Lopez Quality Construction
- Based in
- Daly City
- On San Francisco permits
- Aug 2017 to Dec 2025
- Last 24 months
- 4 permits filed
28 permits since 2000: 26 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 1, 2025 | In progress filed Dec 2025, not yet issued | 495 Corbett Av | add decks and stairs to rear of house, relocate(e) window with glass door/sidelight on first floor.Details
add decks and stairs to rear of house, relocate(e) window with glass door/sidelight on first floor. | $100,000 |
| Oct 20, 2025 | Completed final sign-off Jun 2026 | 461 27th St | found some dry rot, replace 3 window header like for like, replace 20% of framing in the back walls, replace another 3 windows like for like. remove and install approx 150 sqft of siding, 100 sqft of stucco, remove and install same guard rail, drywall, repair as needed. all work non-street visibleDetails
found some dry rot, replace 3 window header like for like, replace 20% of framing in the back walls, replace another 3 windows like for like. remove and install approx 150 sqft of siding, 100 sqft of stucco, remove and install same guard rail, drywall, repair as needed. all work non-street visible | $145,000 |
| Jul 22, 2025 | Completed final sign-off Jun 2026 | 461 27th St | backyard: replace 2 patio sliding doors in kind at ground floor & 2nd floor. replace 1 window non st visible in kind on 3rd floor. all same size, same opening, same location, same operation. no structural work. no change in structure. replace stucco in rear in kind - 250 sq ft. u factor 0.30 max. teDetails
backyard: replace 2 patio sliding doors in kind at ground floor & 2nd floor. replace 1 window non st visible in kind on 3rd floor. all same size, same opening, same location, same operation. no structural work. no change in structure. replace stucco in rear in kind - 250 sq ft. u factor 0.30 max. te | $45,000 |
| Oct 29, 2024 | Completed final sign-off Jun 2025 | 3622 Broderick St | kitchen and 2 full bathrooms remodel like for like. no moving walls. fixtures to remain in the same location. kitchen approx. 180 sq ft. each bathroom approx. 40 sq ft.no moving wall fixtures to remain in same locatioin.Details
kitchen and 2 full bathrooms remodel like for like. no moving walls. fixtures to remain in the same location. kitchen approx. 180 sq ft. each bathroom approx. 40 sq ft.no moving wall fixtures to remain in same locatioin. | $80,000 |
| Aug 26, 2024 | Completed final sign-off Sep 2024 | 2000 Eddy St | siding replace with hardie siding, not visible from street. no doors, no windowsDetails
siding replace with hardie siding, not visible from street. no doors, no windows | $23,000 |
| Jan 3, 2024 | Completed final sign-off Mar 2024 | 1600 York St | 2 bathrooms remodels, like for like, plumbing upgrade as needed, electical upgrade as neededDetails
2 bathrooms remodels, like for like, plumbing upgrade as needed, electical upgrade as needed | $40,000 |
| Oct 16, 2023 | Completed final sign-off Dec 2023 | 2830 Golden Gate Av | bathroom remodel: like for like: new toilet same location, new vanity same location, new shoer vlave, new tile, not electrical work, just light fixtures replaceDetails
bathroom remodel: like for like: new toilet same location, new vanity same location, new shoer vlave, new tile, not electrical work, just light fixtures replace | $20,000 |
| Sep 15, 2023 | Completed final sign-off Oct 2023 | 151 Moffitt St | bath remodel bathtub area only change showr valve shower head, tile, tub same layout. no electrical work. no wall changes. (e) toilet and vanity to remain.Details
bath remodel bathtub area only change showr valve shower head, tile, tub same layout. no electrical work. no wall changes. (e) toilet and vanity to remain. | $15,000 |
| May 31, 2023 | Completed final sign-off Oct 2023 | 2033 Leavenworth St | unit d: kitchen remodel in-kind. add new island in the middle (maintain 3ft between cabinets and island). upgrade plumbing and electrical as needed. new subpanel. maintain 3ft btwn cabinetsDetails
unit d: kitchen remodel in-kind. add new island in the middle (maintain 3ft between cabinets and island). upgrade plumbing and electrical as needed. new subpanel. maintain 3ft btwn cabinets | $50,000 |
| Mar 30, 2023 | Completed final sign-off Sep 2023 | 306 Church St | 2/f unit# 306: remodel kitchen entirely w/new fixtures & finishes, convert existing full bathroom into 2 full bathrooms, install new heating unit.Details
2/f unit# 306: remodel kitchen entirely w/new fixtures & finishes, convert existing full bathroom into 2 full bathrooms, install new heating unit. | $80,000 |
| Jan 4, 2023 | Completed final sign-off Apr 2023 | 375 Arlington St | main floor - kitchen remodel in kind, electrical upgrade, plumbing up grade kitchen area only, new cabinets and new floor. kitchen size 10'x16'.Details
main floor - kitchen remodel in kind, electrical upgrade, plumbing up grade kitchen area only, new cabinets and new floor. kitchen size 10'x16'. | $45,000 |
| Sep 13, 2022 | Completed final sign-off Dec 2022 | 495 Corbett Av | kitchen remodel in kind. new cabinets, flooring, upgrade electrical and plumbingDetails
kitchen remodel in kind. new cabinets, flooring, upgrade electrical and plumbing | $27,000 |
| Jan 25, 2022 | Completed final sign-off Feb 2023 | 827 33rd Av | convert extg powder room to a bathroom at ground floor with a new window. at rear elevation, replace 3 extg windows with a french door unit.Details
convert extg powder room to a bathroom at ground floor with a new window. at rear elevation, replace 3 extg windows with a french door unit. | $25,000 |
| Sep 16, 2021 | Completed final sign-off Dec 2021 | 2638 16th Av | kitchen remodel in kind, same layout upgrade plumbing and electrical. lights per cenc 150.0 (k)Details
