M Karkori Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Sep 2000 to Jan 2010
- Last 24 months
- 0 permits filed
30 permits since 2000: 25 completed, 1 never finaled, 4 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 19, 2010 | Completed final sign-off Dec 2010 | 1409 Sanchez St | revision to application 2009-1207-2712. revise foundation dimensions per details. remove requirements of shoring & underpining permits.Details
revision to application 2009-1207-2712. revise foundation dimensions per details. remove requirements of shoring & underpining permits. | |
| Aug 24, 2009 | Completed final sign-off Sep 2009 | 33 Delmar St | install 3 cabinets in the kitchenDetails
install 3 cabinets in the kitchen | $1,000 |
| Aug 24, 2009 | Completed final sign-off Sep 2009 | 37 Delmar St | install 3 upper cabinets in the kitchenDetails
install 3 upper cabinets in the kitchen | $1,000 |
| Aug 21, 2009 | Expired or cancelled expired Oct 2024 | 31 Uranus Tr | convert storage level & crawl space to (n) 1st. & 2nd. flrs. w/ 3-bedrms, 2-baths, family rm., craft rm.. replace (e) stairway from ground level to (n) 2nd. flr. add deck from (n) 2nd. flr. @ rear yard. add stairs from (n) 1st. flr. to rear yard.Details
convert storage level & crawl space to (n) 1st. & 2nd. flrs. w/ 3-bedrms, 2-baths, family rm., craft rm.. replace (e) stairway from ground level to (n) 2nd. flr. add deck from (n) 2nd. flr. @ rear yard. add stairs from (n) 1st. flr. to rear yard. | $150,000 |
| May 28, 2009 | Completed final sign-off Jun 2009 | 98 Laidley St | cover (e) front & left side of house only. (12000 sq. ft.) shingle under separate permit. with 1/2 cdx plywood over (e) 1 x 8. 10d a 6" edges & 10" infil redwood panels. typical.Details
cover (e) front & left side of house only. (12000 sq. ft.) shingle under separate permit. with 1/2 cdx plywood over (e) 1 x 8. 10d a 6" edges & 10" infil redwood panels. typical. | $6,000 |
| May 22, 2009 | Completed final sign-off Jun 2009 | 98 Laidley St | remove (e) ceder singles & replace with new one. (front)Details
remove (e) ceder singles & replace with new one. (front) | $24,000 |
| Mar 6, 2009 | Completed final sign-off Oct 2009 | 522 Chenery St | revision to 200811023703: rebuild front entry stair, replace front facade sidingDetails
revision to 200811023703: rebuild front entry stair, replace front facade siding | $13,000 |
| Oct 20, 2008 | Completed final sign-off Jan 2010 | 1409 Sanchez St | demolition of one story w/basement single family dwelling. nov#200881377.Details
demolition of one story w/basement single family dwelling. nov#200881377. | |
| Oct 20, 2008 | Completed final sign-off Dec 2010 | 1409 Sanchez St | construction of three-story over basement wood frame two family dwelling.Details
construction of three-story over basement wood frame two family dwelling. | $450,000 |
| Jun 17, 2008 | Completed final sign-off Dec 2008 | 560 Haight St | work @ unit# 208 only. replace fixtures in existing 1 bathroom, re-tile & paint floor, ceiling & walls.Details
work @ unit# 208 only. replace fixtures in existing 1 bathroom, re-tile & paint floor, ceiling & walls. | $14,700 |
| Mar 24, 2005 | Completed final sign-off Dec 2005 | 284 Duncan St | new bath fixtures,plumbing.new kitchen cabs,plumbing.new flooring,new sheetrock.electrical-kitchen,Details
new bath fixtures,plumbing.new kitchen cabs,plumbing.new flooring,new sheetrock.electrical-kitchen, | $35,000 |
| Feb 24, 2005 | Completed final sign-off Mar 2005 | 284 Duncan St | rmove (e) front stair case and replace with new stair case in kind.Details
rmove (e) front stair case and replace with new stair case in kind. | $2,500 |
| Nov 30, 2004 | Completed final sign-off Mar 2005 | 40 Surrey St | renew app 200312112162, 200109057568Details
renew app 200312112162, 200109057568 | |
