M G Remediation Inc
- Based in
- Hayward
- On San Francisco permits
- Apr 2011 to May 2026
- Last 24 months
- 2 permits filed
7 permits since 2000: 5 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 18, 2026 | Completed final sign-off Aug 2026 | 1363 Sanchez St | installation of a radon mitigation system to mitigate radon, a naturally occuring gas. core a 5" hole through perimeter footing and run 3" sch 40 pvc to fan location on exterior wall. run 4" sch 40 pvc piping to roof where gas will exhaust. there will be electrical connection to fan.Details
installation of a radon mitigation system to mitigate radon, a naturally occuring gas. core a 5" hole through perimeter footing and run 3" sch 40 pvc to fan location on exterior wall. run 4" sch 40 pvc piping to roof where gas will exhaust. there will be electrical connection to fan. | $6,000 |
| Mar 7, 2025 | In progress issued Mar 2025 | 600 20th St | asbestos abatement related to demolition of building (202407227013)Details
asbestos abatement related to demolition of building (202407227013) | $10,000 |
| Oct 9, 2018 | Never finaled issued Oct 2018, no final | 531 04th Av | replace two non-historic windows at non-visible rear of building within same openings. no other work.Details
replace two non-historic windows at non-visible rear of building within same openings. no other work. | $2,500 |
| Jun 5, 2014 | Completed final sign-off Sep 2015 | 35 Santa Ana Av | move front exterior stairway from left of property to center front door entrance. remove extg stair at left side. relandscape.Details
move front exterior stairway from left of property to center front door entrance. remove extg stair at left side. relandscape. | $7,500 |
| Mar 12, 2013 | Completed final sign-off May 2014 | 3948 26th St | unit 1 & 3: comply with n.o.v. complaint # 201386891 -- six (6) dual pane windows to be installed at front. two (2) dual pane windows - window in bedrooms will comply with egress window req. (2 out of 8 on order)Details
unit 1 & 3: comply with n.o.v. complaint # 201386891 -- six (6) dual pane windows to be installed at front. two (2) dual pane windows - window in bedrooms will comply with egress window req. (2 out of 8 on order) | $1,000 |
| Mar 12, 2013 | Completed final sign-off Apr 2013 | 3948 26th St | #2: installation of approximately 1" of spray foam insulation plus r-15 fiberglass insulation on approx 400 sf of wall area. installation of 5/8" sheetrock on same wals. install bown in insulaton on approx 100 sf of wall and floor area.Details
#2: installation of approximately 1" of spray foam insulation plus r-15 fiberglass insulation on approx 400 sf of wall area. installation of 5/8" sheetrock on same wals. install bown in insulaton on approx 100 sf of wall and floor area. | $3,500 |
| Apr 15, 2011 | Completed final sign-off May 2011 | 30 Onondaga Av | install new mini-mesh black poly vinyl coat fence at grass areaDetails
install new mini-mesh black poly vinyl coat fence at grass area | $12,500 |