M C Tran Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2015 to Jun 2024
- Last 24 months
- 0 permits filed
8 permits since 2000: 8 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 20, 2024 | Completed final sign-off Oct 2024 | 355 Ralston St | 2nd floor: remodel (e) kitchen and replace front facing windows. front windows to be alumium clad woodDetails
2nd floor: remodel (e) kitchen and replace front facing windows. front windows to be alumium clad wood | $30,000 |
| Jan 25, 2023 | Completed final sign-off May 2023 | 115 Brazil Av | revision to bpa#202210114096, reduce scope of work from (4) bathrooms to (2) bathroomsDetails
revision to bpa#202210114096, reduce scope of work from (4) bathrooms to (2) bathrooms | |
| Oct 11, 2022 | Completed final sign-off May 2023 | 115 Brazil Av | build a full bath in the extg bedroom #1 and extg dining room in unit #117 brazil. build a full bath in the extg bedroom #2 and extg dining room in unit #115. please see scope of work in proposed plan.Details
build a full bath in the extg bedroom #1 and extg dining room in unit #117 brazil. build a full bath in the extg bedroom #2 and extg dining room in unit #115. please see scope of work in proposed plan. | $50,000 |
| Jun 29, 2022 | Completed final sign-off Sep 2022 | 115 Brazil Av | 2 unit bldg duplex. remodel extg kitchen in both 2 units. replace new cabinets, nw exhaust fan, new sink, new floor, new faucet. non structure. kitchen are approx 150 sq ft, light cieling. new counter. 3 recptacles.Details
2 unit bldg duplex. remodel extg kitchen in both 2 units. replace new cabinets, nw exhaust fan, new sink, new floor, new faucet. non structure. kitchen are approx 150 sq ft, light cieling. new counter. 3 recptacles. | $10,500 |
| Jun 9, 2017 | Completed final sign-off Mar 2018 | 1031 Rivera St | infill open space under existing floor habitable area. add 2 bedrroms. family room & two full bath rooms @ 1st floor per planDetails
infill open space under existing floor habitable area. add 2 bedrroms. family room & two full bath rooms @ 1st floor per plan | $57,600 |
| Jun 22, 2016 | Completed final sign-off Mar 2018 | 235 Country Club Dr | one new family room with laundry, master bath and bedroom, 1/2 bath to be constructed at ground floor.Details
one new family room with laundry, master bath and bedroom, 1/2 bath to be constructed at ground floor. | $60,000 |
| Apr 19, 2016 | Completed final sign-off May 2016 | 1440 Jones St | comply with n.o.v. #201609191 item #2 - repair stairs in kind less than 50%.Details
comply with n.o.v. #201609191 item #2 - repair stairs in kind less than 50%. | $750 |
| Apr 30, 2015 | Completed final sign-off Apr 2016 | 3287 Cesar Chavez St | relocate kitchen, add (n) bathroom, and remodel (e) bathroom on 2ns floor. infill light court on 2nd flr. add skylightDetails
relocate kitchen, add (n) bathroom, and remodel (e) bathroom on 2ns floor. infill light court on 2nd flr. add skylight | $45,000 |