| Oct 19, 2004 | Completed final sign-off Nov 2004 | 88 Manchester St | install instulation r13, r30 for wall and cover with 1/2 plywood sheetrock in garage area 5/8" yDetails
install instulation r13, r30 for wall and cover with 1/2 plywood sheetrock in garage area 5/8" y | $3,700 |
| Mar 26, 2004 | Never finaled issued Mar 2004, no final | 130 Belgrave Av | remove existing wood shingles and replace with new. red ceder wood shilgles some faciing street *Details
remove existing wood shingles and replace with new. red ceder wood shilgles some faciing street * | $13,400 |
| Oct 23, 2003 | Completed final sign-off Nov 2003 | 325 Prospect Av | renew#200209277711 for final inspectionDetails
renew#200209277711 for final inspection | |
| Sep 19, 2003 | Completed final sign-off Oct 2003 | 156 Albion St | comply nov 200342002 - repair exterior stairs at rear.Details
comply nov 200342002 - repair exterior stairs at rear. | $5,700 |
| Sep 12, 2003 | Completed final sign-off Apr 2004 | 58 Langton St | remove existing plaster & replace with 5/8 sheetrock type x kitchen only. remove existing cabinet &Details
remove existing plaster & replace with 5/8 sheetrock type x kitchen only. remove existing cabinet & | $12,700 |
| Mar 10, 2003 | Completed final sign-off Mar 2003 | 15 Conrad St | well the basement out as more plywood bolts 5/8 by 7 right side of basement crawl spaceDetails
well the basement out as more plywood bolts 5/8 by 7 right side of basement crawl space | $4,500 |
| Mar 10, 2003 | Completed final sign-off Mar 2003 | 1270 Stanyan St | to rebuild stairs at rear deck as shown on plans from pa 9208921-which werew cfc'd on 10/28/92-plansDetails
to rebuild stairs at rear deck as shown on plans from pa 9208921-which werew cfc'd on 10/28/92-plans | $4,500 |
| Sep 27, 2002 | Expired or cancelled expired Dec 2005 | 325 Prospect Av | revise 2002/09/09/6035. add toilet ad window to exist laundry room.Details
revise 2002/09/09/6035. add toilet ad window to exist laundry room. | $5,000 |
| Sep 25, 2002 | Expired or cancelled expired Sep 2004 | 1037 Ocean Av | underground electric utility service connection.Details
underground electric utility service connection. | $1,300 |
| Jun 6, 2002 | Completed final sign-off Jun 2002 | 16 Ord Ct | repair staire according to voilation comply#n.o.v 200229088Details
repair staire according to voilation comply#n.o.v 200229088 | $1,000 |
| Nov 8, 2001 | Completed final sign-off Feb 2002 | 979 Alabama St | kitchen remodel/cabinets change the location of store minor electric workDetails
kitchen remodel/cabinets change the location of store minor electric work | $18,000 |
| Oct 23, 2001 | Completed final sign-off Dec 2001 | 631 Ofarrell St | remove two nonbearing wallsDetails
remove two nonbearing walls | $7,000 |
| Sep 27, 2001 | Completed final sign-off Feb 2002 | 146 Joost Av | kitchen remodel;elec work limited to kitchen remodel;Details
kitchen remodel;elec work limited to kitchen remodel; | $28,000 |
| Mar 10, 2001 | Completed final sign-off Mar 2001 | 117 St Marys Av | renew appln #200009019498Details
renew appln #200009019498 | |
| Mar 2, 2001 | Expired or cancelled expired Jul 2001 | 832 Diamond St | remove existing clay pipe & replace with new iron cast pipe (for drainage) in the garage.Details
remove existing clay pipe & replace with new iron cast pipe (for drainage) in the garage. | $2,000 |
| Feb 21, 2001 | Completed final sign-off Feb 2002 | 146 Joost Av | rev. to appl#200011276527 add a skylt to scope of work for bathrm remodel & to increase job vacuatioDetails
rev. to appl#200011276527 add a skylt to scope of work for bathrm remodel & to increase job vacuatio | $8,000 |
| Sep 1, 2000 | Completed final sign-off Mar 2001 | 117 St Marys Av | kitchen & bathroom remodel, replace cabinets, fixtures, tiles,Details
kitchen & bathroom remodel, replace cabinets, fixtures, tiles, | $20,000 |