Liquid Design Aquatic Consulting Company
- Based in
- Tracy
- On San Francisco permits
- Feb 2021 to Oct 2025
- Last 24 months
- 1 permit filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 17, 2025 | Completed final sign-off Mar 2026 | 1075 California St | add steps for the swimming pool, replace equipment, replace coping plaster the pool.Details
add steps for the swimming pool, replace equipment, replace coping plaster the pool. | $100,000 |
| Feb 18, 2021 | Completed final sign-off May 2022 | 1001 Van Ness Av | gunite/concrete swimming pool construction. rebar reinforcing prior to gunite/concrete. rough plumbing of pool. rough electrical conduits for the pool lighting. bonding of the handrail anchors & ada lift anchor. supply and install cartridge filter, filter pump, heater, and chemistry control systemDetails
gunite/concrete swimming pool construction. rebar reinforcing prior to gunite/concrete. rough plumbing of pool. rough electrical conduits for the pool lighting. bonding of the handrail anchors & ada lift anchor. supply and install cartridge filter, filter pump, heater, and chemistry control system | $500,000 |