M C L Heating & Air Conditioning Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2018 to Oct 2024
- Last 24 months
- 1 permit filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 21, 2024 | Completed final sign-off Oct 2024 | 646 Funston Av | remove qty 2 gravity furnaces and aspestos ductwork. replace w/ qty 2 carrier furnaces, model no's 585b1b045m1412, and new ducting in garage. 80% efficiency required of each new model.Details
remove qty 2 gravity furnaces and aspestos ductwork. replace w/ qty 2 carrier furnaces, model no's 585b1b045m1412, and new ducting in garage. 80% efficiency required of each new model. | $34,000 |
| Nov 8, 2023 | Completed final sign-off Nov 2023 | 1330 Lake St | installation of new duct work. remove (2) gravity furnaces and ductwork, replace with (2) effiency gas furance systems. eff 98% direct vent gas furnaceDetails
installation of new duct work. remove (2) gravity furnaces and ductwork, replace with (2) effiency gas furance systems. eff 98% direct vent gas furnace | $30,000 |
| Oct 26, 2018 | Completed final sign-off Nov 2018 | 850 45th Av | to comply with physical inspection report cc-8250Details
to comply with physical inspection report cc-8250 | $1,500 |