M & M Construction & Home Design
- Based in
- Concord
- On San Francisco permits
- Nov 2014 to Nov 2021
- Last 24 months
- 0 permits filed
10 permits since 2000: 3 completed, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 4 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 29, 2021 | Completed final sign-off Jan 2022 | 235 Hearst Av | removal of small fireplace, patch (non structural). 8 recessed can lights installation. repair a leaky toilet.Details
removal of small fireplace, patch (non structural). 8 recessed can lights installation. repair a leaky toilet. | $20,000 |
| Oct 31, 2019 | Never finaled issued Oct 2019, no final | 1637 Page St | replacing partial cabinets and sink garbage disposal in kindDetails
replacing partial cabinets and sink garbage disposal in kind | $20,000 |
| Oct 31, 2019 | Never finaled issued Oct 2019, no final | 1635 Page St | replacing partial cabinets and sink. replace dishwasher and garbage disposal in kindDetails
replacing partial cabinets and sink. replace dishwasher and garbage disposal in kind | $20,000 |
| Sep 16, 2019 | Never finaled issued Jan 2020, no final | 39 Virginia Av | 192 sq ft of kitchen remodel merge extg sun room into kitchen. new counter at extg court yard.Details
192 sq ft of kitchen remodel merge extg sun room into kitchen. new counter at extg court yard. | $15,000 |
| Nov 4, 2016 | Never finaled issued Nov 2016, no final | 4126 Fulton St | upgrade main panel to 200 amp and upgrade and relocate subpanel 125 amp. rewire electrical to code. replace extg toilet. install new fan in bathroom.Details
upgrade main panel to 200 amp and upgrade and relocate subpanel 125 amp. rewire electrical to code. replace extg toilet. install new fan in bathroom. | $8,500 |
| Aug 25, 2016 | Expired or cancelled cancelled Jan 2026 | 125 Naylor St | revision to transom windows removal of sidelightsDetails
revision to transom windows removal of sidelights | |
| Aug 9, 2016 | Completed final sign-off Dec 2016 | 326 Anderson St | bathroom remodel like for likeDetails
bathroom remodel like for like | $19,000 |
| Mar 25, 2016 | Completed final sign-off Jan 2017 | 125 Naylor St | remove and replace windows at front wall. remove headers and replace. install braced panels in basement. window pella architect series wood clad with custom profiles to match existing. windows replaced like for like. no size changes.Details
remove and replace windows at front wall. remove headers and replace. install braced panels in basement. window pella architect series wood clad with custom profiles to match existing. windows replaced like for like. no size changes. | $20,000 |
| Feb 10, 2015 | Never finaled issued Feb 2015, no final | 3840 Market St | master bathroom remodel: replace vanity, relocate toilet, shower, tub, 4 recessed cans, shower enclosure. replace existing bath fan. (note: buzzer marked as unit #5)Details
master bathroom remodel: replace vanity, relocate toilet, shower, tub, 4 recessed cans, shower enclosure. replace existing bath fan. (note: buzzer marked as unit #5) | $21,000 |
| Nov 14, 2014 | Never finaled issued Nov 2014, no final | 3840 Market St | work in unit 301 (#5): kitchen and bathroom remodelDetails
work in unit 301 (#5): kitchen and bathroom remodel | $45,000 |