Mac Phee Construction
- Based in
- Redwood City
- On San Francisco permits
- Jan 2011 to Feb 2011
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 24, 2011 | Completed final sign-off Mar 2011 | 2650 03rd St | add bathroom (toilet and sink) in existing warehouse. fire sprinklers on separate permit.Details
add bathroom (toilet and sink) in existing warehouse. fire sprinklers on separate permit. | $8,500 |
| Jan 28, 2011 | Expired or cancelled expired Mar 2014 | 1531 Beach St | repair & replace/master bath-remove tile in shower/bath/floor replace shower pan, replace (e) damaged tub. guest bath: remove tile in shower, floor, replace shower pan, replace tile.Details
repair & replace/master bath-remove tile in shower/bath/floor replace shower pan, replace (e) damaged tub. guest bath: remove tile in shower, floor, replace shower pan, replace tile. | $19,100 |