Lobo Construction
- Based in
- Brisbane
- On San Francisco permits
- Apr 2008 to Apr 2008
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 29, 2008 | Completed final sign-off Jun 2008 | 8 San Gabriel Av | revision to pa# 2008/04/04/8819. install 13 vinyl double pane windows. install tile around (e) bathtub & bathroom floor. patch holes in bathroom with 1/2 sheetrock.Details
revision to pa# 2008/04/04/8819. install 13 vinyl double pane windows. install tile around (e) bathtub & bathroom floor. patch holes in bathroom with 1/2 sheetrock. | $6,000 |
| Apr 4, 2008 | Completed final sign-off Jun 2008 | 8 San Gabriel Av | kitchen remodel: insulate walls & ceiling, rewire kitchen (electrical work) sheetrock kitchen, tile floor. & install new cabinets & countertops. service upgrade. no structural work. 50% wattage must be high efficiency.Details
kitchen remodel: insulate walls & ceiling, rewire kitchen (electrical work) sheetrock kitchen, tile floor. & install new cabinets & countertops. service upgrade. no structural work. 50% wattage must be high efficiency. | $20,000 |