Limon Electric & Construction
- Based in
- Antioch
- On San Francisco permits
- Aug 2025 to Aug 2025
- Last 24 months
- 2 permits filed
2 permits since 2000: 1 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 29, 2025 | In progress issued Aug 2026 | 301 Surrey St | interior & exterior removation included convert (e) mechanical & laundry room to habitable space on main floor (115 sf). renovation to main fl & basement included 2 bathrooms & kitchen (remain in same place) addition of a roof deckDetails
interior & exterior removation included convert (e) mechanical & laundry room to habitable space on main floor (115 sf). renovation to main fl & basement included 2 bathrooms & kitchen (remain in same place) addition of a roof deck | $205,000 |
| Aug 15, 2025 | Completed final sign-off Dec 2025 | 2420 Mission St | sheet rock patch/replacement as necessary (approx. 4 sq ft). install floor sink for commercial compartment sink.Details
sheet rock patch/replacement as necessary (approx. 4 sq ft). install floor sink for commercial compartment sink. | $1,500 |