Mach Electric
- Based in
- San Francisco
- On San Francisco permits
- Apr 2025 to Apr 2025
- Last 24 months
- 1 permit filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 10, 2025 | Completed final sign-off Aug 2025 | 4715 Geary Bl | to partial abate 2022011904enf- replace (e) blade sign with (n) double sided electrical street facing sign for "me pais restaurant" for sign a. no electrical work, only replacing the vinyl face of the existing sign.Details
to partial abate 2022011904enf- replace (e) blade sign with (n) double sided electrical street facing sign for "me pais restaurant" for sign a. no electrical work, only replacing the vinyl face of the existing sign. | $1,000 |