M C Construction
- Based in
- Redwood City
- On San Francisco permits
- Jan 2013 to Sep 2014
- Last 24 months
- 0 permits filed
3 permits since 2000: 2 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 22, 2014 | Never finaled issued Sep 2014, no final | 531 21st Av | add new full bathroom within upstairs penthouse bedroom. extg bldg footprint not altered/bathroom to be constructed within extg exterior walls.Details
add new full bathroom within upstairs penthouse bedroom. extg bldg footprint not altered/bathroom to be constructed within extg exterior walls. | $20,000 |
| Aug 28, 2014 | Completed final sign-off Nov 2014 | 531 21st Av | remove and replace 4 (e) aluminum windows with new fibrex windows and new trim, per nw preservation approval. replace wood siding on the recessed top floor in kind. no other exterior work under this scope. like for like @ upstairs bedroom (4th floor0 r & r adjacent siding in like kind @ top floorDetails
remove and replace 4 (e) aluminum windows with new fibrex windows and new trim, per nw preservation approval. replace wood siding on the recessed top floor in kind. no other exterior work under this scope. like for like @ upstairs bedroom (4th floor0 r & r adjacent siding in like kind @ top floor | $8,000 |
| Jan 17, 2013 | Completed final sign-off Jun 2013 | 90 Maywood Dr | bathroom remodel: all fixtures replaced but not relocated floor plan not alteredDetails
bathroom remodel: all fixtures replaced but not relocated floor plan not altered | $7,500 |