Lucrum Builders
- Based in
- Oakland
- On San Francisco permits
- Feb 2009 to Sep 2014
- Last 24 months
- 0 permits filed
7 permits since 2000: 6 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 22, 2014 | Completed final sign-off Apr 2015 | 2675 Geary Bl | unit e103: t.i. including electrical, plumbing & mechanical distibution; install hood & walk-in box. compliance with maher ordinance no 155-13 not required.Details
unit e103: t.i. including electrical, plumbing & mechanical distibution; install hood & walk-in box. compliance with maher ordinance no 155-13 not required. | $70,000 |
| Jul 8, 2011 | Completed final sign-off Dec 2011 | 177 Townsend St | revision to pa# 2010.12.09.6412. install captive air model rh type ii hood to confirm to ul 197 for all ovensDetails
revision to pa# 2010.12.09.6412. install captive air model rh type ii hood to confirm to ul 197 for all ovens | |
| Dec 21, 2010 | Completed final sign-off Apr 2011 | 147 Mason St | build out subway qsr(quick serve restaurant). intall eletrical, plumbing, flooring hvacDetails
build out subway qsr(quick serve restaurant). intall eletrical, plumbing, flooring hvac | $70,000 |
| Dec 9, 2010 | Completed final sign-off Jul 2011 | 177 Townsend St | interior tenant improvement. walls, mech, elc, plumbing, distribution, walk in box water heater grease trapDetails
interior tenant improvement. walls, mech, elc, plumbing, distribution, walk in box water heater grease trap | $85,000 |
| May 27, 2010 | Never finaled issued Sep 2010, no final | 193 06th St | tenant improvement. add new non structural walls. 20 electrical & plumbing per plans. install type ii hood. install lighting. equipment, fixtures & finishes necessary to produce subway sandwich store.Details
tenant improvement. add new non structural walls. 20 electrical & plumbing per plans. install type ii hood. install lighting. equipment, fixtures & finishes necessary to produce subway sandwich store. | $75,000 |
| Mar 9, 2010 | Completed final sign-off Jul 2010 | 77 Van Ness Av | comm'l ti for subway sandwich store. work to include plumbing, electrical, and non-structural modifications per plan, type ii hood. fire sprinkler, life safety, and exterior sign under separate permits.Details
comm'l ti for subway sandwich store. work to include plumbing, electrical, and non-structural modifications per plan, type ii hood. fire sprinkler, life safety, and exterior sign under separate permits. | $7,500 |
| Feb 6, 2009 | Completed final sign-off Jul 2009 | 2375 Market St | remodel existing subway sandwich store to include partition walls, wall paper, paint, tile, plumbing, electrical and fixtures. exhause fan in hood.Details
remodel existing subway sandwich store to include partition walls, wall paper, paint, tile, plumbing, electrical and fixtures. exhause fan in hood. | $85,000 |