap foundation at front, below stair case, non street visible work.Details
interior dryrot repairs, cap foundation at front, below stair case, non street visible work. | $3,000 |
| Dec 19, 2025 | Completed final sign-off Jun 2026 | 1220 Russia Av | dry rot repair of walls at crawl space/storage level at existing two-story single family. repair includes copping at existing foundation at approx. 26'-8'' total length. as well as one new isolated footing under an existing beam.Details
dry rot repair of walls at crawl space/storage level at existing two-story single family. repair includes copping at existing foundation at approx. 26'-8'' total length. as well as one new isolated footing under an existing beam. | $8,000 |
| May 20, 2025 | Completed final sign-off May 2025 | 1220 Russia Av | voluntary seismic bolting at existing sill to foundation.Details
voluntary seismic bolting at existing sill to foundation. | $8,000 |
| May 6, 2025 | Completed final sign-off May 2025 | 2208 15th St | repair at front facing street minor trim & one piece of plywood above gate to staircase at rear. all reapirs to be in kind. all work is at residential.Details
repair at front facing street minor trim & one piece of plywood above gate to staircase at rear. all reapirs to be in kind. all work is at residential. | $1,800 |
| Dec 5, 2024 | Completed final sign-off Apr 2025 | 142 Hearst Av | in-kind remodeling of 1 kitchen(s) in 2nd flDetails
in-kind remodeling of 1 kitchen(s) in 2nd fl | $10,561 |
| Dec 18, 2023 | Completed final sign-off Feb 2024 | 737 Cole St | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $20,000 |