kitchen remodel in kind, same layout upgrade plumbing and electrical. lights per cenc 150.0 (k) | $32,550 |
| Sep 16, 2021 | Completed final sign-off Apr 2022 | 2830 Golden Gate Av | bathroom replace the tile walls and floor and paint.in kindDetails
bathroom replace the tile walls and floor and paint.in kind | $8,000 |
| Feb 17, 2021 | Completed final sign-off Apr 2021 | 70 Aquavista Wy | replace 2 exterior back doors in kind. repair approximately 200 sqft of dryrot. replace the sheathing math the stucco.Details
replace 2 exterior back doors in kind. repair approximately 200 sqft of dryrot. replace the sheathing math the stucco. | $8,000 |
| Feb 3, 2021 | Completed final sign-off Mar 2022 | 5960 Mission St | interior remodel of (e) self-serve laundromat. replace machines with new. bathrom to be ada compliant & new handicap parking space in existing parking lot. no structural work.Details
interior remodel of (e) self-serve laundromat. replace machines with new. bathrom to be ada compliant & new handicap parking space in existing parking lot. no structural work. | $200,000 |
| Oct 1, 2020 | Completed final sign-off Nov 2020 | 2 Sharon St | kitchen, bathroom and laundry, remodel in kind. new cabinets, dry wall, insulation, replace shower valve sinks. upgrade electrical everything in kind, same layout. replace 44 wood windows around the house in kind same size sam eopenings, wood windows.Details
kitchen, bathroom and laundry, remodel in kind. new cabinets, dry wall, insulation, replace shower valve sinks. upgrade electrical everything in kind, same layout. replace 44 wood windows around the house in kind same size sam eopenings, wood windows. | $93,000 |
| Aug 13, 2020 | Completed final sign-off Sep 2020 | 116 Banks St | repair dryrot in front left corner. acrilyc stucco, make smooth coat of stucco in front and one coat of acilyc. approx 300 sq.ft.Details
repair dryrot in front left corner. acrilyc stucco, make smooth coat of stucco in front and one coat of acilyc. approx 300 sq.ft. | $10,000 |
| Aug 13, 2020 | Never finaled issued Aug 2020, no final | 100 Ulloa St | install new 14 windows & 2 doors in kind in front & left side of house (n) insulation,(n) sheating,(n) stucco,repair dryot in front stair case, (n) tile in front stairs.approx 2800 sq.ft. no change to building's architectual elements - windows at front to be wood or wood interior with aluinum cladDetails
install new 14 windows & 2 doors in kind in front & left side of house (n) insulation,(n) sheating,(n) stucco,repair dryot in front stair case, (n) tile in front stairs.approx 2800 sq.ft. no change to building's architectual elements - windows at front to be wood or wood interior with aluinum clad | $80,000 |
| May 28, 2020 | Completed final sign-off Sep 2020 | 2719 Pine St | bathroom remodel in kind. replace toilet, sink and vanity in same location. new waste and drain. keep the shower same , install new drywall around toilets and sinks and install new tile in the floor. all work in kind.Details
bathroom remodel in kind. replace toilet, sink and vanity in same location. new waste and drain. keep the shower same , install new drywall around toilets and sinks and install new tile in the floor. all work in kind. | $10,000 |
| Mar 16, 2020 | Completed final sign-off Jun 2020 | 151 Moffitt St | bathroom remodel in kind.Details
bathroom remodel in kind. | $20,575 |
| Dec 13, 2019 | Completed final sign-off Sep 2020 | 200 Grand View Av | dry rot repair. demo approximately 60 sf of stucco in the lower front. repair the framing. waterproof. apply new stucco, prime and paint. repair in-kind.Details
dry rot repair. demo approximately 60 sf of stucco in the lower front. repair the framing. waterproof. apply new stucco, prime and paint. repair in-kind. | $10,000 |
| Dec 3, 2018 | Completed final sign-off Feb 2019 | 151 Moffitt St | remove existing windows (11) and shingles siding at the back of the house. install 11 windows in kind. new stucco over the back walls.Details
remove existing windows (11) and shingles siding at the back of the house. install 11 windows in kind. new stucco over the back walls. | $28,000 |
| Jun 11, 2018 | Completed final sign-off Aug 2018 | 366 Arlington St | dry rot repair in the front of the house stairs, new wood siding in kind paint, guardrails repair wood cedar siding.Details
dry rot repair in the front of the house stairs, new wood siding in kind paint, guardrails repair wood cedar siding. | $8,000 |
| Nov 16, 2017 | Completed final sign-off Mar 2018 | 132 Moffitt St | remove vinyl siding from front second level facade and replace with smooth finish stucco siding; retain existing wood fascia; bathroom remodel, new plumbing/fixtures, new electrical, new drywall, new insulationDetails
remove vinyl siding from front second level facade and replace with smooth finish stucco siding; retain existing wood fascia; bathroom remodel, new plumbing/fixtures, new electrical, new drywall, new insulation | $28,000 |
| Aug 30, 2017 | Completed final sign-off Feb 2018 | 3035 20th Av | remodel one bedroom: alter window openings, new window, new insulation, new drywall, new electrical. not visible front street.Details
remodel one bedroom: alter window openings, new window, new insulation, new drywall, new electrical. not visible front street. | $12,000 |
| Aug 17, 2017 | Completed final sign-off Nov 2017 | 2775 Diamond St | remodel kitchen, rework electrical/lighting, undersink plumbing, flooring, drywall, entryway into kitchen.Details
remodel kitchen, rework electrical/lighting, undersink plumbing, flooring, drywall, entryway into kitchen. | $50,000 |