M&T Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2014 to Sep 2026
- Last 24 months
- 2 permits filed
26 permits since 2000: 25 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 3, 2026 | In progress issued Sep 2026 | 378 Victoria St | bathroom remodel in kind. tub to shower conversion. replace (e) bathroom tile and vanity in kind. no curbless shower. no change to floor layout. no change to wall layout. no structural work.Details
bathroom remodel in kind. tub to shower conversion. replace (e) bathroom tile and vanity in kind. no curbless shower. no change to floor layout. no change to wall layout. no structural work. | $13,000 |
| May 20, 2025 | Completed final sign-off Oct 2025 | 470 Hill St | 1) kitchen modeling. install plumbing electrical cabinets. countertop tile. 2) bathroom remodeling. install plumbing, electrical, vanity, tub, tile. 3) install sub panel; in kind. no removal of wallsDetails
1) kitchen modeling. install plumbing electrical cabinets. countertop tile. 2) bathroom remodeling. install plumbing, electrical, vanity, tub, tile. 3) install sub panel; in kind. no removal of walls | $31,800 |
| Sep 9, 2024 | Completed final sign-off May 2025 | 5239 California St | 1) kitchen - replace countertop, sink, hood. install flooring. install electrical. gas pipe. no cabinet replacement. 2) install electrical 50amp subpanel. upgrade electrical.Details
1) kitchen - replace countertop, sink, hood. install flooring. install electrical. gas pipe. no cabinet replacement. 2) install electrical 50amp subpanel. upgrade electrical. | $28,000 |
| Aug 7, 2024 | Completed final sign-off May 2025 | 15 Sutro Heights Av | replace dry rot wood in the front right corner and stucco.Details
replace dry rot wood in the front right corner and stucco. | $8,500 |
| Aug 7, 2024 | Completed final sign-off Jan 2025 | 566 21st Av | apt #1: (one)kitchen remodel, install cabinets, countertop, tile, hood, (one)bathroom remodel, install tub, vanity, tile, toilet, install 50 amp panel. upgrade electrical.Details
apt #1: (one)kitchen remodel, install cabinets, countertop, tile, hood, (one)bathroom remodel, install tub, vanity, tile, toilet, install 50 amp panel. upgrade electrical. | $36,000 |
| Nov 6, 2023 | Completed final sign-off Jul 2024 | 123 22nd Av | rev to pa# 2023-0801-3394; lower level (123 22nd av.) bathr #1 structural reinforcement to fl. framing below proposed shower fl. new structural drawings, details and calculations provided no change to architectural designDetails
rev to pa# 2023-0801-3394; lower level (123 22nd av.) bathr #1 structural reinforcement to fl. framing below proposed shower fl. new structural drawings, details and calculations provided no change to architectural design | $2,300 |
| Aug 1, 2023 | Completed final sign-off Jul 2024 | 123 22nd Av | unit 123: remodel baths/kitchen, replace finishes/plubmingn fixtures, add new nonstructural wall @ bedrm #1 to create new dedroom #4; unit 125: remodel bathrooms, replace finishes/plumbing fixtures, skylights; update & replace (e) recessed light fixtures w/led; plumbing fixt in-kindDetails
unit 123: remodel baths/kitchen, replace finishes/plubmingn fixtures, add new nonstructural wall @ bedrm #1 to create new dedroom #4; unit 125: remodel bathrooms, replace finishes/plumbing fixtures, skylights; update & replace (e) recessed light fixtures w/led; plumbing fixt in-kind | $150,000 |
| Jul 3, 2023 | Completed final sign-off Sep 2023 | 1347 10th Av | kitchen remodel-install cabinet, countertops, flooring, plumbing and electrical. remodel in-kindDetails
kitchen remodel-install cabinet, countertops, flooring, plumbing and electrical. remodel in-kind | $15,000 |
| Aug 25, 2021 | Completed final sign-off Jan 2022 | 17 Sutro Heights Av | kitchen remodel install cabinet, floor tile, countertop, sink, hood, painting. h.e. lightingDetails
kitchen remodel install cabinet, floor tile, countertop, sink, hood, painting. h.e. lighting | $14,500 |
| May 24, 2019 | Completed final sign-off Oct 2021 | 647 35th Av | legalize 1st flr area as additional unit #3 per ord# 43-14, including kitchen, living, bathroom & 2 bedrooms. add water heater, furnace & washer/dryer.Details
legalize 1st flr area as additional unit #3 per ord# 43-14, including kitchen, living, bathroom & 2 bedrooms. add water heater, furnace & washer/dryer. | $50,000 |
| Feb 28, 2019 | Completed final sign-off Jun 2019 | 1723 08th Av | replace five existing aluminum windows at the front of the building with wood windows within the existing openings. replace seven windows at the rear with vinyl windows within existing openings.no change of (e) open location & size.Details
replace five existing aluminum windows at the front of the building with wood windows within the existing openings. replace seven windows at the rear with vinyl windows within existing openings.no change of (e) open location & size. | $8,500 |
