Luo Marble & Tile Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2005 to Nov 2022
- Last 24 months
- 0 permits filed
9 permits since 2000: 7 completed, 2 never finaled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 2, 2022 | Never finaled filed Nov 2022, never issued | 574 London St | revision for #202207158645: (2) in kind akumnum window relacement frontDetails
revision for #202207158645: (2) in kind akumnum window relacement front | $10,000 |
| Jul 15, 2022 | Completed final sign-off Mar 2023 | 574 London St | replace 10 windows (2 street facing) with casement wood aluminum clad windows. u=0.30 max.Details
replace 10 windows (2 street facing) with casement wood aluminum clad windows. u=0.30 max. | $10,000 |
| Jul 1, 2022 | Completed final sign-off Jan 2023 | 574 London St | revision to approved pa 2021-1021-0974 reconfigure and reframe non-bearing walls @ 2nd fl per planDetails
revision to approved pa 2021-1021-0974 reconfigure and reframe non-bearing walls @ 2nd fl per plan | |
| Apr 1, 2022 | Completed final sign-off Jan 2023 | 574 London St | replace interior plaster finishes at bedrooms, living room, dinning room and hall w/ 5/8" "x" gyp bd. for (n) wiring & insulation per field inspections requirement at 2nd fl.Details
replace interior plaster finishes at bedrooms, living room, dinning room and hall w/ 5/8" "x" gyp bd. for (n) wiring & insulation per field inspections requirement at 2nd fl. | $8,600 |
| Mar 10, 2022 | Completed final sign-off Jan 2023 | 574 London St | to comply with complaint 202182179, 202182373, 202184262. add one unit at first floor to existing rh-2 zoning building (kithcen, 2 bedrooms, one bath and living room.Details
to comply with complaint 202182179, 202182373, 202184262. add one unit at first floor to existing rh-2 zoning building (kithcen, 2 bedrooms, one bath and living room. | $57,000 |
| Oct 21, 2021 | Completed final sign-off Jan 2023 | 574 London St | remodel kitchen, 2 bathrooms and convert nook to office at 2nd floor per plan.Details
remodel kitchen, 2 bathrooms and convert nook to office at 2nd floor per plan. | $33,000 |
| Sep 1, 2020 | Completed final sign-off Mar 2021 | 1331 Cayuga Av | 1st floor: new master bedroom w/ bathroom, exercise/gym room & bathroom.Details
1st floor: new master bedroom w/ bathroom, exercise/gym room & bathroom. | $56,000 |
| Aug 9, 2017 | Completed final sign-off Aug 2018 | 895 Delano Av | remodel(e) kitchen, two bathroom, replace coutner, cabinets fixtures. re-wire electrical & lightings. all work at 2nd floor.Details
remodel(e) kitchen, two bathroom, replace coutner, cabinets fixtures. re-wire electrical & lightings. all work at 2nd floor. | $38,000 |
| Jun 28, 2005 | Never finaled issued Jun 2005, no final | 927 Ortega St | replace kitchen countertop,no structural changesDetails
replace kitchen countertop,no structural changes | $5,000 |