| Jan 17, 2019 | Completed final sign-off Jun 2019 | 1723 08th Av | remodling of existing bathroom and upgrade electrical service to 200 amp. install 30 recessed lights, replace/install 35 electrical outlets, no wall moved, removed, added or infilled. all existing layouts to remain unchanged.Details
remodling of existing bathroom and upgrade electrical service to 200 amp. install 30 recessed lights, replace/install 35 electrical outlets, no wall moved, removed, added or infilled. all existing layouts to remain unchanged. | $22,000 |
| Nov 19, 2018 | Completed final sign-off Mar 2019 | 639 21st Av | kitchen remodel, install cabinets, tile, plumbing, electrical, insulation & vinyl wall.Details
kitchen remodel, install cabinets, tile, plumbing, electrical, insulation & vinyl wall. | $15,000 |
| Mar 20, 2018 | Completed final sign-off Sep 2018 | 27 Digby St | revision to 201802201683 rearrange (e) bathroom and closet at 3rd floorDetails
revision to 201802201683 rearrange (e) bathroom and closet at 3rd floor | $5,000 |
| Feb 20, 2018 | Completed final sign-off Sep 2018 | 27 Digby St | three bathroom remodel - tile, vanity, light, toilet, fan. approx 40 sf each, no wall alteration or change for (e) layout.Details
three bathroom remodel - tile, vanity, light, toilet, fan. approx 40 sf each, no wall alteration or change for (e) layout. | $36,000 |
| Nov 10, 2017 | Completed final sign-off Apr 2018 | 15 Clayton St | kitchen remodel - floor, cabinets, sink, lights, countertop. no change to wall locations.Details
kitchen remodel - floor, cabinets, sink, lights, countertop. no change to wall locations. | $1,700 |
| Oct 27, 2016 | Completed final sign-off May 2017 | 675 22nd Av | bathroom remodel: floor tile, vanity, lights, toilet. no structural work.Details
bathroom remodel: floor tile, vanity, lights, toilet. no structural work. | $7,500 |
| Feb 22, 2016 | Completed final sign-off Aug 2016 | 566 21st Av | remove and replace partial extg foundation with new.Details
remove and replace partial extg foundation with new. | $8,000 |
| Jan 4, 2016 | Completed final sign-off Aug 2016 | 566 21st Av | apt #2. kitchen remodel - floor tile, cabinets, sink, lights, counter top. no walls moved, removed, added or infilled. all existing layouts to remain. bathroom remodel - floor tile, sink, lights, shower. no walls moved, removed, or infilled. all existing layout to remain unchanged.Details
apt #2. kitchen remodel - floor tile, cabinets, sink, lights, counter top. no walls moved, removed, added or infilled. all existing layouts to remain. bathroom remodel - floor tile, sink, lights, shower. no walls moved, removed, or infilled. all existing layout to remain unchanged. | $25,000 |
| Oct 16, 2014 | Completed final sign-off May 2015 | 3717 Divisadero St | replace 24 windows facing street side with same size and shape with fiberglass material and double pane.Details
replace 24 windows facing street side with same size and shape with fiberglass material and double pane. | $10,000 |
| Sep 18, 2014 | Completed final sign-off Nov 2014 | 3288 Steiner St | repair siding at south wall of bldg (approx. 100 square feet). visible to street.Details
repair siding at south wall of bldg (approx. 100 square feet). visible to street. | $2,500 |
| Sep 11, 2014 | Completed final sign-off Oct 2014 | 4116 Ulloa St | replace siding and stucco at front of buildingDetails
replace siding and stucco at front of building | $7,000 |
| Sep 11, 2014 | Completed final sign-off Oct 2014 | 1894 11th Av | replace siding 120 sq ft at south side of bldgDetails
replace siding 120 sq ft at south side of bldg | $1,500 |
| May 7, 2014 | Completed final sign-off Aug 2014 | 1366 47th Av | #a: kitchen & bathroom remodel, floor tiles, cabinets, sink, lights, countertop, toilet, bathtub, 3 interior doors in kind. whole unit- dry wall, painting, lights, outlets, no structural work, 3 windows in kind.Details
#a: kitchen & bathroom remodel, floor tiles, cabinets, sink, lights, countertop, toilet, bathtub, 3 interior doors in kind. whole unit- dry wall, painting, lights, outlets, no structural work, 3 windows in kind. | $60,000 |
| Jan 17, 2014 | Completed final sign-off Apr 2014 | 17 Sutro Heights Av | 2 balconies dry rot stucco repair visible to the street stucco repair in kind. total work not to exceed 50% of the project area.Details
2 balconies dry rot stucco repair visible to the street stucco repair in kind. total work not to exceed 50% of the project area. | $12,000 |
| Jan 15, 2014 | Completed final sign-off May 2014 | 1894 11th Av | kitchen remodel - floor tiles, cabinets, sink, lights, countertop. ligting shall comply with t-24Details
kitchen remodel - floor tiles, cabinets, sink, lights, countertop. ligting shall comply with t-24 | $15,000 |